从透水路面收集雨水的财务可行性:以城市广场为例

Decis. Sci. Pub Date : 2023-01-03 DOI:10.3390/sci5010001
Caio Wolf Klein, Jéssica Kuntz Maykot, E. Ghisi, L. Thives
{"title":"从透水路面收集雨水的财务可行性:以城市广场为例","authors":"Caio Wolf Klein, Jéssica Kuntz Maykot, E. Ghisi, L. Thives","doi":"10.3390/sci5010001","DOIUrl":null,"url":null,"abstract":"The objective of this study was to carry out the financial feasibility analysis of harvesting rainwater from permeable pavements in a city square. A case study was carried out in a square close to the beach in the city of Florianópolis, Brazil. Questionnaires were applied to pedestrians who circulate within the area. The square is to be implemented to promote sustainability and improve the user’s quality of life. From the rainfall data and the average daily water demand for irrigation of the square vegetation, the volume of rainwater to be harvested from the permeable pavement was calculated. The rainwater demand was estimated as 662 L/day. The implementation and operation costs of the pavement and irrigation systems were evaluated. The potential for potable water savings was 89.8%. The payback period was estimated as 347 months. This study showed that rainwater collected from permeable pavements is financially feasible and represents a promising technique.","PeriodicalId":10987,"journal":{"name":"Decis. Sci.","volume":"27 16 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-01-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Financial Feasibility of Harvesting Rainwater from Permeable Pavements: A Case Study in a City Square\",\"authors\":\"Caio Wolf Klein, Jéssica Kuntz Maykot, E. Ghisi, L. Thives\",\"doi\":\"10.3390/sci5010001\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The objective of this study was to carry out the financial feasibility analysis of harvesting rainwater from permeable pavements in a city square. A case study was carried out in a square close to the beach in the city of Florianópolis, Brazil. Questionnaires were applied to pedestrians who circulate within the area. The square is to be implemented to promote sustainability and improve the user’s quality of life. From the rainfall data and the average daily water demand for irrigation of the square vegetation, the volume of rainwater to be harvested from the permeable pavement was calculated. The rainwater demand was estimated as 662 L/day. The implementation and operation costs of the pavement and irrigation systems were evaluated. The potential for potable water savings was 89.8%. The payback period was estimated as 347 months. This study showed that rainwater collected from permeable pavements is financially feasible and represents a promising technique.\",\"PeriodicalId\":10987,\"journal\":{\"name\":\"Decis. Sci.\",\"volume\":\"27 16 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Decis. Sci.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3390/sci5010001\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Decis. Sci.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3390/sci5010001","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本研究的目的是对城市广场透水路面收集雨水进行财务可行性分析。案例研究是在巴西Florianópolis市靠近海滩的一个广场进行的。调查问卷应用于在该区域内行走的行人。该广场的实施旨在促进可持续性,提高用户的生活质量。根据降雨数据和广场植被灌溉的日均需水量,计算透水路面的雨水蓄积量。雨水需求量估计为662升/天。对路面和灌溉系统的实施和运行成本进行了评估。节约饮用水的潜力为89.8%。预计投资回收期为347个月。这项研究表明,从透水路面收集雨水在经济上是可行的,是一项有前途的技术。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Financial Feasibility of Harvesting Rainwater from Permeable Pavements: A Case Study in a City Square
The objective of this study was to carry out the financial feasibility analysis of harvesting rainwater from permeable pavements in a city square. A case study was carried out in a square close to the beach in the city of Florianópolis, Brazil. Questionnaires were applied to pedestrians who circulate within the area. The square is to be implemented to promote sustainability and improve the user’s quality of life. From the rainfall data and the average daily water demand for irrigation of the square vegetation, the volume of rainwater to be harvested from the permeable pavement was calculated. The rainwater demand was estimated as 662 L/day. The implementation and operation costs of the pavement and irrigation systems were evaluated. The potential for potable water savings was 89.8%. The payback period was estimated as 347 months. This study showed that rainwater collected from permeable pavements is financially feasible and represents a promising technique.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信