道路建设项目竣工延误的主要原因分析——以坦桑尼亚为例

Q3 Social Sciences
Donati Michael Kullaya, Muluken Kassahun Alemu, C. Yeom
{"title":"道路建设项目竣工延误的主要原因分析——以坦桑尼亚为例","authors":"Donati Michael Kullaya, Muluken Kassahun Alemu, C. Yeom","doi":"10.2174/18744478-v16-e2208190","DOIUrl":null,"url":null,"abstract":"\n \n Completing road construction projects in time is a challenge for developing countries, specifically for Tanzania, where great economic costs result from difficulties in identifying and reducing the factors that cause the delay.\n \n \n \n This study addresses factors that cause the delay of a road construction project in Tanzania and proposes some methods that could potentially reduce this delay. A structured questionnaire was drawn up through an interactive online workshop with the help of experts and professionals from the road construction sector in Tanzania, and follow-up interviews were conducted.\n \n \n \n In addition, the first results were analyzed, and the factors identified were combined into five important groups, namely, client-related, consultant-related, contractor-related, design-related, and external factors. These were the main contributing aspects to delays in road construction projects in Tanzania.\n \n \n \n Furthermore, from across these groups, six significant causes of delays emerged, and these were inadequate access to finance and delayed payments for completed work, financial problems or difficulties, unwillingness or inability to sustain operations over long periods of non-payment, an unrealistic program of works (Works Schedule), inadequate site management, and political interference.\n","PeriodicalId":38631,"journal":{"name":"Open Transportation Journal","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-11-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An Analysis of the Main Causes of Delays in the Completion of Road Construction Projects: A Case Study of Tanzania\",\"authors\":\"Donati Michael Kullaya, Muluken Kassahun Alemu, C. Yeom\",\"doi\":\"10.2174/18744478-v16-e2208190\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n \\n Completing road construction projects in time is a challenge for developing countries, specifically for Tanzania, where great economic costs result from difficulties in identifying and reducing the factors that cause the delay.\\n \\n \\n \\n This study addresses factors that cause the delay of a road construction project in Tanzania and proposes some methods that could potentially reduce this delay. A structured questionnaire was drawn up through an interactive online workshop with the help of experts and professionals from the road construction sector in Tanzania, and follow-up interviews were conducted.\\n \\n \\n \\n In addition, the first results were analyzed, and the factors identified were combined into five important groups, namely, client-related, consultant-related, contractor-related, design-related, and external factors. These were the main contributing aspects to delays in road construction projects in Tanzania.\\n \\n \\n \\n Furthermore, from across these groups, six significant causes of delays emerged, and these were inadequate access to finance and delayed payments for completed work, financial problems or difficulties, unwillingness or inability to sustain operations over long periods of non-payment, an unrealistic program of works (Works Schedule), inadequate site management, and political interference.\\n\",\"PeriodicalId\":38631,\"journal\":{\"name\":\"Open Transportation Journal\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-11-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Open Transportation Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2174/18744478-v16-e2208190\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Social Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Open Transportation Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2174/18744478-v16-e2208190","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Social Sciences","Score":null,"Total":0}
引用次数: 0

摘要

及时完成道路建设项目对发展中国家来说是一项挑战,特别是对坦桑尼亚来说,由于难以查明和减少造成延误的因素,造成了巨大的经济成本。本研究解决了导致坦桑尼亚道路建设项目延误的因素,并提出了一些可能减少这种延误的方法。在坦桑尼亚道路建设部门的专家和专业人员的帮助下,通过互动式在线研讨会起草了一份结构化问卷,并进行了后续访谈。此外,对第一个结果进行了分析,并将确定的因素分为五个重要组,即客户相关因素、顾问相关因素、承包商相关因素、设计相关因素和外部因素。这些是造成坦桑尼亚道路建设项目拖延的主要因素。此外,从这些群体中,出现了六个重要的延迟原因,这些原因是无法获得资金和延迟支付已完成的工作,财务问题或困难,不愿意或无法在长期不付款的情况下维持运营,不切实际的工程计划(工程时间表),不适当的现场管理和政治干预。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An Analysis of the Main Causes of Delays in the Completion of Road Construction Projects: A Case Study of Tanzania
Completing road construction projects in time is a challenge for developing countries, specifically for Tanzania, where great economic costs result from difficulties in identifying and reducing the factors that cause the delay. This study addresses factors that cause the delay of a road construction project in Tanzania and proposes some methods that could potentially reduce this delay. A structured questionnaire was drawn up through an interactive online workshop with the help of experts and professionals from the road construction sector in Tanzania, and follow-up interviews were conducted. In addition, the first results were analyzed, and the factors identified were combined into five important groups, namely, client-related, consultant-related, contractor-related, design-related, and external factors. These were the main contributing aspects to delays in road construction projects in Tanzania. Furthermore, from across these groups, six significant causes of delays emerged, and these were inadequate access to finance and delayed payments for completed work, financial problems or difficulties, unwillingness or inability to sustain operations over long periods of non-payment, an unrealistic program of works (Works Schedule), inadequate site management, and political interference.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Open Transportation Journal
Open Transportation Journal Social Sciences-Transportation
CiteScore
2.10
自引率
0.00%
发文量
19
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信