{"title":"奥运大坝:必和必拓放眼未来。","authors":"P Cuthbert","doi":"10.1177/0146645320960681","DOIUrl":null,"url":null,"abstract":"<p><p>Olympic Dam is one of the world's most significant polymetallic orebodies producing copper, uranium, gold, and silver in remote South Australia. The polymetallic deposit is located 520 km north-northwest of Adelaide, South Australia and has an inferred resource of 2660 Mt at 1.2% Cu, 1.4 kg t<sup>-1</sup> U<sub>3</sub>Os, and 0.5 g t<sup>-1</sup> Au. Ore is mined from the underground operation at a rate of approximately 10 mt year<sup>-1</sup>, and is processed on site through a concentrator and hydrometallurgical facility, smelter, and electrolytic refinery. Olympic Dam is one of the only sites in the world to claim the 'mine to market' title. Protection of the workforce and the environment has been a primary focus for the operations through its 30+ year life and will continue to be into the future. Broken Hill Propriety Company (BHP) believes that its most important asset is its people. With such a large orebody and a very long potential mine life, it is important to think strategically about the future to ensure the viability of the operation. This requires development of mine and surface processing facilities in a staged manner. Importantly, it also involves the development of people. This presentation provides an overview of BHP's work at Olympic Dam and outlines development plans for Olympic Dam into the future.© 2020 ICRP. Published by SAGE.</p>","PeriodicalId":39551,"journal":{"name":"Annals of the ICRP","volume":"49 1_suppl","pages":"45"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1177/0146645320960681","citationCount":"0","resultStr":"{\"title\":\"Olympic Dam: BHP thinking big about the future.\",\"authors\":\"P Cuthbert\",\"doi\":\"10.1177/0146645320960681\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p><p>Olympic Dam is one of the world's most significant polymetallic orebodies producing copper, uranium, gold, and silver in remote South Australia. The polymetallic deposit is located 520 km north-northwest of Adelaide, South Australia and has an inferred resource of 2660 Mt at 1.2% Cu, 1.4 kg t<sup>-1</sup> U<sub>3</sub>Os, and 0.5 g t<sup>-1</sup> Au. Ore is mined from the underground operation at a rate of approximately 10 mt year<sup>-1</sup>, and is processed on site through a concentrator and hydrometallurgical facility, smelter, and electrolytic refinery. Olympic Dam is one of the only sites in the world to claim the 'mine to market' title. Protection of the workforce and the environment has been a primary focus for the operations through its 30+ year life and will continue to be into the future. Broken Hill Propriety Company (BHP) believes that its most important asset is its people. With such a large orebody and a very long potential mine life, it is important to think strategically about the future to ensure the viability of the operation. This requires development of mine and surface processing facilities in a staged manner. Importantly, it also involves the development of people. This presentation provides an overview of BHP's work at Olympic Dam and outlines development plans for Olympic Dam into the future.© 2020 ICRP. Published by SAGE.</p>\",\"PeriodicalId\":39551,\"journal\":{\"name\":\"Annals of the ICRP\",\"volume\":\"49 1_suppl\",\"pages\":\"45\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1177/0146645320960681\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Annals of the ICRP\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1177/0146645320960681\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Annals of the ICRP","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/0146645320960681","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

奥林匹克大坝是世界上最重要的多金属矿体之一,位于偏远的南澳大利亚,生产铜、铀、金和银。该多金属矿床位于南澳大利亚州阿德莱德西北偏北520公里处,推断资源量为2660公吨,含1.2% Cu、1.4 kg t-1 u30和0.5 g t-1 Au。矿石以每年约1000万吨的速度从地下开采,并通过选矿厂和湿法冶金设施、冶炼厂和电解精炼厂在现场进行加工。奥林匹克大坝是世界上仅有的几个拥有“矿山到市场”称号的地点之一。在其30多年的生命周期中,对劳动力和环境的保护一直是运营的主要关注点,并将持续到未来。必和必拓认为,公司最重要的资产是员工。如此大的矿体和很长的潜在矿山寿命,重要的是战略性地考虑未来,以确保作业的可行性。这就要求分阶段发展矿山和地面加工设施。重要的是,它还涉及人的发展。本报告概述了必和必拓在奥林匹克大坝的工作,并概述了奥林匹克大坝未来的发展计划。©2020 icrp。SAGE出版。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Olympic Dam: BHP thinking big about the future.

Olympic Dam is one of the world's most significant polymetallic orebodies producing copper, uranium, gold, and silver in remote South Australia. The polymetallic deposit is located 520 km north-northwest of Adelaide, South Australia and has an inferred resource of 2660 Mt at 1.2% Cu, 1.4 kg t-1 U3Os, and 0.5 g t-1 Au. Ore is mined from the underground operation at a rate of approximately 10 mt year-1, and is processed on site through a concentrator and hydrometallurgical facility, smelter, and electrolytic refinery. Olympic Dam is one of the only sites in the world to claim the 'mine to market' title. Protection of the workforce and the environment has been a primary focus for the operations through its 30+ year life and will continue to be into the future. Broken Hill Propriety Company (BHP) believes that its most important asset is its people. With such a large orebody and a very long potential mine life, it is important to think strategically about the future to ensure the viability of the operation. This requires development of mine and surface processing facilities in a staged manner. Importantly, it also involves the development of people. This presentation provides an overview of BHP's work at Olympic Dam and outlines development plans for Olympic Dam into the future.© 2020 ICRP. Published by SAGE.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Annals of the ICRP
Annals of the ICRP Medicine-Public Health, Environmental and Occupational Health
CiteScore
4.10
自引率
0.00%
发文量
3
期刊介绍: The International Commission on Radiological Protection was founded in 1928 to advance for the public benefit the science of radiological protection. The ICRP provides recommendations and guidance on protection against the risks associated with ionising radiation, from artificial sources as widely used in medicine, general industry and nuclear enterprises, and from naturally occurring sources. These reports and recommendations are published six times each year on behalf of the ICRP as the journal Annals of the ICRP. Each issue provides in-depth coverage of a specific subject area.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信