公路路面养护与修复项目选择与调度的多目标优化研究进展

Mohammadhosein Pourgholamali, Samuel Labi, Kumares C. Sinha
{"title":"公路路面养护与修复项目选择与调度的多目标优化研究进展","authors":"Mohammadhosein Pourgholamali,&nbsp;Samuel Labi,&nbsp;Kumares C. Sinha","doi":"10.1016/j.jreng.2023.05.003","DOIUrl":null,"url":null,"abstract":"<div><p>The motivation for cost-effective management of highway pavements is evidenced not only by the massive expenditures associated with these activities at a national level but also by the consequences of poor pavement condition on road users. This paper presents a state-of-the-art review of multi-objective optimization (MOO) problems that have been formulated and solution techniques that have been used in selecting and scheduling highway pavement rehabilitation and maintenance activities. First, the paper presents a taxonomy and hierarchy for these activities, the role of funding sources, and levels of jurisdiction. The paper then describes how three different decision mechanisms have been used in past research and practice for project selection and scheduling (historical practices, expert opinion, and explicit mathematical optimization) and identifies the pros and cons of each mechanism. The paper then focuses on the optimization mechanism and presents the types of optimization problems, formulations, and objectives that have been used in the literature. Next, the paper examines various solution algorithms and discusses issues related to their implementation. Finally, the paper identifies some barriers to implementing multi-objective optimization in selecting and scheduling highway pavement rehabilitation and maintenance activities, and makes recommendations to overcome some of these barriers.</p></div>","PeriodicalId":100830,"journal":{"name":"Journal of Road Engineering","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Multi-objective optimization in highway pavement maintenance and rehabilitation project selection and scheduling: A state-of-the-art review\",\"authors\":\"Mohammadhosein Pourgholamali,&nbsp;Samuel Labi,&nbsp;Kumares C. Sinha\",\"doi\":\"10.1016/j.jreng.2023.05.003\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>The motivation for cost-effective management of highway pavements is evidenced not only by the massive expenditures associated with these activities at a national level but also by the consequences of poor pavement condition on road users. This paper presents a state-of-the-art review of multi-objective optimization (MOO) problems that have been formulated and solution techniques that have been used in selecting and scheduling highway pavement rehabilitation and maintenance activities. First, the paper presents a taxonomy and hierarchy for these activities, the role of funding sources, and levels of jurisdiction. The paper then describes how three different decision mechanisms have been used in past research and practice for project selection and scheduling (historical practices, expert opinion, and explicit mathematical optimization) and identifies the pros and cons of each mechanism. The paper then focuses on the optimization mechanism and presents the types of optimization problems, formulations, and objectives that have been used in the literature. Next, the paper examines various solution algorithms and discusses issues related to their implementation. Finally, the paper identifies some barriers to implementing multi-objective optimization in selecting and scheduling highway pavement rehabilitation and maintenance activities, and makes recommendations to overcome some of these barriers.</p></div>\",\"PeriodicalId\":100830,\"journal\":{\"name\":\"Journal of Road Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Road Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S2097049823000410\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Road Engineering","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2097049823000410","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

公路路面成本效益管理的动机不仅体现在国家层面与这些活动相关的巨额支出上,还体现在路面状况不佳对道路使用者的影响上。本文对已制定的多目标优化(MOO)问题以及用于选择和安排公路路面修复和维护活动的解决技术进行了最新综述。首先,本文介绍了这些活动的分类和层次、资金来源的作用和管辖级别。然后,本文描述了在过去的项目选择和调度研究和实践中,如何使用三种不同的决策机制(历史实践、专家意见和明确的数学优化),并确定了每种机制的优缺点。然后,本文重点讨论了优化机制,并介绍了文献中使用的优化问题的类型、公式和目标。接下来,本文研究了各种求解算法,并讨论了与它们的实现相关的问题。最后,本文确定了在选择和安排公路路面修复和养护活动时实施多目标优化的一些障碍,并提出了克服这些障碍的建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Multi-objective optimization in highway pavement maintenance and rehabilitation project selection and scheduling: A state-of-the-art review

The motivation for cost-effective management of highway pavements is evidenced not only by the massive expenditures associated with these activities at a national level but also by the consequences of poor pavement condition on road users. This paper presents a state-of-the-art review of multi-objective optimization (MOO) problems that have been formulated and solution techniques that have been used in selecting and scheduling highway pavement rehabilitation and maintenance activities. First, the paper presents a taxonomy and hierarchy for these activities, the role of funding sources, and levels of jurisdiction. The paper then describes how three different decision mechanisms have been used in past research and practice for project selection and scheduling (historical practices, expert opinion, and explicit mathematical optimization) and identifies the pros and cons of each mechanism. The paper then focuses on the optimization mechanism and presents the types of optimization problems, formulations, and objectives that have been used in the literature. Next, the paper examines various solution algorithms and discusses issues related to their implementation. Finally, the paper identifies some barriers to implementing multi-objective optimization in selecting and scheduling highway pavement rehabilitation and maintenance activities, and makes recommendations to overcome some of these barriers.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
5.10
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信