{"title":"通过使用Aspen软件进行的垃圾处理","authors":"Amrul Amrul, Dedi Triyadi, I. M. Gandidi","doi":"10.23960/mech.v10.i1.201904","DOIUrl":null,"url":null,"abstract":"ABSTRACT \n \nMunicipal Solid Waste becomes one of the most unbreakable major problem in cities in Indonesia than other problem. The heat that can be generated from municipal waste reaches 25,2 MJ / kg (6.000 kcal / kg) into one potential alternative energy source to be developed. One development that can be done is to do heat treatment with a solid fuel end product or called torrefaction.The objective of the study was to obtain solid fuel products equivalent to sub-bituminous coal. Developing a laboratory scale system for laboratory waste dumping using a tubular tube, calculates the energy requirement of waste dumping process with 50-80% moisture content in feed waste.The study used ASPENTM simulation software is to simulate the municipal solid waste system laboratory scale process using tubular reactor. The waste system's waste capacity is 5 kg / hour. The simulation system consists of a reactor dryer (Rstoic), reorefaction reactor (RYield), separator and splitsparator. The process of cultivation is retained at \n100°C and the torefaction at 275°C occurs continuously on the tubular tube.The simulation results show that the waste water content of the baits has an effect on the energy needs in the drying process and the process of torefaction to the city. Drying energy requirements increased 1,3 kW-3,2 kW on waste water content varation 30- \n80%, while solid fuel production reduced about 1,9 kg/hour to 0,5 kg/hour. \n \nKeywords: Waste, torrefaction continuous, simulation, Aspen plus.","PeriodicalId":31342,"journal":{"name":"Mechanical","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Simulasi Proses Torefaksi Sampah Sistem Kontinu Menggunakan Software Aspen Plus\",\"authors\":\"Amrul Amrul, Dedi Triyadi, I. M. Gandidi\",\"doi\":\"10.23960/mech.v10.i1.201904\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT \\n \\nMunicipal Solid Waste becomes one of the most unbreakable major problem in cities in Indonesia than other problem. The heat that can be generated from municipal waste reaches 25,2 MJ / kg (6.000 kcal / kg) into one potential alternative energy source to be developed. One development that can be done is to do heat treatment with a solid fuel end product or called torrefaction.The objective of the study was to obtain solid fuel products equivalent to sub-bituminous coal. Developing a laboratory scale system for laboratory waste dumping using a tubular tube, calculates the energy requirement of waste dumping process with 50-80% moisture content in feed waste.The study used ASPENTM simulation software is to simulate the municipal solid waste system laboratory scale process using tubular reactor. The waste system's waste capacity is 5 kg / hour. The simulation system consists of a reactor dryer (Rstoic), reorefaction reactor (RYield), separator and splitsparator. The process of cultivation is retained at \\n100°C and the torefaction at 275°C occurs continuously on the tubular tube.The simulation results show that the waste water content of the baits has an effect on the energy needs in the drying process and the process of torefaction to the city. Drying energy requirements increased 1,3 kW-3,2 kW on waste water content varation 30- \\n80%, while solid fuel production reduced about 1,9 kg/hour to 0,5 kg/hour. \\n \\nKeywords: Waste, torrefaction continuous, simulation, Aspen plus.\",\"PeriodicalId\":31342,\"journal\":{\"name\":\"Mechanical\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-03-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mechanical\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.23960/mech.v10.i1.201904\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mechanical","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23960/mech.v10.i1.201904","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

城市固体废物是印尼城市中最为棘手的重大问题之一。城市垃圾产生的热量达到25,2 MJ / kg (6,000 kcal / kg),成为一种有待开发的潜在替代能源。可以做的一项发展是用固体燃料的最终产物进行热处理,或称为烘烤。这项研究的目的是获得相当于次烟煤的固体燃料产品。研制了一种采用管状管道倾倒实验室废弃物的实验室规模系统,计算了饲料废弃物含水率为50-80%时倾倒过程的能量需求。本研究采用ASPENTM仿真软件对城市生活垃圾处理系统实验室规模的管式反应器过程进行了模拟。废物处理系统的废物处理能力为5公斤/小时。该模拟系统由反应器干燥器(Rstoic)、再反应器(RYield)、分离器和分离分离器组成。在100℃下保持培养过程,275℃下在管状管上连续进行发酵。模拟结果表明,鱼饵的废水含量对鱼饵干燥过程和向城市转化过程中的能量需求有影响。干燥能量需求增加1.3 kW- 3.2 kW,废水含量变化30- 80%,而固体燃料产量减少约1.9 kg/小时至0.5 kg/小时。关键词:废弃物,连续焙烧,模拟,白杨加。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Simulasi Proses Torefaksi Sampah Sistem Kontinu Menggunakan Software Aspen Plus
ABSTRACT Municipal Solid Waste becomes one of the most unbreakable major problem in cities in Indonesia than other problem. The heat that can be generated from municipal waste reaches 25,2 MJ / kg (6.000 kcal / kg) into one potential alternative energy source to be developed. One development that can be done is to do heat treatment with a solid fuel end product or called torrefaction.The objective of the study was to obtain solid fuel products equivalent to sub-bituminous coal. Developing a laboratory scale system for laboratory waste dumping using a tubular tube, calculates the energy requirement of waste dumping process with 50-80% moisture content in feed waste.The study used ASPENTM simulation software is to simulate the municipal solid waste system laboratory scale process using tubular reactor. The waste system's waste capacity is 5 kg / hour. The simulation system consists of a reactor dryer (Rstoic), reorefaction reactor (RYield), separator and splitsparator. The process of cultivation is retained at 100°C and the torefaction at 275°C occurs continuously on the tubular tube.The simulation results show that the waste water content of the baits has an effect on the energy needs in the drying process and the process of torefaction to the city. Drying energy requirements increased 1,3 kW-3,2 kW on waste water content varation 30- 80%, while solid fuel production reduced about 1,9 kg/hour to 0,5 kg/hour. Keywords: Waste, torrefaction continuous, simulation, Aspen plus.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信