{"title":"在南非德班运营创新无下水道卫生设施商业化前现场测试平台的经验教训","authors":"RC Sindall, R Cottingham, P Arumugam, SJ Mercer, C Sutherland, N Alcock, CA Buckley, G Gounden","doi":"10.17159/wsa/2021.v47.i4.3880","DOIUrl":null,"url":null,"abstract":"The Engineering Field Testing Platform (EFTP) was designed to provide an opportunity for technology developers (TDs) to test non-sewered sanitation prototypes in the eThekwini Municipal Area (Durban), South Africa. Between 2017 and 2020, 15 sanitation systems were tested in informal settlements, peri-urban households, and other ‘real world’ settings. This paper illustrates the lessons learned from establishing and managing this testing platform. Costs and timelines for testing are dependent on several factors, including the aims of testing, the development stage of the prototype, whether testing takes place in a community or household setting and if a testing site is shared between prototypes. Timelines were routinely underestimated, particularly for community engagement and commissioning of prototypes to reach steady-state operation. Personnel accounted for more than half of the EFTP’s costs. The presence of the municipality as a platform partner was vital to the success of testing, both for gaining political support and for enabling access to testing sites. It is noted that working in communities, with test sites in public spaces, requires technical and social sensitivity to context. It was important to ensure testing supported future municipal decision-making on service provision, as well as longer-term development within communities. The high number of stakeholders, locally and internationally, raised management challenges common to any large project. However, the EFTP added value to TDs, the eThekwini Municipality, and communities requiring improved sanitation services; this was amplified through the platform approach.","PeriodicalId":23623,"journal":{"name":"Water SA","volume":"161 1","pages":""},"PeriodicalIF":1.0000,"publicationDate":"2021-10-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Lessons learned from operating a pre-commercialisation field-testing platform for innovative non-sewered sanitation in Durban, South Africa\",\"authors\":\"RC Sindall, R Cottingham, P Arumugam, SJ Mercer, C Sutherland, N Alcock, CA Buckley, G Gounden\",\"doi\":\"10.17159/wsa/2021.v47.i4.3880\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Engineering Field Testing Platform (EFTP) was designed to provide an opportunity for technology developers (TDs) to test non-sewered sanitation prototypes in the eThekwini Municipal Area (Durban), South Africa. Between 2017 and 2020, 15 sanitation systems were tested in informal settlements, peri-urban households, and other ‘real world’ settings. This paper illustrates the lessons learned from establishing and managing this testing platform. Costs and timelines for testing are dependent on several factors, including the aims of testing, the development stage of the prototype, whether testing takes place in a community or household setting and if a testing site is shared between prototypes. Timelines were routinely underestimated, particularly for community engagement and commissioning of prototypes to reach steady-state operation. Personnel accounted for more than half of the EFTP’s costs. The presence of the municipality as a platform partner was vital to the success of testing, both for gaining political support and for enabling access to testing sites. It is noted that working in communities, with test sites in public spaces, requires technical and social sensitivity to context. It was important to ensure testing supported future municipal decision-making on service provision, as well as longer-term development within communities. The high number of stakeholders, locally and internationally, raised management challenges common to any large project. However, the EFTP added value to TDs, the eThekwini Municipality, and communities requiring improved sanitation services; this was amplified through the platform approach.\",\"PeriodicalId\":23623,\"journal\":{\"name\":\"Water SA\",\"volume\":\"161 1\",\"pages\":\"\"},\"PeriodicalIF\":1.0000,\"publicationDate\":\"2021-10-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Water SA\",\"FirstCategoryId\":\"93\",\"ListUrlMain\":\"https://doi.org/10.17159/wsa/2021.v47.i4.3880\",\"RegionNum\":4,\"RegionCategory\":\"环境科学与生态学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"WATER RESOURCES\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Water SA","FirstCategoryId":"93","ListUrlMain":"https://doi.org/10.17159/wsa/2021.v47.i4.3880","RegionNum":4,"RegionCategory":"环境科学与生态学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"WATER RESOURCES","Score":null,"Total":0}
Lessons learned from operating a pre-commercialisation field-testing platform for innovative non-sewered sanitation in Durban, South Africa
The Engineering Field Testing Platform (EFTP) was designed to provide an opportunity for technology developers (TDs) to test non-sewered sanitation prototypes in the eThekwini Municipal Area (Durban), South Africa. Between 2017 and 2020, 15 sanitation systems were tested in informal settlements, peri-urban households, and other ‘real world’ settings. This paper illustrates the lessons learned from establishing and managing this testing platform. Costs and timelines for testing are dependent on several factors, including the aims of testing, the development stage of the prototype, whether testing takes place in a community or household setting and if a testing site is shared between prototypes. Timelines were routinely underestimated, particularly for community engagement and commissioning of prototypes to reach steady-state operation. Personnel accounted for more than half of the EFTP’s costs. The presence of the municipality as a platform partner was vital to the success of testing, both for gaining political support and for enabling access to testing sites. It is noted that working in communities, with test sites in public spaces, requires technical and social sensitivity to context. It was important to ensure testing supported future municipal decision-making on service provision, as well as longer-term development within communities. The high number of stakeholders, locally and internationally, raised management challenges common to any large project. However, the EFTP added value to TDs, the eThekwini Municipality, and communities requiring improved sanitation services; this was amplified through the platform approach.
期刊介绍:
WaterSA publishes refereed, original work in all branches of water science, technology and engineering. This includes water resources development; the hydrological cycle; surface hydrology; geohydrology and hydrometeorology; limnology; salinisation; treatment and management of municipal and industrial water and wastewater; treatment and disposal of sewage sludge; environmental pollution control; water quality and treatment; aquaculture in terms of its impact on the water resource; agricultural water science; etc.
Water SA is the WRC’s accredited scientific journal which contains original research articles and review articles on all aspects of water science, technology, engineering and policy. Water SA has been in publication since 1975 and includes articles from both local and international authors. The journal is issued quarterly (4 editions per year).