{"title":"基于物联网的PT. PLN (Persero)供电商在变电站能源中的太阳能利用","authors":"Syanno Revy, A. Taqwa, F. Arifin","doi":"10.53893/ijrvocas.v2i2.108","DOIUrl":null,"url":null,"abstract":"In organizing the Asian game event in Palembang in 2018, PT PLN Persero supported this activity by supplying electricity at several points in the Jakabaring Spot City (JSC) area with a total of 27 connecting substations with a loop system, but when the event was over the loop system was turned off and several locations of connecting substations. not deactivated due to operational constraints and the absence of activities at the location resulting in the supply to the substation shutting down but still operating distributing a voltage of 20 to several substations that are still operating in the JSC area, Indonesia has a very large renewable energy potential, especially solar energy which can supply a heater to maintain humidity prevent partial discharge and make cubicle equipment have a long lifetime. The results show that the radiation received by the PV system is sufficient to produce Stable electric power to turn on the heater continuously for 24 hours Future research will be extended to monitoring via IoT.","PeriodicalId":14205,"journal":{"name":"International Journal of Research in Vocational Studies (IJRVOCAS)","volume":"3 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Utilization of Solar Energy in the Substation Energy in Provider Connected to PT. PLN (Persero) Based on IoT\",\"authors\":\"Syanno Revy, A. Taqwa, F. Arifin\",\"doi\":\"10.53893/ijrvocas.v2i2.108\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In organizing the Asian game event in Palembang in 2018, PT PLN Persero supported this activity by supplying electricity at several points in the Jakabaring Spot City (JSC) area with a total of 27 connecting substations with a loop system, but when the event was over the loop system was turned off and several locations of connecting substations. not deactivated due to operational constraints and the absence of activities at the location resulting in the supply to the substation shutting down but still operating distributing a voltage of 20 to several substations that are still operating in the JSC area, Indonesia has a very large renewable energy potential, especially solar energy which can supply a heater to maintain humidity prevent partial discharge and make cubicle equipment have a long lifetime. The results show that the radiation received by the PV system is sufficient to produce Stable electric power to turn on the heater continuously for 24 hours Future research will be extended to monitoring via IoT.\",\"PeriodicalId\":14205,\"journal\":{\"name\":\"International Journal of Research in Vocational Studies (IJRVOCAS)\",\"volume\":\"3 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Research in Vocational Studies (IJRVOCAS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.53893/ijrvocas.v2i2.108\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Research in Vocational Studies (IJRVOCAS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53893/ijrvocas.v2i2.108","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
摘要
在2018年在巨港组织亚洲游戏活动时,PT PLN Persero通过在Jakabaring Spot City (JSC)地区的几个点供电来支持这一活动,共有27个连接环路系统的变电站,但是当活动结束时,环路系统被关闭,连接变电站的几个位置也被关闭。由于运营限制和该地点缺乏活动导致变电站供电关闭,但仍在运行,向仍在JSC地区运行的几个变电站分配20的电压,印度尼西亚具有非常大的可再生能源潜力,特别是太阳能,它可以提供加热器以保持湿度,防止局部放电,并使隔间设备具有较长的使用寿命。结果表明,光伏系统接收到的辐射足以产生稳定的电力,连续24小时开启加热器,未来的研究将扩展到通过物联网进行监控。
Utilization of Solar Energy in the Substation Energy in Provider Connected to PT. PLN (Persero) Based on IoT
In organizing the Asian game event in Palembang in 2018, PT PLN Persero supported this activity by supplying electricity at several points in the Jakabaring Spot City (JSC) area with a total of 27 connecting substations with a loop system, but when the event was over the loop system was turned off and several locations of connecting substations. not deactivated due to operational constraints and the absence of activities at the location resulting in the supply to the substation shutting down but still operating distributing a voltage of 20 to several substations that are still operating in the JSC area, Indonesia has a very large renewable energy potential, especially solar energy which can supply a heater to maintain humidity prevent partial discharge and make cubicle equipment have a long lifetime. The results show that the radiation received by the PV system is sufficient to produce Stable electric power to turn on the heater continuously for 24 hours Future research will be extended to monitoring via IoT.