带附加返工问题的无节奏装配线平衡问题的仿真优化方法

M. Noushabadi, U. Bahalke, K. Dolatkhahi, A. Yolmeh
{"title":"带附加返工问题的无节奏装配线平衡问题的仿真优化方法","authors":"M. Noushabadi, U. Bahalke, K. Dolatkhahi, A. Yolmeh","doi":"10.1109/ICMSAO.2011.5775596","DOIUrl":null,"url":null,"abstract":"This paper investigates the problem of assembly line balancing problem, in which the products in the production line may undergo to be reworked on the current task. Since the real manufacturing systems deal with the stochastic nature of the items in production lines, this paper considers the simple assembly line balancing problem type 2 (SALBP-II) under the conditions of stochastic processing time of tasks and the element of reworking system. Exposing to the stochastic conditions encouraged us to handle the problem via simulation optimization procedure, which uses the well known genetic algorithm as an optimization tool. Results show the adaptation and effectiveness of GA to considered problem.","PeriodicalId":6383,"journal":{"name":"2011 Fourth International Conference on Modeling, Simulation and Applied Optimization","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2011-04-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"A simulation optimization approach to un-paced assembly line balancing problem-II with additional reworking issue\",\"authors\":\"M. Noushabadi, U. Bahalke, K. Dolatkhahi, A. Yolmeh\",\"doi\":\"10.1109/ICMSAO.2011.5775596\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper investigates the problem of assembly line balancing problem, in which the products in the production line may undergo to be reworked on the current task. Since the real manufacturing systems deal with the stochastic nature of the items in production lines, this paper considers the simple assembly line balancing problem type 2 (SALBP-II) under the conditions of stochastic processing time of tasks and the element of reworking system. Exposing to the stochastic conditions encouraged us to handle the problem via simulation optimization procedure, which uses the well known genetic algorithm as an optimization tool. Results show the adaptation and effectiveness of GA to considered problem.\",\"PeriodicalId\":6383,\"journal\":{\"name\":\"2011 Fourth International Conference on Modeling, Simulation and Applied Optimization\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-04-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 Fourth International Conference on Modeling, Simulation and Applied Optimization\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICMSAO.2011.5775596\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 Fourth International Conference on Modeling, Simulation and Applied Optimization","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICMSAO.2011.5775596","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本文研究了装配线平衡问题,其中生产线上的产品可能会在当前任务上进行返工。由于实际制造系统处理生产线上产品的随机特性,本文考虑了任务加工时间随机和返工系统要素随机条件下的简单装配线平衡问题2 (SALBP-II)。暴露在随机条件下鼓励我们通过模拟优化程序来处理问题,该程序使用众所周知的遗传算法作为优化工具。结果表明了遗传算法对所考虑问题的适应性和有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A simulation optimization approach to un-paced assembly line balancing problem-II with additional reworking issue
This paper investigates the problem of assembly line balancing problem, in which the products in the production line may undergo to be reworked on the current task. Since the real manufacturing systems deal with the stochastic nature of the items in production lines, this paper considers the simple assembly line balancing problem type 2 (SALBP-II) under the conditions of stochastic processing time of tasks and the element of reworking system. Exposing to the stochastic conditions encouraged us to handle the problem via simulation optimization procedure, which uses the well known genetic algorithm as an optimization tool. Results show the adaptation and effectiveness of GA to considered problem.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信