垃圾填埋场附近建筑物突然开裂的实例分析

IF 0.4 Q4 ENGINEERING, CIVIL
Q. Zhang, Xiaoyong Xu, Qiang Zhao
{"title":"垃圾填埋场附近建筑物突然开裂的实例分析","authors":"Q. Zhang, Xiaoyong Xu, Qiang Zhao","doi":"10.1680/jfoen.22.00010","DOIUrl":null,"url":null,"abstract":"The causes of cracks in 6-storey building are studied. Based on analyses of crack morphology, settlement observation and geological survey, it is determined that the landfill pit and uneven settlement is the main cause of cracks. The July 20th Zhengzhou Rainstorm caused a sharp rise of groundwater level, so that the uneven settlement of the office building near the landfill pit intensified, and then the wall cracking is followed. The interaction between buildings and landfill pits under different water levels is studied by three-dimensional numerical simulation. As the water level rise, the horizontal displacement of soil in the landfill pit increase, and the lateral constraint of landfill soil to foundation soil decrease, the result is that the settlement of column foundation near the landfill pits increases and the differential settlement intensifies. According to the analysis results, the further development of differential settlement and cracks are evaluated and the treatment suggestions are given.","PeriodicalId":42902,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Forensic Engineering","volume":null,"pages":null},"PeriodicalIF":0.4000,"publicationDate":"2022-08-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Case analysis of sudden cracking in buildings near landfill pit\",\"authors\":\"Q. Zhang, Xiaoyong Xu, Qiang Zhao\",\"doi\":\"10.1680/jfoen.22.00010\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The causes of cracks in 6-storey building are studied. Based on analyses of crack morphology, settlement observation and geological survey, it is determined that the landfill pit and uneven settlement is the main cause of cracks. The July 20th Zhengzhou Rainstorm caused a sharp rise of groundwater level, so that the uneven settlement of the office building near the landfill pit intensified, and then the wall cracking is followed. The interaction between buildings and landfill pits under different water levels is studied by three-dimensional numerical simulation. As the water level rise, the horizontal displacement of soil in the landfill pit increase, and the lateral constraint of landfill soil to foundation soil decrease, the result is that the settlement of column foundation near the landfill pits increases and the differential settlement intensifies. According to the analysis results, the further development of differential settlement and cracks are evaluated and the treatment suggestions are given.\",\"PeriodicalId\":42902,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Forensic Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2022-08-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Forensic Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/jfoen.22.00010\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Forensic Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jfoen.22.00010","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

研究了某6层建筑裂缝产生的原因。通过裂缝形态分析、沉降观测和地质调查,确定了填埋坑和不均匀沉降是产生裂缝的主要原因。7月20日郑州暴雨导致地下水位急剧上升,使填埋坑附近办公楼不均匀沉降加剧,墙体开裂随之而来。采用三维数值模拟方法,研究了不同水位下建筑物与填埋场的相互作用。随着水位的升高,填埋坑内土体水平位移增大,填埋土对地基土的侧向约束减小,导致填埋坑附近柱基础沉降增大,差异沉降加剧。根据分析结果,对不同沉降和裂缝的进一步发展进行了评价,并提出了处理建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Case analysis of sudden cracking in buildings near landfill pit
The causes of cracks in 6-storey building are studied. Based on analyses of crack morphology, settlement observation and geological survey, it is determined that the landfill pit and uneven settlement is the main cause of cracks. The July 20th Zhengzhou Rainstorm caused a sharp rise of groundwater level, so that the uneven settlement of the office building near the landfill pit intensified, and then the wall cracking is followed. The interaction between buildings and landfill pits under different water levels is studied by three-dimensional numerical simulation. As the water level rise, the horizontal displacement of soil in the landfill pit increase, and the lateral constraint of landfill soil to foundation soil decrease, the result is that the settlement of column foundation near the landfill pits increases and the differential settlement intensifies. According to the analysis results, the further development of differential settlement and cracks are evaluated and the treatment suggestions are given.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.70
自引率
0.00%
发文量
28
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信