{"title":"福岛第一核电站退役的制度结构。","authors":"Hajimu Yamana","doi":"10.1177/01466453211015396","DOIUrl":null,"url":null,"abstract":"<p><p>This paper does not necessarily reflect the views of the International Commission on Radiological Protection.This article describes the institutional structure established for decommissioning Fukushima Daiichi nuclear power plant. To deal with the aftermath of the unprecedented nuclear accident in Fukushima, several responsible institutions such as Ministry of Economy, Trade and Industry (METI), Ministry of Education, Culture, Sports, Science and Technology (MEXT) have worked together at the initiative of the Government of Japan. In this structure, Tokyo Electric Power Company Holdings (TEPCO) implements the decommissioning due to its legal responsibility, while the essential direction and milestones are set by the Nuclear Emergency Response Headquarters of the Government of Japan. Nuclear Damage Compensation and Decommissioning Facilitation Corporation, a government-affiliated organisation, oversees and facilitates the decommissioning by TEPCO, and the Nuclear Regulatory Authority regulates safety from an independent standpoint. The main basic elements essential for the success of this long-term project have been developed, such as the technical strategy, financial system, and organisational capability. Decommissioning is making progress.</p>","PeriodicalId":39551,"journal":{"name":"Annals of the ICRP","volume":"50 1_suppl","pages":"15-23"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1177/01466453211015396","citationCount":"0","resultStr":"{\"title\":\"The institutional structure for decommissioning Fukushima Daiichi nuclear power plant.\",\"authors\":\"Hajimu Yamana\",\"doi\":\"10.1177/01466453211015396\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p><p>This paper does not necessarily reflect the views of the International Commission on Radiological Protection.This article describes the institutional structure established for decommissioning Fukushima Daiichi nuclear power plant. To deal with the aftermath of the unprecedented nuclear accident in Fukushima, several responsible institutions such as Ministry of Economy, Trade and Industry (METI), Ministry of Education, Culture, Sports, Science and Technology (MEXT) have worked together at the initiative of the Government of Japan. In this structure, Tokyo Electric Power Company Holdings (TEPCO) implements the decommissioning due to its legal responsibility, while the essential direction and milestones are set by the Nuclear Emergency Response Headquarters of the Government of Japan. Nuclear Damage Compensation and Decommissioning Facilitation Corporation, a government-affiliated organisation, oversees and facilitates the decommissioning by TEPCO, and the Nuclear Regulatory Authority regulates safety from an independent standpoint. The main basic elements essential for the success of this long-term project have been developed, such as the technical strategy, financial system, and organisational capability. Decommissioning is making progress.</p>\",\"PeriodicalId\":39551,\"journal\":{\"name\":\"Annals of the ICRP\",\"volume\":\"50 1_suppl\",\"pages\":\"15-23\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1177/01466453211015396\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Annals of the ICRP\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1177/01466453211015396\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"2021/7/14 0:00:00\",\"PubModel\":\"Epub\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Annals of the ICRP","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/01466453211015396","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2021/7/14 0:00:00","PubModel":"Epub","JCR":"","JCRName":"","Score":null,"Total":0}
The institutional structure for decommissioning Fukushima Daiichi nuclear power plant.
This paper does not necessarily reflect the views of the International Commission on Radiological Protection.This article describes the institutional structure established for decommissioning Fukushima Daiichi nuclear power plant. To deal with the aftermath of the unprecedented nuclear accident in Fukushima, several responsible institutions such as Ministry of Economy, Trade and Industry (METI), Ministry of Education, Culture, Sports, Science and Technology (MEXT) have worked together at the initiative of the Government of Japan. In this structure, Tokyo Electric Power Company Holdings (TEPCO) implements the decommissioning due to its legal responsibility, while the essential direction and milestones are set by the Nuclear Emergency Response Headquarters of the Government of Japan. Nuclear Damage Compensation and Decommissioning Facilitation Corporation, a government-affiliated organisation, oversees and facilitates the decommissioning by TEPCO, and the Nuclear Regulatory Authority regulates safety from an independent standpoint. The main basic elements essential for the success of this long-term project have been developed, such as the technical strategy, financial system, and organisational capability. Decommissioning is making progress.
Annals of the ICRPMedicine-Public Health, Environmental and Occupational Health
CiteScore
4.10
自引率
0.00%
发文量
3
期刊介绍:
The International Commission on Radiological Protection was founded in 1928 to advance for the public benefit the science of radiological protection. The ICRP provides recommendations and guidance on protection against the risks associated with ionising radiation, from artificial sources as widely used in medicine, general industry and nuclear enterprises, and from naturally occurring sources. These reports and recommendations are published six times each year on behalf of the ICRP as the journal Annals of the ICRP. Each issue provides in-depth coverage of a specific subject area.