管理信息系统开发项目中的过程交互

R. Khajavinia
{"title":"管理信息系统开发项目中的过程交互","authors":"R. Khajavinia","doi":"10.1109/ITNG.2008.70","DOIUrl":null,"url":null,"abstract":"Increasingly, information systems must be developed and implemented as a part of business change. This is a challenge for the IS project manager, since business change and information systems development usually are performed as separate processes. Thus, there is a need to understand and manage the relationship between these two kinds of processes. To understand the interaction between information systems development and planned organizational change we introduce the concept of process interaction. We draw on a longitudinal case study of an IS development project that used an iterative and incremental development approach. The concept of process interaction enabled us to understand critical events in the case, in particular those that were important for the mutual adaptation between the information system and the organization. We conclude that process interaction is needed to facilitate socio-technical innovation in a situation where the organizational change process and the IS development process are parallel but incongruent. We also argue that iterative software engineering frameworks are well structured to support process interaction. Finally, we advocate that the IS project manager needs to manage the trade-off between necessary process interaction and the internal IS project schedule.","PeriodicalId":89615,"journal":{"name":"Proceedings of the ... International Conference on Information Technology: New Generations. International Conference on Information Technology: New Generations","volume":"6 1","pages":"465-470"},"PeriodicalIF":0.0000,"publicationDate":"2008-04-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Managing Process Interaction in IS Development Projects\",\"authors\":\"R. Khajavinia\",\"doi\":\"10.1109/ITNG.2008.70\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Increasingly, information systems must be developed and implemented as a part of business change. This is a challenge for the IS project manager, since business change and information systems development usually are performed as separate processes. Thus, there is a need to understand and manage the relationship between these two kinds of processes. To understand the interaction between information systems development and planned organizational change we introduce the concept of process interaction. We draw on a longitudinal case study of an IS development project that used an iterative and incremental development approach. The concept of process interaction enabled us to understand critical events in the case, in particular those that were important for the mutual adaptation between the information system and the organization. We conclude that process interaction is needed to facilitate socio-technical innovation in a situation where the organizational change process and the IS development process are parallel but incongruent. We also argue that iterative software engineering frameworks are well structured to support process interaction. Finally, we advocate that the IS project manager needs to manage the trade-off between necessary process interaction and the internal IS project schedule.\",\"PeriodicalId\":89615,\"journal\":{\"name\":\"Proceedings of the ... International Conference on Information Technology: New Generations. International Conference on Information Technology: New Generations\",\"volume\":\"6 1\",\"pages\":\"465-470\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-04-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the ... International Conference on Information Technology: New Generations. International Conference on Information Technology: New Generations\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ITNG.2008.70\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the ... International Conference on Information Technology: New Generations. International Conference on Information Technology: New Generations","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ITNG.2008.70","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

越来越多的信息系统必须作为业务变化的一部分来开发和实现。这对is项目经理来说是一个挑战,因为业务变更和信息系统开发通常是作为独立的过程执行的。因此,有必要理解和管理这两种过程之间的关系。为了理解信息系统开发和计划的组织变更之间的交互作用,我们引入了过程交互的概念。我们利用一个使用迭代和增量开发方法的IS开发项目的纵向案例研究。过程交互的概念使我们能够理解案例中的关键事件,特别是那些对于信息系统和组织之间的相互适应非常重要的事件。我们的结论是,在组织变革过程和信息系统开发过程平行但不一致的情况下,需要过程交互来促进社会技术创新。我们还认为迭代软件工程框架的结构很好,可以支持过程交互。最后,我们主张信息系统项目经理需要管理必要的过程交互和内部信息系统项目进度之间的权衡。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Managing Process Interaction in IS Development Projects
Increasingly, information systems must be developed and implemented as a part of business change. This is a challenge for the IS project manager, since business change and information systems development usually are performed as separate processes. Thus, there is a need to understand and manage the relationship between these two kinds of processes. To understand the interaction between information systems development and planned organizational change we introduce the concept of process interaction. We draw on a longitudinal case study of an IS development project that used an iterative and incremental development approach. The concept of process interaction enabled us to understand critical events in the case, in particular those that were important for the mutual adaptation between the information system and the organization. We conclude that process interaction is needed to facilitate socio-technical innovation in a situation where the organizational change process and the IS development process are parallel but incongruent. We also argue that iterative software engineering frameworks are well structured to support process interaction. Finally, we advocate that the IS project manager needs to manage the trade-off between necessary process interaction and the internal IS project schedule.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信