加拿大多伦多和英国伦敦2000年至2018年交通基础设施交付时间表

IF 2.1 4区 工程技术 Q3 TRANSPORTATION
Shoshanna Saxe, M. Dean, Shivani Raghav, Daniel Durrant, Matti Siemiatycki
{"title":"加拿大多伦多和英国伦敦2000年至2018年交通基础设施交付时间表","authors":"Shoshanna Saxe, M. Dean, Shivani Raghav, Daniel Durrant, Matti Siemiatycki","doi":"10.18757/EJTIR.2021.21.3.5515","DOIUrl":null,"url":null,"abstract":"This paper explores the timelines of large transportation infrastructure delivery, from first proposal to construction and opening in London, UK and Toronto, Canada. The goal of the paper is to identify both how long it takes projects to go from idea to delivery, the relative time of different stages in the delivery process, and if projects with long timelines see physical or technological changes in their design. This work contributes to two ongoing discussions around the speed of infrastructure delivery, one that argues infrastructure moves too slowly and major efforts are needed to speed delivery and another that argues that good infrastructure thinking requires time to breathe and care should be taken in rushing through the delivery process. Detailed delivery timelines from initial proposal to construction or operation are developed for 26 transportation projects (16 in Toronto and 10 in London) between the years 2000 and 2018. For each project the timelines of inception, approval, planning, procurement, environmental assessment, construction and operational phases are identified and compared. Long informal gestation periods are identified for many projects, particularly for linear projects. In many instances the informal gestation period dwarfs the time projects spent in formal planning. This research highlights the need to expand the conception of timeliness of infrastructure delivery to include the lengthy periods of informal debate and planning that can span years and build up community expectations about the imminence of a project, even before it has received formal assessment or approval. Detailed delivery timelines from initial proposal to construction or operation are developed for 26 transportation projects (16 in Toronto and 10 in London) between the years 2000 and 2018. For each project the timelines of inception, approval, planning, procurement, environmental assessment, construction and operational phases are identified and compared. Long informal gestational periods are identified for many projects, particularly for linear projects. In many instances the informal gestation period dwarfs the time projects spent in formal planning. This research highlights the need to expand the conception of timeliness of infrastructure delivery to include the lengthy periods of informal debate and planning that can span years and build up community expectations about the imminence of a project, even before it has received formal assessment or approval. ","PeriodicalId":46721,"journal":{"name":"European Journal of Transport and Infrastructure Research","volume":" ","pages":""},"PeriodicalIF":2.1000,"publicationDate":"2021-08-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Timelines of Transportation Infrastructure Delivery 2000 to 2018 in Toronto, Canada and London, UK\",\"authors\":\"Shoshanna Saxe, M. Dean, Shivani Raghav, Daniel Durrant, Matti Siemiatycki\",\"doi\":\"10.18757/EJTIR.2021.21.3.5515\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper explores the timelines of large transportation infrastructure delivery, from first proposal to construction and opening in London, UK and Toronto, Canada. The goal of the paper is to identify both how long it takes projects to go from idea to delivery, the relative time of different stages in the delivery process, and if projects with long timelines see physical or technological changes in their design. This work contributes to two ongoing discussions around the speed of infrastructure delivery, one that argues infrastructure moves too slowly and major efforts are needed to speed delivery and another that argues that good infrastructure thinking requires time to breathe and care should be taken in rushing through the delivery process. Detailed delivery timelines from initial proposal to construction or operation are developed for 26 transportation projects (16 in Toronto and 10 in London) between the years 2000 and 2018. For each project the timelines of inception, approval, planning, procurement, environmental assessment, construction and operational phases are identified and compared. Long informal gestation periods are identified for many projects, particularly for linear projects. In many instances the informal gestation period dwarfs the time projects spent in formal planning. This research highlights the need to expand the conception of timeliness of infrastructure delivery to include the lengthy periods of informal debate and planning that can span years and build up community expectations about the imminence of a project, even before it has received formal assessment or approval. Detailed delivery timelines from initial proposal to construction or operation are developed for 26 transportation projects (16 in Toronto and 10 in London) between the years 2000 and 2018. For each project the timelines of inception, approval, planning, procurement, environmental assessment, construction and operational phases are identified and compared. Long informal gestational periods are identified for many projects, particularly for linear projects. In many instances the informal gestation period dwarfs the time projects spent in formal planning. This research highlights the need to expand the conception of timeliness of infrastructure delivery to include the lengthy periods of informal debate and planning that can span years and build up community expectations about the imminence of a project, even before it has received formal assessment or approval. \",\"PeriodicalId\":46721,\"journal\":{\"name\":\"European Journal of Transport and Infrastructure Research\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":2.1000,\"publicationDate\":\"2021-08-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"European Journal of Transport and Infrastructure Research\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.18757/EJTIR.2021.21.3.5515\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"TRANSPORTATION\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Journal of Transport and Infrastructure Research","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.18757/EJTIR.2021.21.3.5515","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"TRANSPORTATION","Score":null,"Total":0}
引用次数: 1

