{"title":"分析焊接在d百货公司的焊接过程,以减少焊接过程的危险","authors":"Refdilzon Yasra, Dasman Johan, Muhammad Fajri Hafiizh","doi":"10.55642/eatij.v4i02.195","DOIUrl":null,"url":null,"abstract":"The method that will be used in this research is the Continuous improvement method. Process improvement using the Continuous improvement method can prevent abnormal welding processes, and it is carried out continuously so that it can improve work processes and achieve good employee productivity. The Work Sampling method is used to conduct a large number of observations on the work activities of machines, processes, workers or operators at the Welding Shop Department of PT. Cameron Systems Batam. Based on the research, the standard time of the current Bonnet welding process is 1167.5 minutes or equal to 19 hours 45 minutes for 1 unit of Bonnet welding. The focus of method improvement carried out on fishbone analysis, including Man (Operator), Method (Method), Material, Machine, (Machine), Measurements, Milieu (Environment) factors. It is an improvement priority that must be applied to the welding shop department in increasing the productivity of current employees.","PeriodicalId":23662,"journal":{"name":"World Academy of Science, Engineering and Technology, International Journal of Nutrition and Food Engineering","volume":"34 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-07-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analisis Proses Pengelasan Pada Bonnet d Departemen Welding Shop Untuk Mengurangi Resiko Kerusakan Pada Proses Pengelasan\",\"authors\":\"Refdilzon Yasra, Dasman Johan, Muhammad Fajri Hafiizh\",\"doi\":\"10.55642/eatij.v4i02.195\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The method that will be used in this research is the Continuous improvement method. Process improvement using the Continuous improvement method can prevent abnormal welding processes, and it is carried out continuously so that it can improve work processes and achieve good employee productivity. The Work Sampling method is used to conduct a large number of observations on the work activities of machines, processes, workers or operators at the Welding Shop Department of PT. Cameron Systems Batam. Based on the research, the standard time of the current Bonnet welding process is 1167.5 minutes or equal to 19 hours 45 minutes for 1 unit of Bonnet welding. The focus of method improvement carried out on fishbone analysis, including Man (Operator), Method (Method), Material, Machine, (Machine), Measurements, Milieu (Environment) factors. It is an improvement priority that must be applied to the welding shop department in increasing the productivity of current employees.\",\"PeriodicalId\":23662,\"journal\":{\"name\":\"World Academy of Science, Engineering and Technology, International Journal of Nutrition and Food Engineering\",\"volume\":\"34 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-07-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"World Academy of Science, Engineering and Technology, International Journal of Nutrition and Food Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55642/eatij.v4i02.195\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"World Academy of Science, Engineering and Technology, International Journal of Nutrition and Food Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55642/eatij.v4i02.195","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究将采用的方法是持续改进法。采用持续改进方法进行过程改进,可以防止焊接过程出现异常,并持续进行,从而改进工作流程,实现良好的员工生产率。工作抽样法用于对PT. Cameron Systems Batam焊接车间部门的机器、工艺、工人或操作员的工作活动进行大量观察。经研究,目前阀帽焊接工艺的标准时间为1167.5分钟,即1台阀帽焊接的标准时间为19小时45分钟。方法改进的重点是鱼骨分析,包括人(操作员)、方法(方法)、材料、机器(机器)、测量、环境(环境)因素。这是焊接车间部门在提高现有员工生产率方面必须优先考虑的改进事项。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analisis Proses Pengelasan Pada Bonnet d Departemen Welding Shop Untuk Mengurangi Resiko Kerusakan Pada Proses Pengelasan
The method that will be used in this research is the Continuous improvement method. Process improvement using the Continuous improvement method can prevent abnormal welding processes, and it is carried out continuously so that it can improve work processes and achieve good employee productivity. The Work Sampling method is used to conduct a large number of observations on the work activities of machines, processes, workers or operators at the Welding Shop Department of PT. Cameron Systems Batam. Based on the research, the standard time of the current Bonnet welding process is 1167.5 minutes or equal to 19 hours 45 minutes for 1 unit of Bonnet welding. The focus of method improvement carried out on fishbone analysis, including Man (Operator), Method (Method), Material, Machine, (Machine), Measurements, Milieu (Environment) factors. It is an improvement priority that must be applied to the welding shop department in increasing the productivity of current employees.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信