S. Kannan, P. Murugan
{"title":"基于差分进化的输电约束下发电扩展规划求解","authors":"S. Kannan, P. Murugan","doi":"10.1002/ETEP.275","DOIUrl":null,"url":null,"abstract":"This paper describes the application of differential evolution (DE) technique for solving the transmission constrained generation expansion planning (TC-GEP) problem. The TC-GEP is a large scale and challenging problem for the decision makers (to decide upon site, capacity, type of fuel, etc.) as there exist a large number of combinations. The test system used is a modified IEEE-30 bus test system with a planning horizon of 6 years. The results are compared and validated with dynamic programming (DP). Copyright © 2008 John Wiley & Sons, Ltd.","PeriodicalId":50474,"journal":{"name":"European Transactions on Electrical Power","volume":"19 1","pages":"1033-1039"},"PeriodicalIF":0.0000,"publicationDate":"2009-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1002/ETEP.275","citationCount":"11","resultStr":"{\"title\":\"Solutions to transmission constrained generation expansion planning using differential evolution\",\"authors\":\"S. Kannan, P. Murugan\",\"doi\":\"10.1002/ETEP.275\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes the application of differential evolution (DE) technique for solving the transmission constrained generation expansion planning (TC-GEP) problem. The TC-GEP is a large scale and challenging problem for the decision makers (to decide upon site, capacity, type of fuel, etc.) as there exist a large number of combinations. The test system used is a modified IEEE-30 bus test system with a planning horizon of 6 years. The results are compared and validated with dynamic programming (DP). Copyright © 2008 John Wiley & Sons, Ltd.\",\"PeriodicalId\":50474,\"journal\":{\"name\":\"European Transactions on Electrical Power\",\"volume\":\"19 1\",\"pages\":\"1033-1039\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1002/ETEP.275\",\"citationCount\":\"11\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"European Transactions on Electrical Power\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1002/ETEP.275\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Transactions on Electrical Power","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/ETEP.275","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 11