化工协同开发过程的基于活动的优化

Bernhard Kausch, M. Grandt, C. Schlick
{"title":"化工协同开发过程的基于活动的优化","authors":"Bernhard Kausch, M. Grandt, C. Schlick","doi":"10.1145/1357910.1358007","DOIUrl":null,"url":null,"abstract":"Unused potentials of cooperative development work are proven to lie mainly in the sub-optimal communication, cooperation and coordination of the actors. Various methods and tools, from project modeling to the workflow management system, are used to develop these potentials. Decisive influencing parameters of cooperative development processes are hardly considered in these approaches. Thus, the IAW is pursuing an activity-centered approach in which, based on a participatory constructed task net, important influencing parameters are transferred into a time-extended higher Petri net. \n \nMathematical relationships illustrate the interaction of these influencing parameters. These parameters include - aside from obligatory measures, such as number of people, task dependencies or related tools - special influencing parameters such as information integration and the qualification of people. \n \nThe software presented in the following includes, for example, specific human resource allocation through forecasted personnel utilization, existing competencies and organizational structures, reduction of waiting times through improvement of information flow and the increase in tool utilization. \n \nBeside the use for project planning, the article illustrates the function and relation of the individual Petri nets via a short example. The article also demonstrates the relevance and interaction of the individual influencing parameters considered in the simulation through a sensitivity analysis.","PeriodicalId":91410,"journal":{"name":"Summer Computer Simulation Conference : (SCSC 2014) : 2014 Summer Simulation Multi-Conference : Monterey, California, USA, 6-10 July 2014. Summer Computer Simulation Conference (2014 : Monterey, Calif.)","volume":"07 1","pages":"619-626"},"PeriodicalIF":0.0000,"publicationDate":"2007-07-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Activity-based optimization of cooperative development processes in chemical engineering\",\"authors\":\"Bernhard Kausch, M. Grandt, C. Schlick\",\"doi\":\"10.1145/1357910.1358007\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Unused potentials of cooperative development work are proven to lie mainly in the sub-optimal communication, cooperation and coordination of the actors. Various methods and tools, from project modeling to the workflow management system, are used to develop these potentials. Decisive influencing parameters of cooperative development processes are hardly considered in these approaches. Thus, the IAW is pursuing an activity-centered approach in which, based on a participatory constructed task net, important influencing parameters are transferred into a time-extended higher Petri net. \\n \\nMathematical relationships illustrate the interaction of these influencing parameters. These parameters include - aside from obligatory measures, such as number of people, task dependencies or related tools - special influencing parameters such as information integration and the qualification of people. \\n \\nThe software presented in the following includes, for example, specific human resource allocation through forecasted personnel utilization, existing competencies and organizational structures, reduction of waiting times through improvement of information flow and the increase in tool utilization. \\n \\nBeside the use for project planning, the article illustrates the function and relation of the individual Petri nets via a short example. The article also demonstrates the relevance and interaction of the individual influencing parameters considered in the simulation through a sensitivity analysis.\",\"PeriodicalId\":91410,\"journal\":{\"name\":\"Summer Computer Simulation Conference : (SCSC 2014) : 2014 Summer Simulation Multi-Conference : Monterey, California, USA, 6-10 July 2014. Summer Computer Simulation Conference (2014 : Monterey, Calif.)\",\"volume\":\"07 1\",\"pages\":\"619-626\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-07-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Summer Computer Simulation Conference : (SCSC 2014) : 2014 Summer Simulation Multi-Conference : Monterey, California, USA, 6-10 July 2014. Summer Computer Simulation Conference (2014 : Monterey, Calif.)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/1357910.1358007\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Summer Computer Simulation Conference : (SCSC 2014) : 2014 Summer Simulation Multi-Conference : Monterey, California, USA, 6-10 July 2014. Summer Computer Simulation Conference (2014 : Monterey, Calif.)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/1357910.1358007","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

事实证明,合作开发工作未被利用的潜力主要在于参与者之间的沟通、合作和协调不够理想。各种方法和工具,从项目建模到工作流管理系统,都被用来开发这些潜力。这些方法很少考虑合作开发过程的决定性影响参数。因此,法学会正在采取一种以活动为中心的方法,在参与性构建的任务网的基础上,将重要的影响参数转移到一个延长时间的更高的Petri网中。数学关系说明了这些影响参数的相互作用。这些参数除了强制性措施,如人员数量、任务依赖关系或相关工具外,还包括特殊影响参数,如信息整合和人员资格。下面介绍的软件包括,例如,通过预测人员利用,现有能力和组织结构,具体的人力资源分配,通过改善信息流和增加工具利用来减少等待时间。除了用于项目规划外,文章还通过一个简短的例子说明了各个Petri网的功能和关系。本文还通过灵敏度分析论证了仿真中考虑的各个影响参数之间的相关性和相互作用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Activity-based optimization of cooperative development processes in chemical engineering
Unused potentials of cooperative development work are proven to lie mainly in the sub-optimal communication, cooperation and coordination of the actors. Various methods and tools, from project modeling to the workflow management system, are used to develop these potentials. Decisive influencing parameters of cooperative development processes are hardly considered in these approaches. Thus, the IAW is pursuing an activity-centered approach in which, based on a participatory constructed task net, important influencing parameters are transferred into a time-extended higher Petri net. Mathematical relationships illustrate the interaction of these influencing parameters. These parameters include - aside from obligatory measures, such as number of people, task dependencies or related tools - special influencing parameters such as information integration and the qualification of people. The software presented in the following includes, for example, specific human resource allocation through forecasted personnel utilization, existing competencies and organizational structures, reduction of waiting times through improvement of information flow and the increase in tool utilization. Beside the use for project planning, the article illustrates the function and relation of the individual Petri nets via a short example. The article also demonstrates the relevance and interaction of the individual influencing parameters considered in the simulation through a sensitivity analysis.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信