{"title":"盾构施工扰动力不均匀分布引起的土体水平位移预测方法","authors":"Baoxin Jia, Zong-xian Gao, Hong-yan Hua","doi":"10.1139/facets-2022-0197","DOIUrl":null,"url":null,"abstract":"Based on the Mindlin solution, this paper considers the influence of factors such as the non-uniform distribution of additional thrust of the cutter head influenced by lateral earth pressure in shield excavation, the non-uniform distribution of friction of shield shell influenced by soil softening and slurry spreading, and the non-uniform distribution of grouting pressure influenced by slurry spreading on the horizontal displacement of soil. The existing prediction formula is revised and verified by engineering examples. It is found that: affected by the shield construction disturbance force, the horizontal displacement behind the excavation surface is larger than that in front of the excavation surface, and the peak value of the horizontal displacement appears around the tunnel axis; through the verification of engineering case, when calculating the horizontal displacement in front of the excavation surface, the calculation results of both the modified formula and the original formula are in good agreement with the measured values, which can reflect the change trend of the measured horizontal displacement; when calculating the horizontal displacement behind the excavation surface, the calculation result of the existing formula has a great error due to the assumption of uniform distribution of disturbance force, which is different from the law of the measured result; the calculation result of the modified prediction formula is obviously in better agreement with the measured deformation value, and the error is smaller, which is more in line with the engineering reality.","PeriodicalId":48511,"journal":{"name":"Facets","volume":null,"pages":null},"PeriodicalIF":2.9000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Prediction method of soil horizontal displacement caused by non-uniform distribution of disturbance force in shield construction\",\"authors\":\"Baoxin Jia, Zong-xian Gao, Hong-yan Hua\",\"doi\":\"10.1139/facets-2022-0197\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Based on the Mindlin solution, this paper considers the influence of factors such as the non-uniform distribution of additional thrust of the cutter head influenced by lateral earth pressure in shield excavation, the non-uniform distribution of friction of shield shell influenced by soil softening and slurry spreading, and the non-uniform distribution of grouting pressure influenced by slurry spreading on the horizontal displacement of soil. The existing prediction formula is revised and verified by engineering examples. It is found that: affected by the shield construction disturbance force, the horizontal displacement behind the excavation surface is larger than that in front of the excavation surface, and the peak value of the horizontal displacement appears around the tunnel axis; through the verification of engineering case, when calculating the horizontal displacement in front of the excavation surface, the calculation results of both the modified formula and the original formula are in good agreement with the measured values, which can reflect the change trend of the measured horizontal displacement; when calculating the horizontal displacement behind the excavation surface, the calculation result of the existing formula has a great error due to the assumption of uniform distribution of disturbance force, which is different from the law of the measured result; the calculation result of the modified prediction formula is obviously in better agreement with the measured deformation value, and the error is smaller, which is more in line with the engineering reality.\",\"PeriodicalId\":48511,\"journal\":{\"name\":\"Facets\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":2.9000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Facets\",\"FirstCategoryId\":\"103\",\"ListUrlMain\":\"https://doi.org/10.1139/facets-2022-0197\",\"RegionNum\":3,\"RegionCategory\":\"综合性期刊\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"MULTIDISCIPLINARY SCIENCES\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Facets","FirstCategoryId":"103","ListUrlMain":"https://doi.org/10.1139/facets-2022-0197","RegionNum":3,"RegionCategory":"综合性期刊","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"MULTIDISCIPLINARY SCIENCES","Score":null,"Total":0}
引用次数: 0

摘要

基于Mindlin解,本文考虑了盾构开挖中侧向土压力对刀盘附加推力分布的不均匀性、土体软化和浆液铺展对盾构壳体摩擦分布的不一致性等因素的影响,浆液铺展对土体水平位移的影响以及注浆压力的不均匀分布。对现有的预测公式进行了修正,并通过工程实例进行了验证。研究发现:受盾构施工扰动力影响,开挖面后水平位移大于开挖面前水平位移,水平位移峰值出现在隧道轴线附近;通过工程实例验证,在计算开挖面前水平位移时,修正公式和原公式的计算结果与实测值吻合较好,能够反映实测水平位移的变化趋势;在计算开挖面后水平位移时,由于假定扰动力均匀分布,现有公式的计算结果存在较大误差,与实测结果的规律不同;修正后的预测公式计算结果与实测变形值吻合较好,误差较小,更符合工程实际。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Prediction method of soil horizontal displacement caused by non-uniform distribution of disturbance force in shield construction
Based on the Mindlin solution, this paper considers the influence of factors such as the non-uniform distribution of additional thrust of the cutter head influenced by lateral earth pressure in shield excavation, the non-uniform distribution of friction of shield shell influenced by soil softening and slurry spreading, and the non-uniform distribution of grouting pressure influenced by slurry spreading on the horizontal displacement of soil. The existing prediction formula is revised and verified by engineering examples. It is found that: affected by the shield construction disturbance force, the horizontal displacement behind the excavation surface is larger than that in front of the excavation surface, and the peak value of the horizontal displacement appears around the tunnel axis; through the verification of engineering case, when calculating the horizontal displacement in front of the excavation surface, the calculation results of both the modified formula and the original formula are in good agreement with the measured values, which can reflect the change trend of the measured horizontal displacement; when calculating the horizontal displacement behind the excavation surface, the calculation result of the existing formula has a great error due to the assumption of uniform distribution of disturbance force, which is different from the law of the measured result; the calculation result of the modified prediction formula is obviously in better agreement with the measured deformation value, and the error is smaller, which is more in line with the engineering reality.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Facets
Facets MULTIDISCIPLINARY SCIENCES-
CiteScore
5.40
自引率
6.50%
发文量
48
审稿时长
28 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信