面向实时任务的挖掘机臂连续挖掘轨迹规划

IF 9.6 1区 工程技术 Q1 CONSTRUCTION & BUILDING TECHNOLOGY
Zongwei Yao, Shichao Zhao, Xiaodan Tan, Wen Wei, Yong Wang
{"title":"面向实时任务的挖掘机臂连续挖掘轨迹规划","authors":"Zongwei Yao,&nbsp;Shichao Zhao,&nbsp;Xiaodan Tan,&nbsp;Wen Wei,&nbsp;Yong Wang","doi":"10.1016/j.autcon.2023.104916","DOIUrl":null,"url":null,"abstract":"<div><p>Current digging trajectory planning<span> methods for excavator arms are limited to a single digging cycle, which does not meet the continuous excavation demands of the task. To address this issue, a real-time task-oriented continuous digging trajectory planning method for autonomous excavators is presented. The method involves optimizing digging trajectory for a single excavation cycle using multi-objective PSO method, building a PINN model using optimization results as training samples for real-time planning, and embedding the PINN model in planning framework for typical tasks. The method was validated using four different cross-section shapes of the trench. Results show that the average time taken to plan a single digging trajectory is less than 4.5ms, which is negligible compared to the time taken by PSO. The overall performance of the trajectory is only about 5% different from those planned by PSO. This method offers a more efficient and effective solution for continuous excavation tasks.</span></p></div>","PeriodicalId":8660,"journal":{"name":"Automation in Construction","volume":"152 ","pages":"Article 104916"},"PeriodicalIF":9.6000,"publicationDate":"2023-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Real-time task-oriented continuous digging trajectory planning for excavator arms\",\"authors\":\"Zongwei Yao,&nbsp;Shichao Zhao,&nbsp;Xiaodan Tan,&nbsp;Wen Wei,&nbsp;Yong Wang\",\"doi\":\"10.1016/j.autcon.2023.104916\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>Current digging trajectory planning<span> methods for excavator arms are limited to a single digging cycle, which does not meet the continuous excavation demands of the task. To address this issue, a real-time task-oriented continuous digging trajectory planning method for autonomous excavators is presented. The method involves optimizing digging trajectory for a single excavation cycle using multi-objective PSO method, building a PINN model using optimization results as training samples for real-time planning, and embedding the PINN model in planning framework for typical tasks. The method was validated using four different cross-section shapes of the trench. Results show that the average time taken to plan a single digging trajectory is less than 4.5ms, which is negligible compared to the time taken by PSO. The overall performance of the trajectory is only about 5% different from those planned by PSO. This method offers a more efficient and effective solution for continuous excavation tasks.</span></p></div>\",\"PeriodicalId\":8660,\"journal\":{\"name\":\"Automation in Construction\",\"volume\":\"152 \",\"pages\":\"Article 104916\"},\"PeriodicalIF\":9.6000,\"publicationDate\":\"2023-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Automation in Construction\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0926580523001760\",\"RegionNum\":1,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Automation in Construction","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0926580523001760","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 2

摘要

目前挖掘机臂的挖掘轨迹规划方法仅限于单个挖掘周期,无法满足任务的连续挖掘需求。针对这一问题,提出了一种面向实时任务的自主挖掘机连续挖掘轨迹规划方法。该方法包括使用多目标PSO方法优化单个挖掘周期的挖掘轨迹,使用优化结果作为实时规划的训练样本建立PINN模型,并将PINN模型嵌入典型任务的规划框架中。使用四种不同横截面形状的沟槽对该方法进行了验证。结果表明,规划单个挖掘轨迹所需的平均时间小于4.5ms,与PSO所需的时间相比,这是可以忽略的。轨迹的总体性能与PSO规划的轨迹性能仅相差约5%。这种方法为连续挖掘任务提供了一种更高效、更有效的解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。

Real-time task-oriented continuous digging trajectory planning for excavator arms

Real-time task-oriented continuous digging trajectory planning for excavator arms

Current digging trajectory planning methods for excavator arms are limited to a single digging cycle, which does not meet the continuous excavation demands of the task. To address this issue, a real-time task-oriented continuous digging trajectory planning method for autonomous excavators is presented. The method involves optimizing digging trajectory for a single excavation cycle using multi-objective PSO method, building a PINN model using optimization results as training samples for real-time planning, and embedding the PINN model in planning framework for typical tasks. The method was validated using four different cross-section shapes of the trench. Results show that the average time taken to plan a single digging trajectory is less than 4.5ms, which is negligible compared to the time taken by PSO. The overall performance of the trajectory is only about 5% different from those planned by PSO. This method offers a more efficient and effective solution for continuous excavation tasks.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Automation in Construction
Automation in Construction 工程技术-工程:土木
CiteScore
19.20
自引率
16.50%
发文量
563
审稿时长
8.5 months
期刊介绍: Automation in Construction is an international journal that focuses on publishing original research papers related to the use of Information Technologies in various aspects of the construction industry. The journal covers topics such as design, engineering, construction technologies, and the maintenance and management of constructed facilities. The scope of Automation in Construction is extensive and covers all stages of the construction life cycle. This includes initial planning and design, construction of the facility, operation and maintenance, as well as the eventual dismantling and recycling of buildings and engineering structures.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信