制造业的项目管理

Shubham Mohan Gujar, Najla Shafighi
{"title":"制造业的项目管理","authors":"Shubham Mohan Gujar, Najla Shafighi","doi":"10.14738/abr.118.15160","DOIUrl":null,"url":null,"abstract":"This study will analyze the role of automation cloud-based project management software in managing and optimizing manufacturing plans and data. The objective is to understand the evolution of automated and cloud-based project management software like Jira and Asana by incorporating beneficial of traditional Gantt charts and work breakdown structures for manufacturing companies. The questionnaire was designed to collect data from 100 project managers employed in various manufacturing units. The data were quantitatively analyzed using both statistical analysis and a test of association. The objective was to understand the factors contributing to the automated and cloud-based project management software, and the challenges faced by the project managers in the incorporation of traditional Gantt charts and work breakdown structures, in the complex and time-consuming tasks associated with project management.","PeriodicalId":72277,"journal":{"name":"Archives of business research","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-08-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Project Management in the Manufacturing Sector\",\"authors\":\"Shubham Mohan Gujar, Najla Shafighi\",\"doi\":\"10.14738/abr.118.15160\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study will analyze the role of automation cloud-based project management software in managing and optimizing manufacturing plans and data. The objective is to understand the evolution of automated and cloud-based project management software like Jira and Asana by incorporating beneficial of traditional Gantt charts and work breakdown structures for manufacturing companies. The questionnaire was designed to collect data from 100 project managers employed in various manufacturing units. The data were quantitatively analyzed using both statistical analysis and a test of association. The objective was to understand the factors contributing to the automated and cloud-based project management software, and the challenges faced by the project managers in the incorporation of traditional Gantt charts and work breakdown structures, in the complex and time-consuming tasks associated with project management.\",\"PeriodicalId\":72277,\"journal\":{\"name\":\"Archives of business research\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-08-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Archives of business research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.14738/abr.118.15160\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Archives of business research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14738/abr.118.15160","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究将分析基于云的自动化项目管理软件在管理和优化制造计划和数据中的作用。我们的目标是了解自动化和基于云的项目管理软件的演变,如Jira和Asana,通过结合传统甘特图和制造公司的工作分解结构的好处。该问卷旨在收集来自不同制造单位的100名项目经理的数据。使用统计分析和关联检验对数据进行定量分析。目的是了解促成自动化和基于云的项目管理软件的因素,以及项目经理在整合传统甘特图和工作分解结构时所面临的挑战,以及与项目管理相关的复杂和耗时的任务。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Project Management in the Manufacturing Sector
This study will analyze the role of automation cloud-based project management software in managing and optimizing manufacturing plans and data. The objective is to understand the evolution of automated and cloud-based project management software like Jira and Asana by incorporating beneficial of traditional Gantt charts and work breakdown structures for manufacturing companies. The questionnaire was designed to collect data from 100 project managers employed in various manufacturing units. The data were quantitatively analyzed using both statistical analysis and a test of association. The objective was to understand the factors contributing to the automated and cloud-based project management software, and the challenges faced by the project managers in the incorporation of traditional Gantt charts and work breakdown structures, in the complex and time-consuming tasks associated with project management.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信