{"title":"100kwp并网太阳能电站性能评价","authors":"Mudasir Ali, Kalay Khan, Bilal Ahmad Shera, Mohammad Omer Ullah Shah, Obaid A Bhat, Hilaas Ahmad Peerzada, Samreen Khan, Rishi Richa","doi":"10.52151/jae2025623.1944","DOIUrl":null,"url":null,"abstract":"Grid-connected solar photovoltaic (PV) systems have emerged as a feasible and scalable renewable energy source for rural and urban electrification. Performance analysis of such systems is crucial for refining the design, improving operational efficiency, and preparing maintenance strategies. In 2020, a 100 kWp ground-mounted solar PV power plant was installed at Sher-e-Kashmir University of Agricultural Sciences and Technology of Kashmir (SKUAST-K), Shalimar (Jammu & Kashmir), a location characterized by an average daily solar radiation of 3.96 kWh m⁻² and an annual mean ambient temperature of approximately 5°C. The system was configured with fixed tilt angle of 30° and azimuth of 210°. This study evaluates the system design and annual operational performance of the installed solar power plant. Simulation using PVsyst software predicted yield of 3.23 kWh kWp⁻¹ day⁻¹ and annual energy generation of 117.4 MWh with performance ratio (PR) of 65.5%. However, SCADA-based monitoring revealed actual generation of only 37 MWh with a PR of 20%, indicating considerable under-performance. Detailed analysis identified poor site selection as a major constraint, with shading losses of 22.98% due to surrounding trees and structures. Electrical mismatch losses of approximately 3% were also observed, which could be mitigated through deployment of PV modules integrated with additional bypass diodes. Furthermore, the current azimuthal orientation (210°) was found to be suboptimal; aligning the modules due south (azimuth 180°) would improve solar incidence and energy capture. Other factors contributing to the performance gap included frequent grid outages, inadequate preventive maintenance, and significant soiling losses. To enhance performance, remedial measures such as automated cleaning systems, azimuth and tilt optimization, improved site selection, and incorporation of hybrid storage systems are suggested. The findings highlight the importance of comprehensive site assessment, optimal orientation, and appropriate component configuration for maximizing the efficiency of grid-connected solar PV systems in temperate agroclimatic zones of Jammu and Kashmir.","PeriodicalId":180812,"journal":{"name":"Journal of Agricultural Engineering (India)","volume":"62 3","pages":""},"PeriodicalIF":0.9000,"publicationDate":"2025-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Performance Evaluation of 100 kWp Grid Connected Solar Power Plant\",\"authors\":\"Mudasir Ali, Kalay Khan, Bilal Ahmad Shera, Mohammad Omer Ullah Shah, Obaid A Bhat, Hilaas Ahmad Peerzada, Samreen Khan, Rishi Richa\",\"doi\":\"10.52151/jae2025623.1944\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Grid-connected solar photovoltaic (PV) systems have emerged as a feasible and scalable renewable energy source for rural and urban electrification. Performance analysis of such systems is crucial for refining the design, improving operational efficiency, and preparing maintenance strategies. In 2020, a 100 kWp ground-mounted solar PV power plant was installed at Sher-e-Kashmir University of Agricultural Sciences and Technology of Kashmir (SKUAST-K), Shalimar (Jammu & Kashmir), a location characterized by an average daily solar radiation of 3.96 kWh m⁻² and an annual mean ambient temperature of approximately 5°C. The system was configured with fixed tilt angle of 30° and azimuth of 210°. This study evaluates the system design and annual operational performance of the installed solar power plant. Simulation using PVsyst software predicted yield of 3.23 kWh kWp⁻¹ day⁻¹ and annual energy generation of 117.4 MWh with performance ratio (PR) of 65.5%. However, SCADA-based monitoring revealed actual generation of only 37 MWh with a PR of 20%, indicating considerable under-performance. Detailed analysis identified poor site selection as a major constraint, with shading losses of 22.98% due to surrounding trees and structures. Electrical mismatch losses of approximately 3% were also observed, which could be mitigated through deployment of PV modules integrated with additional bypass