栅格搅拌湍流:泥沙运动起始和上升研究的应用

P. Medina, M.A. Sánchez, J.M. Redondo
{"title":"栅格搅拌湍流:泥沙运动起始和上升研究的应用","authors":"P. Medina,&nbsp;M.A. Sánchez,&nbsp;J.M. Redondo","doi":"10.1016/S1464-1909(01)00010-7","DOIUrl":null,"url":null,"abstract":"<div><p>A laboratory experimental set - up for studying the behaviour of sediment in presence of a turbulent field with zero mean flow is presented. Particular interest is shown on the initiation of sediment motion and in the sediment lift - off. Some examples of the results obtained with this set-up are shown.</p><p>A turbulent velocity <em>u</em>′ lower than that u estimated by the Shield diagram is required to start sediment motion. The minimum <em>u</em>′ required to start sediment lift - off, is a function of sediment size, cohesivity and resting time. The lutocline height depends on <em>u</em>′, and the vorticity at the lutocline seems constant for a fixed sediment size. Combining grid stirring and image analysis, sediment vertical fluxes and settling speeds could be measured.</p></div>","PeriodicalId":101025,"journal":{"name":"Physics and Chemistry of the Earth, Part B: Hydrology, Oceans and Atmosphere","volume":"26 4","pages":"Pages 299-304"},"PeriodicalIF":0.0000,"publicationDate":"2001-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/S1464-1909(01)00010-7","citationCount":"27","resultStr":"{\"title\":\"Grid stirred turbulence: applications to the initiation of sediment motion and lift-off studies\",\"authors\":\"P. Medina,&nbsp;M.A. Sánchez,&nbsp;J.M. Redondo\",\"doi\":\"10.1016/S1464-1909(01)00010-7\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>A laboratory experimental set - up for studying the behaviour of sediment in presence of a turbulent field with zero mean flow is presented. Particular interest is shown on the initiation of sediment motion and in the sediment lift - off. Some examples of the results obtained with this set-up are shown.</p><p>A turbulent velocity <em>u</em>′ lower than that u estimated by the Shield diagram is required to start sediment motion. The minimum <em>u</em>′ required to start sediment lift - off, is a function of sediment size, cohesivity and resting time. The lutocline height depends on <em>u</em>′, and the vorticity at the lutocline seems constant for a fixed sediment size. Combining grid stirring and image analysis, sediment vertical fluxes and settling speeds could be measured.</p></div>\",\"PeriodicalId\":101025,\"journal\":{\"name\":\"Physics and Chemistry of the Earth, Part B: Hydrology, Oceans and Atmosphere\",\"volume\":\"26 4\",\"pages\":\"Pages 299-304\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2001-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/S1464-1909(01)00010-7\",\"citationCount\":\"27\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Physics and Chemistry of the Earth, Part B: Hydrology, Oceans and Atmosphere\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S1464190901000107\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Physics and Chemistry of the Earth, Part B: Hydrology, Oceans and Atmosphere","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S1464190901000107","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 27

摘要

提出了一种用于研究平均流为零的湍流场下泥沙行为的实验室实验装置。对泥沙运动的开始和泥沙的抬升特别感兴趣。下面给出了用这种设置得到的一些结果的例子。泥沙运动需要湍流速度u '小于盾构图估计的u '。启动泥沙抬升所需的最小u′是泥沙大小、黏结性和静息时间的函数。卢斜高度取决于u′,对于固定的沉积物大小,卢斜处的涡度似乎是恒定的。结合网格搅拌和图像分析,可以测量沉积物的垂直通量和沉降速度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Grid stirred turbulence: applications to the initiation of sediment motion and lift-off studies

A laboratory experimental set - up for studying the behaviour of sediment in presence of a turbulent field with zero mean flow is presented. Particular interest is shown on the initiation of sediment motion and in the sediment lift - off. Some examples of the results obtained with this set-up are shown.

A turbulent velocity u′ lower than that u estimated by the Shield diagram is required to start sediment motion. The minimum u′ required to start sediment lift - off, is a function of sediment size, cohesivity and resting time. The lutocline height depends on u′, and the vorticity at the lutocline seems constant for a fixed sediment size. Combining grid stirring and image analysis, sediment vertical fluxes and settling speeds could be measured.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信