考虑再生制动利用的综合能源枢纽的优化协调运行

IF 1.9 4区 工程技术 Q3 ENGINEERING, ELECTRICAL & ELECTRONIC
Saeed Akbari, Seyed Saeed Fazel, Shahram Jadid
{"title":"考虑再生制动利用的综合能源枢纽的优化协调运行","authors":"Saeed Akbari,&nbsp;Seyed Saeed Fazel,&nbsp;Shahram Jadid","doi":"10.1049/els2.12032","DOIUrl":null,"url":null,"abstract":"<p>This article presents a coordinated operation model for energy management of a multi-integrated energy system based on Mixed-Integer Linear Programing (MILP). The power derived by trains from regenerative braking energy (RBE), during deceleration, is utilised to meet the interconnected energy hubs’ (IEHs) demand. The recovered energy is calculated by simulating the motion of the trains in MATLAB software. The electricity and heat demand response (DR) programs are integrated into the proposed model to study their impacts on the operating cost and the carbon emission of the IEH, considering several case studies. Furthermore, the uncertainties of the RBE, photovoltaic power generation, and loads of the IEH are considered by formulating the optimisation problem stochastically through a scenario-based approach. Therefore, a scenario generation and reduction decision-making technique is employed. Finally, the GAMS optimisation software is used to assess the efficiency of the presented MILP model. The simulation results indicate that the total operating cost of the IEH reduced 2.0% and 1.4% in the case studies. Also, the CO<sub>2</sub> emission is decreased by about 0.3% by applying the coordination scheme besides the DR programs.</p>","PeriodicalId":48518,"journal":{"name":"IET Electrical Systems in Transportation","volume":"11 4","pages":"362-376"},"PeriodicalIF":1.9000,"publicationDate":"2021-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://ietresearch.onlinelibrary.wiley.com/doi/epdf/10.1049/els2.12032","citationCount":"7","resultStr":"{\"title\":\"Optimal coordinated operation of integrated energy hubs, considering regenerative braking utilization\",\"authors\":\"Saeed Akbari,&nbsp;Seyed Saeed Fazel,&nbsp;Shahram Jadid\",\"doi\":\"10.1049/els2.12032\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>This article presents a coordinated operation model for energy management of a multi-integrated energy system based on Mixed-Integer Linear Programing (MILP). The power derived by trains from regenerative braking energy (RBE), during deceleration, is utilised to meet the interconnected energy hubs’ (IEHs) demand. The recovered energy is calculated by simulating the motion of the trains in MATLAB software. The electricity and heat demand response (DR) programs are integrated into the proposed model to study their impacts on the operating cost and the carbon emission of the IEH, considering several case studies. Furthermore, the uncertainties of the RBE, photovoltaic power generation, and loads of the IEH are considered by formulating the optimisation problem stochastically through a scenario-based approach. Therefore, a scenario generation and reduction decision-making technique is employed. Finally, the GAMS optimisation software is used to assess the efficiency of the presented MILP model. The simulation results indicate that the total operating cost of the IEH reduced 2.0% and 1.4% in the case studies. Also, the CO<sub>2</sub> emission is decreased by about 0.3% by applying the coordination scheme besides the DR programs.</p>\",\"PeriodicalId\":48518,\"journal\":{\"name\":\"IET Electrical Systems in Transportation\",\"volume\":\"11 4\",\"pages\":\"362-376\"},\"PeriodicalIF\":1.9000,\"publicationDate\":\"2021-06-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://ietresearch.onlinelibrary.wiley.com/doi/epdf/10.1049/els2.12032\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IET Electrical Systems in Transportation\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1049/els2.12032\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, ELECTRICAL & ELECTRONIC\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IET Electrical Systems in Transportation","FirstCategoryId":"5","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1049/els2.12032","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 7

摘要

Seyed Saeed Fazel,Narmak,德黑兰,16864,伊朗德黑兰。电子邮件:fazel@iust.ac.ir摘要本文提出了一个基于混合整数线性规划(MILP)的多集成能源系统能源管理协调运行模型。列车在减速期间从再生制动能量(RBE)中获得的动力用于满足互联能源枢纽(IEH)的需求。通过在MATLAB软件中模拟列车的运动来计算回收的能量。电力和热量需求响应(DR)计划被整合到拟议的模型中,以研究其对IEH运营成本和碳排放的影响,并考虑几个案例研究。此外,通过基于场景的方法随机制定优化问题,考虑了RBE、光伏发电和IEH负载的不确定性。因此,采用了场景生成和缩减决策技术。最后,使用GAMS优化软件来评估所提出的MILP模型的效率。仿真结果表明,在案例研究中,IEH的总运营成本分别降低了2.0%和1.4%。此外,通过在DR计划之外应用协调方案,CO2排放量减少了约0.3%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。

Optimal coordinated operation of integrated energy hubs, considering regenerative braking utilization

Optimal coordinated operation of integrated energy hubs, considering regenerative braking utilization

This article presents a coordinated operation model for energy management of a multi-integrated energy system based on Mixed-Integer Linear Programing (MILP). The power derived by trains from regenerative braking energy (RBE), during deceleration, is utilised to meet the interconnected energy hubs’ (IEHs) demand. The recovered energy is calculated by simulating the motion of the trains in MATLAB software. The electricity and heat demand response (DR) programs are integrated into the proposed model to study their impacts on the operating cost and the carbon emission of the IEH, considering several case studies. Furthermore, the uncertainties of the RBE, photovoltaic power generation, and loads of the IEH are considered by formulating the optimisation problem stochastically through a scenario-based approach. Therefore, a scenario generation and reduction decision-making technique is employed. Finally, the GAMS optimisation software is used to assess the efficiency of the presented MILP model. The simulation results indicate that the total operating cost of the IEH reduced 2.0% and 1.4% in the case studies. Also, the CO2 emission is decreased by about 0.3% by applying the coordination scheme besides the DR programs.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
5.80
自引率
4.30%
发文量
18
审稿时长
29 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信