diodes. Furthermore, the current azimuthal orientation (210°) was found to be suboptimal; aligning the modules due south (azimuth 180°) would improve solar incidence and energy capture. Other factors contributing to the performance gap included frequent grid outages, inadequate preventive maintenance, and significant soiling losses. To enhance performance, remedial measures such as automated cleaning systems, azimuth and tilt optimization, improved site selection, and incorporation of hybrid storage systems are suggested. The findings highlight the importance of comprehensive site assessment, optimal orientation, and appropriate component configuration for maximizing the efficiency of grid-connected solar PV systems in temperate agroclimatic zones of Jammu and Kashmir.\",\"PeriodicalId\":180812,\"journal\":{\"name\":\"Journal of Agricultural Engineering (India)\",\"volume\":\"62 3\",\"pages\":\"\"},\"PeriodicalIF\":0.9000,\"publicationDate\":\"2025-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Agricultural Engineering (India)\",\"FirstCategoryId\":\"0\",\"ListUrlMain\":\"https://doi.org/10.52151/jae2025623.1944\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Agricultural Engineering (India)","FirstCategoryId":"0","ListUrlMain":"https://doi.org/10.52151/jae2025623.1944","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

并网太阳能光伏(PV)系统已成为农村和城市电气化的可行和可扩展的可再生能源。这类系统的性能分析对于改进设计、提高操作效率和准备维护策略至关重要。2020年,在Shalimar(查谟和克什米尔)的Sher-e-Kashmir农业科技大学(skuust - k)安装了一个100千瓦时的地面太阳能光伏电站,该地区的日平均太阳辐射为3.96千瓦时(⁻²),年平均环境温度约为5°C。系统的固定倾角为30°,方位角为210°。本研究对已安装太阳能发电厂的系统设计和年度运行性能进行评估。使用PVsyst软件进行模拟,预测产量为3.23 kWh (kWp - 1天),年发电量为117.4 MWh,性能比(PR)为65.5%。然而,基于scada的监测显示,实际发电量仅为37兆瓦时,PR为20%,表明性能相当不佳。详细分析表明,选址不当是主要制约因素,由于周围的树木和结构,遮阳损失了22.98%。此外,还观察到约3%的电失配损失,这可以通过部署集成了额外旁路二极管的光伏组件来减轻。此外,目前的方位角(210°)是次优的;将模块对准正南(方位角180°)将改善太阳入射和能量捕获。造成性能差距的其他因素包括频繁的电网中断、不充分的预防性维护和严重的污染损失。为了提高性能,建议采取补救措施,如自动清洁系统,方位和倾斜优化,改进选址,并结合混合存储系统。研究结果强调了在查谟和克什米尔温带农业气候带,全面的选址评估、最佳的朝向和适当的组件配置对于最大限度地提高并网太阳能光伏系统的效率的重要性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Performance Evaluation of 100 kWp Grid Connected Solar Power Plant
Grid-connected solar photovoltaic (PV) systems have emerged as a feasible and scalable renewable energy source for rural and urban electrification. Performance analysis of such systems is crucial for refining the design, improving operational efficiency, and preparing maintenance strategies. In 2020, a 100 kWp ground-mounted solar PV power plant was installed at Sher-e-Kashmir University of Agricultural Sciences and Technology of Kashmir (SKUAST-K), Shalimar (Jammu & Kashmir), a location characterized by an average daily solar radiation of 3.96 kWh m⁻² and an annual mean ambient temperature of approximately 5°C. The system was configured with fixed tilt angle of 30° and azimuth of 210°. This study evaluates the system design and annual operational performance of the installed solar power plant. Simulation using PVsyst software predicted yield of 3.23 kWh kWp⁻¹ day⁻¹ and annual energy generation of 117.4 MWh with performance ratio (PR) of 65.5%. However, SCADA-based monitoring revealed actual generation of only 37 MWh with a PR of 20%, indicating considerable under-performance. Detailed analysis identified poor site selection as a major constraint, with shading losses of 22.98% due to surrounding trees and structures. Electrical mismatch losses of approximately 3% were also observed, which could be mitigated through deployment of PV modules integrated with additional bypass diodes. Furthermore, the current azimuthal orientation (210°) was found to be suboptimal; aligning the modules due south (azimuth 180°) would improve solar incidence and energy capture. Other factors contributing to the performance gap included frequent grid outages, inadequate preventive maintenance, and significant soiling losses. To enhance performance, remedial measures such as automated cleaning systems, azimuth and tilt optimization, improved site selection, and incorporation of hybrid storage systems are suggested. The findings highlight the importance of comprehensive site assessment, optimal orientation, and appropriate component configuration for maximizing the efficiency of grid-connected solar PV systems in temperate agroclimatic zones of Jammu and Kashmir.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书