摩托车锂蓄电池生产装置资金预算投资目标规划模型

Cecilia Intan Wijayanti, W. Sutopo, R. Zakaria
{"title":"摩托车锂蓄电池生产装置资金预算投资目标规划模型","authors":"Cecilia Intan Wijayanti, W. Sutopo, R. Zakaria","doi":"10.1109/ICEVT.2018.8628397","DOIUrl":null,"url":null,"abstract":"Issue of lithium battery technology has widely discussed in recent years. Currently, the use of lithium batteries has been so close to the life of the community such as the use of public road lighting, solar power plants, handy talky, and accumulator for the motorcycle. To commercials, those accumulators need some preparations such as feasibility study, market research, and capital budgeting. Feasibility study and market research has been done in the previous, so this paper is doing the third step that is capital budgeting. Capital budgeting uses to allocate capital for some complicated project by the existence of multiple and conflicting goals. Those projects related to the company's goals to minimize costs that are contrary to the objectives of quality improvement, meeting the needs of space, production capacity, warehouse capacity, etc. This research uses a goal programming approach for capital budgeting commercialization and production of lithium accumulator and demonstrates via an in-depth case example of a production problem.","PeriodicalId":6659,"journal":{"name":"2018 5th International Conference on Electric Vehicular Technology (ICEVT)","volume":"26 1","pages":"107-111"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Goal Programming Model for Capital Budgeting Investment of Lithium Accumulator Production Unit for Motorcycle\",\"authors\":\"Cecilia Intan Wijayanti, W. Sutopo, R. Zakaria\",\"doi\":\"10.1109/ICEVT.2018.8628397\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Issue of lithium battery technology has widely discussed in recent years. Currently, the use of lithium batteries has been so close to the life of the community such as the use of public road lighting, solar power plants, handy talky, and accumulator for the motorcycle. To commercials, those accumulators need some preparations such as feasibility study, market research, and capital budgeting. Feasibility study and market research has been done in the previous, so this paper is doing the third step that is capital budgeting. Capital budgeting uses to allocate capital for some complicated project by the existence of multiple and conflicting goals. Those projects related to the company's goals to minimize costs that are contrary to the objectives of quality improvement, meeting the needs of space, production capacity, warehouse capacity, etc. This research uses a goal programming approach for capital budgeting commercialization and production of lithium accumulator and demonstrates via an in-depth case example of a production problem.\",\"PeriodicalId\":6659,\"journal\":{\"name\":\"2018 5th International Conference on Electric Vehicular Technology (ICEVT)\",\"volume\":\"26 1\",\"pages\":\"107-111\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 5th International Conference on Electric Vehicular Technology (ICEVT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICEVT.2018.8628397\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 5th International Conference on Electric Vehicular Technology (ICEVT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICEVT.2018.8628397","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

近年来,锂电池技术问题引起了广泛的讨论。目前,锂电池的使用已经如此接近社会的生活,如公共道路照明、太阳能发电厂、便携式通话器、摩托车蓄电池的使用。对商业来说,这些蓄能器需要可行性研究、市场调查、资金预算等准备工作。在前期已经进行了可行性研究和市场调研,因此本文正在进行第三步,即资金预算。资本预算是指通过存在多个相互冲突的目标来为一些复杂的项目分配资金。与公司成本最小化目标相关的项目,与质量改进目标相反的项目,满足空间、生产能力、仓储能力等需求的项目。本研究采用目标规划方法对锂蓄电池的资本预算、商业化和生产进行了分析,并通过一个生产问题的深入案例进行了论证。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Goal Programming Model for Capital Budgeting Investment of Lithium Accumulator Production Unit for Motorcycle
Issue of lithium battery technology has widely discussed in recent years. Currently, the use of lithium batteries has been so close to the life of the community such as the use of public road lighting, solar power plants, handy talky, and accumulator for the motorcycle. To commercials, those accumulators need some preparations such as feasibility study, market research, and capital budgeting. Feasibility study and market research has been done in the previous, so this paper is doing the third step that is capital budgeting. Capital budgeting uses to allocate capital for some complicated project by the existence of multiple and conflicting goals. Those projects related to the company's goals to minimize costs that are contrary to the objectives of quality improvement, meeting the needs of space, production capacity, warehouse capacity, etc. This research uses a goal programming approach for capital budgeting commercialization and production of lithium accumulator and demonstrates via an in-depth case example of a production problem.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信