Refdilzon Yasra, Dasman Johan, Muhammad Fajri Hafiizh
{"title":"分析焊接在d百货公司的焊接过程,以减少焊接过程的危险","authors":"Refdilzon Yasra, Dasman Johan, Muhammad Fajri Hafiizh","doi":"10.55642/eatij.v4i02.195","DOIUrl":null,"url":null,"abstract":"The method that will be used in this research is the Continuous improvement method. Process improvement using the Continuous improvement method can prevent abnormal welding processes, and it is carried out continuously so that it can improve work processes and achieve good employee productivity. The Work Sampling method is used to conduct a large number of observations on the work activities of machines, processes, workers or operators at the Welding Shop Department of PT. Cameron Systems Batam. Based on the research, the standard time of the current Bonnet welding process is 1167.5 minutes or equal to 19 hours 45 minutes for 1 unit of Bonnet welding. The focus of method improvement carried out on fishbone analysis, including Man (Operator), Method (Method), Material, Machine, (Machine), Measurements, Milieu (Environment) factors. It is an improvement priority that must be applied to the welding shop department in increasing the productivity of current employees.","PeriodicalId":23662,"journal":{"name":"World Academy of Science, Engineering and Technology, International Journal of Nutrition and Food Engineering","volume":"34 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-07-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analisis Proses Pengelasan Pada Bonnet d Departemen Welding Shop Untuk Mengurangi Resiko Kerusakan Pada Proses Pengelasan\",\"authors\":\"Refdilzon Yasra, Dasman Johan, Muhammad Fajri Hafiizh\",\"doi\":\"10.55642/eatij.v4i02.195\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The method that will be used in this research is the Continuous improvement method. Process improvement using the Continuous improvement method can prevent abnormal welding processes, and it is carried out continuously so that it can improve work processes and achieve good employee productivity. The Work Sampling method is used to conduct a large number of observations on the work activities of machines, processes, workers or operators at the Welding Shop Department of PT. Cameron Systems Batam. Based on the research, the standard time of the current Bonnet welding process is 1167.5 minutes or equal to 19 hours 45 minutes for 1 unit of Bonnet welding. The focus of method improvement carried out on fishbone analysis, including Man (Operator), Method (Method), Material, Machine, (Machine), Measurements, Milieu (Environment) factors. It is an improvement priority that must be applied to the welding shop department in increasing the productivity of current employees.\",\"PeriodicalId\":23662,\"journal\":{\"name\":\"World Academy of Science, Engineering and Technology, International Journal of Nutrition and Food Engineering\",\"volume\":\"34 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-07-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"World Academy of Science, Engineering and Technology, International Journal of Nutrition and Food Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55642/eatij.v4i02.195\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"World Academy of Science, Engineering and Technology, International Journal of Nutrition and Food Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55642/eatij.v4i02.195","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
本研究将采用的方法是持续改进法。采用持续改进方法进行过程改进,可以防止焊接过程出现异常,并持续进行,从而改进工作流程,实现良好的员工生产率。工作抽样法用于对PT. Cameron Systems Batam焊接车间部门的机器、工艺、工人或操作员的工作活动进行大量观察。经研究,目前阀帽焊接工艺的标准时间为1167.5分钟,即1台阀帽焊接的标准时间为19小时45分钟。方法改进的重点是鱼骨分析,包括人(操作员)、方法(方法)、材料、机器(机器)、测量、环境(环境)因素。这是焊接车间部门在提高现有员工生产率方面必须优先考虑的改进事项。
Analisis Proses Pengelasan Pada Bonnet d Departemen Welding Shop Untuk Mengurangi Resiko Kerusakan Pada Proses Pengelasan
The method that will be used in this research is the Continuous improvement method. Process improvement using the Continuous improvement method can prevent abnormal welding processes, and it is carried out continuously so that it can improve work processes and achieve good employee productivity. The Work Sampling method is used to conduct a large number of observations on the work activities of machines, processes, workers or operators at the Welding Shop Department of PT. Cameron Systems Batam. Based on the research, the standard time of the current Bonnet welding process is 1167.5 minutes or equal to 19 hours 45 minutes for 1 unit of Bonnet welding. The focus of method improvement carried out on fishbone analysis, including Man (Operator), Method (Method), Material, Machine, (Machine), Measurements, Milieu (Environment) factors. It is an improvement priority that must be applied to the welding shop department in increasing the productivity of current employees.