海外公路工程风险分析及防范措施——以玻利维亚项目为例

Ying Pan, Jun Dong, Likuan Tian
{"title":"海外公路工程风险分析及防范措施——以玻利维亚项目为例","authors":"Ying Pan, Jun Dong, Likuan Tian","doi":"10.26855/ea.2023.06.024","DOIUrl":null,"url":null,"abstract":"Under the Belt and Road Initiative, the pace of Chinese enterprises to explore overseas markets obviously quickens, and the international project contracting business has been maintaining rapid growth. At the same time, series of issues have brought the unprecedented impacts on human society, such as the scientific and technological revolution, the industrial revolution, climate change, etc. With more and more risk factors in the international project contracting market, the uncertainties faced by Chinese enterprises \"going global\" to carry out international business are increasing. Based on the \"the Two-San Project\" and \"the Yukumo Project\" being implemented by China Construction Group in Bolivia, the paper focuses on the internal and external risks, involved in the development of highway engineering projects. The various risk factors will be explained in detail so as to provide reference for the smooth implementation of the road projects under construction and the road projects to enter Bolivia in the future.","PeriodicalId":72384,"journal":{"name":"Biomedical engineering advances","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis on Risks and Preventive Measures of Overseas Highway Engineering: Taking Bolivia Project as an Example\",\"authors\":\"Ying Pan, Jun Dong, Likuan Tian\",\"doi\":\"10.26855/ea.2023.06.024\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Under the Belt and Road Initiative, the pace of Chinese enterprises to explore overseas markets obviously quickens, and the international project contracting business has been maintaining rapid growth. At the same time, series of issues have brought the unprecedented impacts on human society, such as the scientific and technological revolution, the industrial revolution, climate change, etc. With more and more risk factors in the international project contracting market, the uncertainties faced by Chinese enterprises \\\"going global\\\" to carry out international business are increasing. Based on the \\\"the Two-San Project\\\" and \\\"the Yukumo Project\\\" being implemented by China Construction Group in Bolivia, the paper focuses on the internal and external risks, involved in the development of highway engineering projects. The various risk factors will be explained in detail so as to provide reference for the smooth implementation of the road projects under construction and the road projects to enter Bolivia in the future.\",\"PeriodicalId\":72384,\"journal\":{\"name\":\"Biomedical engineering advances\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Biomedical engineering advances\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.26855/ea.2023.06.024\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Biomedical engineering advances","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26855/ea.2023.06.024","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在“一带一路”倡议下,中国企业开拓海外市场的步伐明显加快,国际工程承包业务一直保持快速增长。与此同时,科技革命、工业革命、气候变化等一系列问题给人类社会带来了前所未有的冲击。随着国际工程承包市场的风险因素越来越多,中国企业“走出去”开展国际业务面临的不确定性也越来越大。本文以中国建筑集团在玻利维亚实施的“两三工程”和“玉库莫工程”为背景,重点分析了公路工程项目开发中涉及的内外部风险。对各种风险因素进行详细说明,为今后在建道路项目的顺利实施和进入玻利维亚的道路项目提供参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis on Risks and Preventive Measures of Overseas Highway Engineering: Taking Bolivia Project as an Example
Under the Belt and Road Initiative, the pace of Chinese enterprises to explore overseas markets obviously quickens, and the international project contracting business has been maintaining rapid growth. At the same time, series of issues have brought the unprecedented impacts on human society, such as the scientific and technological revolution, the industrial revolution, climate change, etc. With more and more risk factors in the international project contracting market, the uncertainties faced by Chinese enterprises "going global" to carry out international business are increasing. Based on the "the Two-San Project" and "the Yukumo Project" being implemented by China Construction Group in Bolivia, the paper focuses on the internal and external risks, involved in the development of highway engineering projects. The various risk factors will be explained in detail so as to provide reference for the smooth implementation of the road projects under construction and the road projects to enter Bolivia in the future.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Biomedical engineering advances
Biomedical engineering advances Bioengineering, Biomedical Engineering
自引率
0.00%
发文量
0
审稿时长
59 days
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信