{"title":"恢复耶莱尼亚路线铁路交通的能力Góra - Karpacz/Kowary","authors":"S. Haładyn","doi":"10.26411/83-1734-2015-1-45-7-20","DOIUrl":null,"url":null,"abstract":"This article discusses the reason for the suspension of railway traffic on the Jelenia Góra - Karpacz route. The possibility of reactivating the transport on this route was indicated. Based on the equation of the train movement, calculations of the theoretical travel were carried out, as a result of which the technical and total travel time were determined. A rational interval of train runs was determined and a timetable was proposed, taking into account relations going beyond Jelenia Góra. The article justifies the need to introduce supplementary connection operated by electric buses. The concept of reactivating traffic in this area should be supplemented with the construction of a P + R car park. The possibility of further development of the transport system in the discussed area was also proposed.","PeriodicalId":45963,"journal":{"name":"International Journal of Shipping and Transport Logistics","volume":"36 1","pages":""},"PeriodicalIF":1.4000,"publicationDate":"2020-10-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Ability to Restore Railway Traffic on the Route of Jelenia Góra - Karpacz/Kowary\",\"authors\":\"S. Haładyn\",\"doi\":\"10.26411/83-1734-2015-1-45-7-20\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article discusses the reason for the suspension of railway traffic on the Jelenia Góra - Karpacz route. The possibility of reactivating the transport on this route was indicated. Based on the equation of the train movement, calculations of the theoretical travel were carried out, as a result of which the technical and total travel time were determined. A rational interval of train runs was determined and a timetable was proposed, taking into account relations going beyond Jelenia Góra. The article justifies the need to introduce supplementary connection operated by electric buses. The concept of reactivating traffic in this area should be supplemented with the construction of a P + R car park. The possibility of further development of the transport system in the discussed area was also proposed.\",\"PeriodicalId\":45963,\"journal\":{\"name\":\"International Journal of Shipping and Transport Logistics\",\"volume\":\"36 1\",\"pages\":\"\"},\"PeriodicalIF\":1.4000,\"publicationDate\":\"2020-10-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Shipping and Transport Logistics\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.26411/83-1734-2015-1-45-7-20\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Shipping and Transport Logistics","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.26411/83-1734-2015-1-45-7-20","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
The Ability to Restore Railway Traffic on the Route of Jelenia Góra - Karpacz/Kowary
This article discusses the reason for the suspension of railway traffic on the Jelenia Góra - Karpacz route. The possibility of reactivating the transport on this route was indicated. Based on the equation of the train movement, calculations of the theoretical travel were carried out, as a result of which the technical and total travel time were determined. A rational interval of train runs was determined and a timetable was proposed, taking into account relations going beyond Jelenia Góra. The article justifies the need to introduce supplementary connection operated by electric buses. The concept of reactivating traffic in this area should be supplemented with the construction of a P + R car park. The possibility of further development of the transport system in the discussed area was also proposed.