{"title":"通过仿真分析了卷筒-缓冲-绳索调度系统的可执行性","authors":"Servet Hasgül, Zuhal Kartal","doi":"10.1145/1357910.1358103","DOIUrl":null,"url":null,"abstract":"This study was carried out in a plastic workshop of a refrigerator factory to solve problems of excessive work in process. In order to provide synchronous manufacturing between Capacity Constrained Resources (CCR) and non-Capacity Constraint Resources (non-CCR), an approach was developed based on the Drum-Buffer-Rope (DBR) scheduling system, which was intended for solving problems such as this. The approach was based on a heuristic that integrates Wagner-Whitin's algorithm and finite loading method to determine optimum lot sizes for non-CCR machine's material release schedule. A simulation model was used to analyze whether an improved scheduling approach was appropriate or not. An experimental study was also conducted to determine the time buffers.","PeriodicalId":91410,"journal":{"name":"Summer Computer Simulation Conference : (SCSC 2014) : 2014 Summer Simulation Multi-Conference : Monterey, California, USA, 6-10 July 2014. Summer Computer Simulation Conference (2014 : Monterey, Calif.)","volume":"1008 1","pages":"1243-1249"},"PeriodicalIF":0.0000,"publicationDate":"2007-07-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Analyzing a drum-buffer-rope scheduling system executability through simulation\",\"authors\":\"Servet Hasgül, Zuhal Kartal\",\"doi\":\"10.1145/1357910.1358103\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study was carried out in a plastic workshop of a refrigerator factory to solve problems of excessive work in process. In order to provide synchronous manufacturing between Capacity Constrained Resources (CCR) and non-Capacity Constraint Resources (non-CCR), an approach was developed based on the Drum-Buffer-Rope (DBR) scheduling system, which was intended for solving problems such as this. The approach was based on a heuristic that integrates Wagner-Whitin's algorithm and finite loading method to determine optimum lot sizes for non-CCR machine's material release schedule. A simulation model was used to analyze whether an improved scheduling approach was appropriate or not. An experimental study was also conducted to determine the time buffers.\",\"PeriodicalId\":91410,\"journal\":{\"name\":\"Summer Computer Simulation Conference : (SCSC 2014) : 2014 Summer Simulation Multi-Conference : Monterey, California, USA, 6-10 July 2014. Summer Computer Simulation Conference (2014 : Monterey, Calif.)\",\"volume\":\"1008 1\",\"pages\":\"1243-1249\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-07-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Summer Computer Simulation Conference : (SCSC 2014) : 2014 Summer Simulation Multi-Conference : Monterey, California, USA, 6-10 July 2014. Summer Computer Simulation Conference (2014 : Monterey, Calif.)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/1357910.1358103\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Summer Computer Simulation Conference : (SCSC 2014) : 2014 Summer Simulation Multi-Conference : Monterey, California, USA, 6-10 July 2014. Summer Computer Simulation Conference (2014 : Monterey, Calif.)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/1357910.1358103","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Analyzing a drum-buffer-rope scheduling system executability through simulation
This study was carried out in a plastic workshop of a refrigerator factory to solve problems of excessive work in process. In order to provide synchronous manufacturing between Capacity Constrained Resources (CCR) and non-Capacity Constraint Resources (non-CCR), an approach was developed based on the Drum-Buffer-Rope (DBR) scheduling system, which was intended for solving problems such as this. The approach was based on a heuristic that integrates Wagner-Whitin's algorithm and finite loading method to determine optimum lot sizes for non-CCR machine's material release schedule. A simulation model was used to analyze whether an improved scheduling approach was appropriate or not. An experimental study was also conducted to determine the time buffers.