基于联合优化方法的考虑延期订单中断的集成维护调度库存策略调整

IF 1.8 Q3 ENGINEERING, INDUSTRIAL
S. Babaeimorad, P. Fattahi, H. Fazlollahtabar
{"title":"基于联合优化方法的考虑延期订单中断的集成维护调度库存策略调整","authors":"S. Babaeimorad, P. Fattahi, H. Fazlollahtabar","doi":"10.1108/jqme-12-2020-0122","DOIUrl":null,"url":null,"abstract":"PurposeThe purpose of this paper is to present an integrated strategy for inventory control and preventive maintenance planning for a single-machine production system with increasing failure rates.Design/methodology/approachThere are three scenarios for solving presented model. The strategy is such that the production component is placed under maintenance as soon as it reaches the m level or in the event of a malfunction earlier than m. Maintenance completion time is not predictable. As a result of periodic maintenance, a buffer stock h is held and the production component starts to produce from period A with the maximum throughput to satisfy demand and handle the shortage. A numerical algorithm to find the optimal policy is developed. The algorithm is implemented using MATLAB software.FindingsThe authors discovered that joint optimization mainly reduces production system costs. Cs is holding cost of a product unit during a unit of time. The authors consider two values for Cs, consist of, Cs = 1 and Cs = 2. By comparing the two cases, it is concluded that by reducing the cost from Cs = 2 to Cs = 1, the optimal scenario does not differ. The amount of decision variables decreases.Originality/valueThis paper is the provision of a model in which the shortage of back order type is considered, which greatly increases the complexity of the problem compared to similar issues. The methods for solving such problems are provided by the numerical algorithm, and the use of buffers as a way to compensate for the shortage in the event of a complete shutdown of the production line which is a very effective and efficient way to deal with customer loss.","PeriodicalId":16938,"journal":{"name":"Journal of Quality in Maintenance Engineering","volume":" ","pages":""},"PeriodicalIF":1.8000,"publicationDate":"2021-08-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Integrated maintenance scheduling inventory policy adjustment considering back order disruptions using joint optimization approach\",\"authors\":\"S. Babaeimorad, P. Fattahi, H. Fazlollahtabar\",\"doi\":\"10.1108/jqme-12-2020-0122\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PurposeThe purpose of this paper is to present an integrated strategy for inventory control and preventive maintenance planning for a single-machine production system with increasing failure rates.Design/methodology/approachThere are three scenarios for solving presented model. The strategy is such that the production component is placed under maintenance as soon as it reaches the m level or in the event of a malfunction earlier than m. Maintenance completion time is not predictable. As a result of periodic maintenance, a buffer stock h is held and the production component starts to produce from period A with the maximum throughput to satisfy demand and handle the shortage. A numerical algorithm to find the optimal policy is developed. The algorithm is implemented using MATLAB software.FindingsThe authors discovered that joint optimization mainly reduces production system costs. Cs is holding cost of a product unit during a unit of time. The authors consider two values for Cs, consist of, Cs = 1 and Cs = 2. By comparing the two cases, it is concluded that by reducing the cost from Cs = 2 to Cs = 1, the optimal scenario does not differ. The amount of decision variables decreases.Originality/valueThis paper is the provision of a model in which the shortage of back order type is considered, which greatly increases the complexity of the problem compared to similar issues. The methods for solving such problems are provided by the numerical algorithm, and the use of buffers as a way to compensate for the shortage in the event of a complete shutdown of the production line which is a very effective and efficient way to deal with customer loss.\",\"PeriodicalId\":16938,\"journal\":{\"name\":\"Journal of Quality in Maintenance Engineering\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":1.8000,\"publicationDate\":\"2021-08-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Quality in Maintenance Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/jqme-12-2020-0122\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Quality in Maintenance Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jqme-12-2020-0122","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 1

摘要

目的针对故障率不断增加的单机生产系统,提出一种库存控制和预防性维护计划的集成策略。设计/方法论/方法解决所提出的模型有三种方案。该策略是,一旦生产部件达到m级,或者在m级之前发生故障,就将其置于维护之下。维护完成时间是不可预测的。作为定期维护的结果,缓冲库存h被保持,并且生产部件从周期a开始以最大吞吐量生产,以满足需求并处理短缺。提出了一种求解最优策略的数值算法。该算法使用MATLAB软件实现。发现联合优化主要是降低生产系统成本。Cs是一个产品单位在一个时间单位内的持有成本。作者考虑了Cs的两个值,包括Cs=1和Cs=2。通过比较这两种情况,得出的结论是,通过将成本从Cs=2降低到Cs=1,最优方案没有差异。决策变量的数量减少。原创性/价值本文提供了一个模型,其中考虑了缺货类型的短缺,与类似问题相比,这大大增加了问题的复杂性。数值算法提供了解决这些问题的方法,并且在生产线完全关闭的情况下使用缓冲器作为补偿短缺的一种方式,这是处理客户损失的一种非常有效和高效的方式。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Integrated maintenance scheduling inventory policy adjustment considering back order disruptions using joint optimization approach
PurposeThe purpose of this paper is to present an integrated strategy for inventory control and preventive maintenance planning for a single-machine production system with increasing failure rates.Design/methodology/approachThere are three scenarios for solving presented model. The strategy is such that the production component is placed under maintenance as soon as it reaches the m level or in the event of a malfunction earlier than m. Maintenance completion time is not predictable. As a result of periodic maintenance, a buffer stock h is held and the production component starts to produce from period A with the maximum throughput to satisfy demand and handle the shortage. A numerical algorithm to find the optimal policy is developed. The algorithm is implemented using MATLAB software.FindingsThe authors discovered that joint optimization mainly reduces production system costs. Cs is holding cost of a product unit during a unit of time. The authors consider two values for Cs, consist of, Cs = 1 and Cs = 2. By comparing the two cases, it is concluded that by reducing the cost from Cs = 2 to Cs = 1, the optimal scenario does not differ. The amount of decision variables decreases.Originality/valueThis paper is the provision of a model in which the shortage of back order type is considered, which greatly increases the complexity of the problem compared to similar issues. The methods for solving such problems are provided by the numerical algorithm, and the use of buffers as a way to compensate for the shortage in the event of a complete shutdown of the production line which is a very effective and efficient way to deal with customer loss.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Quality in Maintenance Engineering
Journal of Quality in Maintenance Engineering Engineering-Safety, Risk, Reliability and Quality
CiteScore
4.00
自引率
13.30%
发文量
24
期刊介绍: This exciting journal looks at maintenance engineering from a positive standpoint, and clarifies its recently elevatedstatus as a highly technical, scientific, and complex field. Typical areas examined include: ■Budget and control ■Equipment management ■Maintenance information systems ■Process capability and maintenance ■Process monitoring techniques ■Reliability-based maintenance ■Replacement and life cycle costs ■TQM and maintenance
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信