单资源中心应急调度工程

Xianyu Yu , Yulin Zhang
{"title":"单资源中心应急调度工程","authors":"Xianyu Yu ,&nbsp;Yulin Zhang","doi":"10.1016/j.sepro.2012.04.017","DOIUrl":null,"url":null,"abstract":"<div><p>This paper attempts to study the scheduling scheme in emergency resource center. The scheduling engineering in resource center can be divided into two stages: the normal stage and emergency stage. In the normal stage, orders come brokenly to the resource center in small number, and the order seldom has emergency requirement. In contrast, a large number of orders, which always have different emergency requirements, reach the resource center in a very short time. This paper analyzes the differences between the normal stage and emergency stage, and proposes the corresponding scheduling methods of two stages. In order to feed the different emergency requirements of orders, various weights are given to different orders. A polynomial algorithm is proposed to minimize the weighted makespan of emergency resource scheduling. Furthermore, a dynamic algorithm is designed to solve the dynamic emergency scheduling.</p></div>","PeriodicalId":101207,"journal":{"name":"Systems Engineering Procedia","volume":"5 ","pages":"Pages 107-112"},"PeriodicalIF":0.0000,"publicationDate":"2012-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/j.sepro.2012.04.017","citationCount":"4","resultStr":"{\"title\":\"The Emergency Scheduling Engineering in Single Resource Center\",\"authors\":\"Xianyu Yu ,&nbsp;Yulin Zhang\",\"doi\":\"10.1016/j.sepro.2012.04.017\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>This paper attempts to study the scheduling scheme in emergency resource center. The scheduling engineering in resource center can be divided into two stages: the normal stage and emergency stage. In the normal stage, orders come brokenly to the resource center in small number, and the order seldom has emergency requirement. In contrast, a large number of orders, which always have different emergency requirements, reach the resource center in a very short time. This paper analyzes the differences between the normal stage and emergency stage, and proposes the corresponding scheduling methods of two stages. In order to feed the different emergency requirements of orders, various weights are given to different orders. A polynomial algorithm is proposed to minimize the weighted makespan of emergency resource scheduling. Furthermore, a dynamic algorithm is designed to solve the dynamic emergency scheduling.</p></div>\",\"PeriodicalId\":101207,\"journal\":{\"name\":\"Systems Engineering Procedia\",\"volume\":\"5 \",\"pages\":\"Pages 107-112\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/j.sepro.2012.04.017\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Systems Engineering Procedia\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S2211381912000604\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Systems Engineering Procedia","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2211381912000604","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

本文试图对应急资源中心的调度方案进行研究。资源中心调度工程可分为正常调度阶段和应急调度阶段。在正常阶段,资源中心的订单断断续续,数量较少,订单很少有紧急需求。相比之下,大量的订单,总是有不同的应急需求,在很短的时间内到达资源中心。分析了正常阶段和应急阶段的区别,提出了两阶段相应的调度方法。为了满足不同订单的应急需求,对不同订单赋予了不同的权重。提出了一种最小化应急资源调度加权最大完工时间的多项式算法。在此基础上,设计了一种求解动态应急调度的动态算法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Emergency Scheduling Engineering in Single Resource Center

This paper attempts to study the scheduling scheme in emergency resource center. The scheduling engineering in resource center can be divided into two stages: the normal stage and emergency stage. In the normal stage, orders come brokenly to the resource center in small number, and the order seldom has emergency requirement. In contrast, a large number of orders, which always have different emergency requirements, reach the resource center in a very short time. This paper analyzes the differences between the normal stage and emergency stage, and proposes the corresponding scheduling methods of two stages. In order to feed the different emergency requirements of orders, various weights are given to different orders. A polynomial algorithm is proposed to minimize the weighted makespan of emergency resource scheduling. Furthermore, a dynamic algorithm is designed to solve the dynamic emergency scheduling.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信