Iriandi Ilyas, B. Apriansyah, Edy Supriyadi, Abdul Multi
{"title":"ANALISA ALIRAN DAYA SISTEM 20KV PADA PROYEK TUJUH BUKIT POWER SYSTEM MENGGUNAKAN SOFTWARE ETAP 12.6","authors":"Iriandi Ilyas, B. Apriansyah, Edy Supriyadi, Abdul Multi","doi":"10.37277/stch.v32i3.1345","DOIUrl":null,"url":null,"abstract":"ABSTRACT \nPower flow analysis is important in planning in order to get a good electric power system. In planning the electrical system for the Tujuh Bukit Power System project with a 20kV system network located in Banyuwangi, East Java, a power flow simulation for a single line diagram will be carried out using the ETAP 12.6 software with the Newton Raphson method. The simulation results which consist of 22 buses show a voltage drop on the 0.4kV_ADR MCC Busbar2 bus and 0.4kV_50-MCC-01 Busbar2 bus. As a system improvement, the 0.4kV_ADR MCC Busbar2 bus will be installed with a 500 kVar capacitor bank to raise the voltage profile from 376.3 V to 385.56 V. While on the 0.4kV_50-MCC-01 Busbar2 bus, a 100 kVar capacitor bank is required to increase the voltage from 382.2 V to 384.16 V. After the repair, the power supplied to the system is 3589.6 kVA with a power factor of 90.5% lagging. As well as the reduction in the total value of system power losses from 58.1 kW + 242.2 kVar to 49.3 kW + 200.8 kVar. \n \nKeywords: Power flow, Netwon Rapshon, Simulation, Software ETAP 12.6","PeriodicalId":31905,"journal":{"name":"Sainstek Jurnal Sains dan Teknologi","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-08-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sainstek Jurnal Sains dan Teknologi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37277/stch.v32i3.1345","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
ANALISA ALIRAN DAYA SISTEM 20KV PADA PROYEK TUJUH BUKIT POWER SYSTEM MENGGUNAKAN SOFTWARE ETAP 12.6
ABSTRACT
Power flow analysis is important in planning in order to get a good electric power system. In planning the electrical system for the Tujuh Bukit Power System project with a 20kV system network located in Banyuwangi, East Java, a power flow simulation for a single line diagram will be carried out using the ETAP 12.6 software with the Newton Raphson method. The simulation results which consist of 22 buses show a voltage drop on the 0.4kV_ADR MCC Busbar2 bus and 0.4kV_50-MCC-01 Busbar2 bus. As a system improvement, the 0.4kV_ADR MCC Busbar2 bus will be installed with a 500 kVar capacitor bank to raise the voltage profile from 376.3 V to 385.56 V. While on the 0.4kV_50-MCC-01 Busbar2 bus, a 100 kVar capacitor bank is required to increase the voltage from 382.2 V to 384.16 V. After the repair, the power supplied to the system is 3589.6 kVA with a power factor of 90.5% lagging. As well as the reduction in the total value of system power losses from 58.1 kW + 242.2 kVar to 49.3 kW + 200.8 kVar.
Keywords: Power flow, Netwon Rapshon, Simulation, Software ETAP 12.6