摘要

本文探讨了英国伦敦和加拿大多伦多的大型交通基础设施交付的时间表,从最初的提案到建设和开放。本文的目标是确定项目从想法到交付所需的时间,交付过程中不同阶段的相对时间,以及具有较长时间线的项目是否在其设计中看到物理或技术变化。这项工作促成了围绕基础设施交付速度的两种正在进行的讨论,一种认为基础设施进展太慢,需要付出重大努力来加快交付,另一种认为,良好的基础设施思维需要时间喘息,在匆忙完成交付过程时应谨慎行事。从2000年到2018年,为26个交通项目(多伦多16个,伦敦10个)制定了从最初提案到建设或运营的详细交付时间表。对每个项目的启动、审批、规划、采购、环境评估、建设和运营阶段的时间表进行了确定和比较。对于许多项目,特别是线性项目,确定了长时间的非正式酝酿造期。在许多情况下,非正式的酝酿期使项目花费在正式规划上的时间相形见绌。这项研究强调,有必要扩大基础设施交付及时性的概念,使其包括可能长达数年的长期非正式辩论和规划,甚至在项目获得正式评估或批准之前就建立起社区对项目迫近性的期望。从2000年到2018年,为26个交通项目(多伦多16个,伦敦10个)制定了从最初提案到建设或运营的详细交付时间表。对每个项目的启动、审批、规划、采购、环境评估、建设和运营阶段的时间表进行了确定和比较。对于许多项目,特别是线性项目,确定了较长的非正式酝酿造期。在许多情况下,非正式的酝酿期使项目花费在正式规划上的时间相形见绌。这项研究强调,有必要扩大基础设施交付及时性的概念,使其包括可能长达数年的长期非正式辩论和规划,甚至在项目获得正式评估或批准之前就建立起社区对项目迫近性的期望。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Timelines of Transportation Infrastructure Delivery 2000 to 2018 in Toronto, Canada and London, UK
This paper explores the timelines of large transportation infrastructure delivery, from first proposal to construction and opening in London, UK and Toronto, Canada. The goal of the paper is to identify both how long it takes projects to go from idea to delivery, the relative time of different stages in the delivery process, and if projects with long timelines see physical or technological changes in their design. This work contributes to two ongoing discussions around the speed of infrastructure delivery, one that argues infrastructure moves too slowly and major efforts are needed to speed delivery and another that argues that good infrastructure thinking requires time to breathe and care should be taken in rushing through the delivery process. Detailed delivery timelines from initial proposal to construction or operation are developed for 26 transportation projects (16 in Toronto and 10 in London) between the years 2000 and 2018. For each project the timelines of inception, approval, planning, procurement, environmental assessment, construction and operational phases are identified and compared. Long informal gestation periods are identified for many projects, particularly for linear projects. In many instances the informal gestation period dwarfs the time projects spent in formal planning. This research highlights the need to expand the conception of timeliness of infrastructure delivery to include the lengthy periods of informal debate and planning that can span years and build up community expectations about the imminence of a project, even before it has received formal assessment or approval. Detailed delivery timelines from initial proposal to construction or operation are developed for 26 transportation projects (16 in Toronto and 10 in London) between the years 2000 and 2018. For each project the timelines of inception, approval, planning, procurement, environmental assessment, construction and operational phases are identified and compared. Long informal gestational periods are identified for many projects, particularly for linear projects. In many instances the informal gestation period dwarfs the time projects spent in formal planning. This research highlights the need to expand the conception of timeliness of infrastructure delivery to include the lengthy periods of informal debate and planning that can span years and build up community expectations about the imminence of a project, even before it has received formal assessment or approval. 
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.80
自引率
0.00%
发文量
0
审稿时长
30 weeks
期刊介绍: The European Journal of Transport and Infrastructure Research (EJTIR) is a peer-reviewed scholarly journal, freely accessible through the internet. EJTIR aims to present the results of high-quality scientific research to a readership of academics, practitioners and policy-makers. It is our ambition to be the journal of choice in the field of transport and infrastructure both for readers and authors. To achieve this ambition, EJTIR distinguishes itself from other journals in its field, both through its scope and the way it is published.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信