通过仿真分析了卷筒-缓冲-绳索调度系统的可执行性

Servet Hasgül, Zuhal Kartal
{"title":"通过仿真分析了卷筒-缓冲-绳索调度系统的可执行性","authors":"Servet Hasgül, Zuhal Kartal","doi":"10.1145/1357910.1358103","DOIUrl":null,"url":null,"abstract":"This study was carried out in a plastic workshop of a refrigerator factory to solve problems of excessive work in process. In order to provide synchronous manufacturing between Capacity Constrained Resources (CCR) and non-Capacity Constraint Resources (non-CCR), an approach was developed based on the Drum-Buffer-Rope (DBR) scheduling system, which was intended for solving problems such as this. The approach was based on a heuristic that integrates Wagner-Whitin's algorithm and finite loading method to determine optimum lot sizes for non-CCR machine's material release schedule. A simulation model was used to analyze whether an improved scheduling approach was appropriate or not. An experimental study was also conducted to determine the time buffers.","PeriodicalId":91410,"journal":{"name":"Summer Computer Simulation Conference : (SCSC 2014) : 2014 Summer Simulation Multi-Conference : Monterey, California, USA, 6-10 July 2014. Summer Computer Simulation Conference (2014 : Monterey, Calif.)","volume":"1008 1","pages":"1243-1249"},"PeriodicalIF":0.0000,"publicationDate":"2007-07-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Analyzing a drum-buffer-rope scheduling system executability through simulation\",\"authors\":\"Servet Hasgül, Zuhal Kartal\",\"doi\":\"10.1145/1357910.1358103\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study was carried out in a plastic workshop of a refrigerator factory to solve problems of excessive work in process. In order to provide synchronous manufacturing between Capacity Constrained Resources (CCR) and non-Capacity Constraint Resources (non-CCR), an approach was developed based on the Drum-Buffer-Rope (DBR) scheduling system, which was intended for solving problems such as this. The approach was based on a heuristic that integrates Wagner-Whitin's algorithm and finite loading method to determine optimum lot sizes for non-CCR machine's material release schedule. A simulation model was used to analyze whether an improved scheduling approach was appropriate or not. An experimental study was also conducted to determine the time buffers.\",\"PeriodicalId\":91410,\"journal\":{\"name\":\"Summer Computer Simulation Conference : (SCSC 2014) : 2014 Summer Simulation Multi-Conference : Monterey, California, USA, 6-10 July 2014. Summer Computer Simulation Conference (2014 : Monterey, Calif.)\",\"volume\":\"1008 1\",\"pages\":\"1243-1249\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-07-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Summer Computer Simulation Conference : (SCSC 2014) : 2014 Summer Simulation Multi-Conference : Monterey, California, USA, 6-10 July 2014. Summer Computer Simulation Conference (2014 : Monterey, Calif.)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/1357910.1358103\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Summer Computer Simulation Conference : (SCSC 2014) : 2014 Summer Simulation Multi-Conference : Monterey, California, USA, 6-10 July 2014. Summer Computer Simulation Conference (2014 : Monterey, Calif.)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/1357910.1358103","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

本研究以某冰箱厂塑料车间为研究对象,解决在制品过多的问题。为了在产能约束资源(CCR)和非产能约束资源(非CCR)之间提供同步制造,提出了一种基于鼓-缓冲-绳索(DBR)调度系统的方法,旨在解决这类问题。该方法基于一种启发式方法,将wagner - whtin算法与有限装载法相结合,以确定非ccr机器材料释放计划的最佳批数。通过仿真模型分析改进后的调度方法是否合适。还进行了实验研究,以确定时间缓冲。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analyzing a drum-buffer-rope scheduling system executability through simulation
This study was carried out in a plastic workshop of a refrigerator factory to solve problems of excessive work in process. In order to provide synchronous manufacturing between Capacity Constrained Resources (CCR) and non-Capacity Constraint Resources (non-CCR), an approach was developed based on the Drum-Buffer-Rope (DBR) scheduling system, which was intended for solving problems such as this. The approach was based on a heuristic that integrates Wagner-Whitin's algorithm and finite loading method to determine optimum lot sizes for non-CCR machine's material release schedule. A simulation model was used to analyze whether an improved scheduling approach was appropriate or not. An experimental study was also conducted to determine the time buffers.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信