{"title":"黑山采蒂涅城市体育场钢屋顶结构设计与施工/Entwurf und Bau der stählernen dachkonstruction des Stadtstadions in采蒂涅,黑山","authors":"Duško Lučić, Tome Trombev, Mladen Muhadinović","doi":"10.37544/0005-6650-2022-09-35","DOIUrl":null,"url":null,"abstract":"The design, production and erection of the steel roof structure of the City Stadium in Cetinje, Montenegro are presented. The roof structure is supported by reinforced concrete pillars and beams. Two mirror-like constructions covering the west and east grandstands were made. One roof structure consists of 16 radially placed arch girders. Roof girders are designed as double cantilever lattice girders. The main lattice girders were made from Circular Hollow Section (CHS). The design of the structure was done by the Civil Engineering Institute, Podgorica, Montenegro, while the construction, production and erection of the structure were done by Monting Engineering, Bitola, Republic of North Macedonia within the agreed period of 150 days.","PeriodicalId":55399,"journal":{"name":"Bauingenieur","volume":"2 1","pages":""},"PeriodicalIF":0.4000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Design and Construction of the Steel Roof Structure of the City Stadium in Cetinje, Montenegro/Entwurf und Bau der stählernen Dachkonstruktion des Stadtstadions in Cetinje, Montenegro\",\"authors\":\"Duško Lučić, Tome Trombev, Mladen Muhadinović\",\"doi\":\"10.37544/0005-6650-2022-09-35\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The design, production and erection of the steel roof structure of the City Stadium in Cetinje, Montenegro are presented. The roof structure is supported by reinforced concrete pillars and beams. Two mirror-like constructions covering the west and east grandstands were made. One roof structure consists of 16 radially placed arch girders. Roof girders are designed as double cantilever lattice girders. The main lattice girders were made from Circular Hollow Section (CHS). The design of the structure was done by the Civil Engineering Institute, Podgorica, Montenegro, while the construction, production and erection of the structure were done by Monting Engineering, Bitola, Republic of North Macedonia within the agreed period of 150 days.\",\"PeriodicalId\":55399,\"journal\":{\"name\":\"Bauingenieur\",\"volume\":\"2 1\",\"pages\":\"\"},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bauingenieur\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.37544/0005-6650-2022-09-35\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bauingenieur","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.37544/0005-6650-2022-09-35","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
Design and Construction of the Steel Roof Structure of the City Stadium in Cetinje, Montenegro/Entwurf und Bau der stählernen Dachkonstruktion des Stadtstadions in Cetinje, Montenegro
The design, production and erection of the steel roof structure of the City Stadium in Cetinje, Montenegro are presented. The roof structure is supported by reinforced concrete pillars and beams. Two mirror-like constructions covering the west and east grandstands were made. One roof structure consists of 16 radially placed arch girders. Roof girders are designed as double cantilever lattice girders. The main lattice girders were made from Circular Hollow Section (CHS). The design of the structure was done by the Civil Engineering Institute, Podgorica, Montenegro, while the construction, production and erection of the structure were done by Monting Engineering, Bitola, Republic of North Macedonia within the agreed period of 150 days.
期刊介绍:
Die Zeitschrift Bauingenieur bietet Aufsätze über Theorie und Praxis des konstruktiven Ingenieurbaus, der Mechanik, der Geotechnik und des Baubetriebs und Baumanagements. Darüber hinaus enthält die Zeitschrift Bauingenieur Berichte und Reportagen über interessante Bauausführungen und Bausanierungen im In- und Ausland, Baustofffragen und Bauinformatik.