{"title":"在考虑成本和患者招募率的情况下计划临床试验","authors":"M.A.A Moussa","doi":"10.1016/0010-468X(84)90049-7","DOIUrl":null,"url":null,"abstract":"<div><p>This paper deals with: (1) estimation of the optimum clinical trial size minimizing the total cost, given types I and II errors, α, β and response rate difference, δ: (2) studying the test performance by calculating the operating characteristic curve in case of available fixed total cost, (3) mapping the future course of the patient recruitment plan by estimating recruitment rate and final intake based on enrollment to date, (4) projecting the recruitment duration and probability of achieving the contracted goal in case the recruitment rate is well established.</p></div>","PeriodicalId":75731,"journal":{"name":"Computer programs in biomedicine","volume":"18 3","pages":"Pages 173-179"},"PeriodicalIF":0.0000,"publicationDate":"1984-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0010-468X(84)90049-7","citationCount":"18","resultStr":"{\"title\":\"Planning a clinical trial with allowance for cost and patient recruitment rate\",\"authors\":\"M.A.A Moussa\",\"doi\":\"10.1016/0010-468X(84)90049-7\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>This paper deals with: (1) estimation of the optimum clinical trial size minimizing the total cost, given types I and II errors, α, β and response rate difference, δ: (2) studying the test performance by calculating the operating characteristic curve in case of available fixed total cost, (3) mapping the future course of the patient recruitment plan by estimating recruitment rate and final intake based on enrollment to date, (4) projecting the recruitment duration and probability of achieving the contracted goal in case the recruitment rate is well established.</p></div>\",\"PeriodicalId\":75731,\"journal\":{\"name\":\"Computer programs in biomedicine\",\"volume\":\"18 3\",\"pages\":\"Pages 173-179\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1984-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0010-468X(84)90049-7\",\"citationCount\":\"18\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Computer programs in biomedicine\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0010468X84900497\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Computer programs in biomedicine","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0010468X84900497","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Planning a clinical trial with allowance for cost and patient recruitment rate
This paper deals with: (1) estimation of the optimum clinical trial size minimizing the total cost, given types I and II errors, α, β and response rate difference, δ: (2) studying the test performance by calculating the operating characteristic curve in case of available fixed total cost, (3) mapping the future course of the patient recruitment plan by estimating recruitment rate and final intake based on enrollment to date, (4) projecting the recruitment duration and probability of achieving the contracted goal in case the recruitment rate is well established.