堆浸选矿的若干问题

IF 0.1 Q4 GEOSCIENCES, MULTIDISCIPLINARY
V. Golik
{"title":"堆浸选矿的若干问题","authors":"V. Golik","doi":"10.46689/2218-5194-2021-4-1-322-330","DOIUrl":null,"url":null,"abstract":"The issues of reagent leaching of metals in stacks in a historical cut are considered. It is shown that more than 1/3 of the chipped ore in size does not meet the conditions for extract-ing metals from it and requires regrinding. The features of mills are considered and the ad-vantages of grinding in a high-speed mill - disintegrator are determined. The information on innovations in the optimization of grinding equipment, which can reduce the cost of production by 10…15 %, is given.","PeriodicalId":41869,"journal":{"name":"Proceedings of the Tula States University-Sciences of Earth","volume":"1 1","pages":""},"PeriodicalIF":0.1000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"PROBLEMS OF ORE PREPARATION FOR HEAP LEACHING\",\"authors\":\"V. Golik\",\"doi\":\"10.46689/2218-5194-2021-4-1-322-330\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The issues of reagent leaching of metals in stacks in a historical cut are considered. It is shown that more than 1/3 of the chipped ore in size does not meet the conditions for extract-ing metals from it and requires regrinding. The features of mills are considered and the ad-vantages of grinding in a high-speed mill - disintegrator are determined. The information on innovations in the optimization of grinding equipment, which can reduce the cost of production by 10…15 %, is given.\",\"PeriodicalId\":41869,\"journal\":{\"name\":\"Proceedings of the Tula States University-Sciences of Earth\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.1000,\"publicationDate\":\"2021-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Tula States University-Sciences of Earth\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.46689/2218-5194-2021-4-1-322-330\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"GEOSCIENCES, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Tula States University-Sciences of Earth","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46689/2218-5194-2021-4-1-322-330","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"GEOSCIENCES, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 1

摘要

在历史切割中考虑了堆中金属的试剂浸出问题。结果表明,有1/3以上的破碎矿石粒度不符合提取金属的条件,需要再磨。考虑了磨机的特点,确定了高速磨-粉碎机磨矿的优势。给出了在磨削设备优化方面的创新信息,这些创新可使生产成本降低10 ~ 15%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
PROBLEMS OF ORE PREPARATION FOR HEAP LEACHING
The issues of reagent leaching of metals in stacks in a historical cut are considered. It is shown that more than 1/3 of the chipped ore in size does not meet the conditions for extract-ing metals from it and requires regrinding. The features of mills are considered and the ad-vantages of grinding in a high-speed mill - disintegrator are determined. The information on innovations in the optimization of grinding equipment, which can reduce the cost of production by 10…15 %, is given.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信