{"title":"巴厘岛别墅建设项目人力资源管理战略","authors":"I. P. K. Yudha, Ni Made Ari Widiastini, Putu indah Rahmawati","doi":"10.37606/publik.v10i2.701","DOIUrl":null,"url":null,"abstract":"This study aims to analyze human resource management strategies in the province of Bali. The research locations were conducted in 2 project locations, namely the Ubud Lodtunduh Villa Development Project in Gianyar Regency, and the BaliHandara Villa Project in Buleleng Regency. The sample of this research is 15 project workers. The research method is carried out with a qualitative approach. Data collection in this study was carried out by means of observation, in-depth interviews, and documentation. The results of the study show (1) HR management of construction projects is carried out by controlling and supervising work implementation and carrying out structured project organizational planning (2) Factors that can accelerate project completion, namely by increasing the number of workers and applying overtime hours","PeriodicalId":34643,"journal":{"name":"JENIUS Jurnal Ilmiah Manajemen Sumber Daya Manusia","volume":"125 28","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"STRATEGI PENGELOLAAN SUMBER DAYA MANUSIA PADA PROYEK KONSTRUKSI VILLA DI PROVINSI BALI\",\"authors\":\"I. P. K. Yudha, Ni Made Ari Widiastini, Putu indah Rahmawati\",\"doi\":\"10.37606/publik.v10i2.701\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study aims to analyze human resource management strategies in the province of Bali. The research locations were conducted in 2 project locations, namely the Ubud Lodtunduh Villa Development Project in Gianyar Regency, and the BaliHandara Villa Project in Buleleng Regency. The sample of this research is 15 project workers. The research method is carried out with a qualitative approach. Data collection in this study was carried out by means of observation, in-depth interviews, and documentation. The results of the study show (1) HR management of construction projects is carried out by controlling and supervising work implementation and carrying out structured project organizational planning (2) Factors that can accelerate project completion, namely by increasing the number of workers and applying overtime hours\",\"PeriodicalId\":34643,\"journal\":{\"name\":\"JENIUS Jurnal Ilmiah Manajemen Sumber Daya Manusia\",\"volume\":\"125 28\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-05-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"JENIUS Jurnal Ilmiah Manajemen Sumber Daya Manusia\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37606/publik.v10i2.701\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"JENIUS Jurnal Ilmiah Manajemen Sumber Daya Manusia","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37606/publik.v10i2.701","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
STRATEGI PENGELOLAAN SUMBER DAYA MANUSIA PADA PROYEK KONSTRUKSI VILLA DI PROVINSI BALI
This study aims to analyze human resource management strategies in the province of Bali. The research locations were conducted in 2 project locations, namely the Ubud Lodtunduh Villa Development Project in Gianyar Regency, and the BaliHandara Villa Project in Buleleng Regency. The sample of this research is 15 project workers. The research method is carried out with a qualitative approach. Data collection in this study was carried out by means of observation, in-depth interviews, and documentation. The results of the study show (1) HR management of construction projects is carried out by controlling and supervising work implementation and carrying out structured project organizational planning (2) Factors that can accelerate project completion, namely by increasing the number of workers and applying overtime hours