布里亚特能源发展的问题与展望

G. Borisov
{"title":"布里亚特能源发展的问题与展望","authors":"G. Borisov","doi":"10.1080/10611991.2020.2033509","DOIUrl":null,"url":null,"abstract":"ABSTRACT The article analyzes the electric power industry of the Republic of Buryatia and discusses its main problems. The solution of these problems determines the key objectives of the industry’s further development. Several environment problems and the efficiency of the energy system are considered in relation to the protection of Lake Baikal. It is necessary to develop and implement new programs to update existing power plants and to reconstruct the electricity and heating grids to improve the energy security of the republic. The capacity of the Ulan-Ude Central Heating Power Plant-2 should be commissioned to increase the efficiency of the energy system and to improve Ulan Ude’s municipal development. The article specifies the amount and capacity of electric power needed to supply heating for the Central Ecological Zone of the Baikal Natural Territory. Reasons are given for why the water level of Lake Baikal needs to be regulated via an environmentally sound approach, which concerns the entire electric power industry of the Baikal region. This is important for the projected growth of the energy systems of the Baikal region and for amending the laws governing how water is used by the Angarsk cascade of hydroelectric power plants. Instead of building hydroelectric power plants in the Selenga River basin, an alternative scheme for supplying electricity to Mongolia is considered via the surplus electricity of the Gusinoozersk State District Power Plant. The construction of the Moksk Hydroelectric Power Plant is considered as a means of supplying energy to the North Baikal region.","PeriodicalId":85345,"journal":{"name":"Problems of economic transition","volume":"62 1","pages":"491 - 503"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"The Problems and Prospects of Energy Development in Buryatia\",\"authors\":\"G. Borisov\",\"doi\":\"10.1080/10611991.2020.2033509\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT The article analyzes the electric power industry of the Republic of Buryatia and discusses its main problems. The solution of these problems determines the key objectives of the industry’s further development. Several environment problems and the efficiency of the energy system are considered in relation to the protection of Lake Baikal. It is necessary to develop and implement new programs to update existing power plants and to reconstruct the electricity and heating grids to improve the energy security of the republic. The capacity of the Ulan-Ude Central Heating Power Plant-2 should be commissioned to increase the efficiency of the energy system and to improve Ulan Ude’s municipal development. The article specifies the amount and capacity of electric power needed to supply heating for the Central Ecological Zone of the Baikal Natural Territory. Reasons are given for why the water level of Lake Baikal needs to be regulated via an environmentally sound approach, which concerns the entire electric power industry of the Baikal region. This is important for the projected growth of the energy systems of the Baikal region and for amending the laws governing how water is used by the Angarsk cascade of hydroelectric power plants. Instead of building hydroelectric power plants in the Selenga River basin, an alternative scheme for supplying electricity to Mongolia is considered via the surplus electricity of the Gusinoozersk State District Power Plant. The construction of the Moksk Hydroelectric Power Plant is considered as a means of supplying energy to the North Baikal region.\",\"PeriodicalId\":85345,\"journal\":{\"name\":\"Problems of economic transition\",\"volume\":\"62 1\",\"pages\":\"491 - 503\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Problems of economic transition\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/10611991.2020.2033509\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Problems of economic transition","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/10611991.2020.2033509","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

本文分析了布里亚特共和国的电力工业,并讨论了其主要问题。这些问题的解决决定了该行业进一步发展的关键目标。贝加尔湖的保护考虑了几个环境问题和能源系统的效率。有必要制定和实施新的计划,更新现有的发电厂,重建电力和供暖网络,以改善共和国的能源安全。乌兰乌德集中供热发电厂2的容量应进行调试,以提高能源系统的效率,改善乌兰乌德市的市政发展。该条款规定了贝加尔湖自然区中央生态区供暖所需的电力量和容量。给出了贝加尔湖水位需要通过无害环境的方法进行调节的原因,这涉及贝加尔湖地区的整个电力行业。这对于贝加尔湖地区能源系统的预计增长以及修改安格尔斯克梯级水电站用水法律都很重要。考虑通过古西诺泽尔斯克州地区发电厂的剩余电力向蒙古供电的替代方案,而不是在塞伦加河流域建造水电站。Moksk水电站的建设被认为是向北贝加尔地区供应能源的一种方式。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Problems and Prospects of Energy Development in Buryatia
ABSTRACT The article analyzes the electric power industry of the Republic of Buryatia and discusses its main problems. The solution of these problems determines the key objectives of the industry’s further development. Several environment problems and the efficiency of the energy system are considered in relation to the protection of Lake Baikal. It is necessary to develop and implement new programs to update existing power plants and to reconstruct the electricity and heating grids to improve the energy security of the republic. The capacity of the Ulan-Ude Central Heating Power Plant-2 should be commissioned to increase the efficiency of the energy system and to improve Ulan Ude’s municipal development. The article specifies the amount and capacity of electric power needed to supply heating for the Central Ecological Zone of the Baikal Natural Territory. Reasons are given for why the water level of Lake Baikal needs to be regulated via an environmentally sound approach, which concerns the entire electric power industry of the Baikal region. This is important for the projected growth of the energy systems of the Baikal region and for amending the laws governing how water is used by the Angarsk cascade of hydroelectric power plants. Instead of building hydroelectric power plants in the Selenga River basin, an alternative scheme for supplying electricity to Mongolia is considered via the surplus electricity of the Gusinoozersk State District Power Plant. The construction of the Moksk Hydroelectric Power Plant is considered as a means of supplying energy to the North Baikal region.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信