SuperKEKB高能环中与注入相关的光束损耗

IF 1.5 3区 物理与天体物理 Q3 INSTRUMENTS & INSTRUMENTATION
Meng Li , Philip Bambade , Dou Wang , Naoko Iida , Yoshihiro Funakoshi , Hiroshi Kaji , Yukiyoshi Ohnishi , Taichiro Koga , Jie Gao , Urbschat Bela , Hiroyuki Nakayama , Andrii Natochii , Haruyo Koiso , Kazuhito Ohmi , Kenta Uno , Qingyuan Liu
{"title":"SuperKEKB高能环中与注入相关的光束损耗","authors":"Meng Li ,&nbsp;Philip Bambade ,&nbsp;Dou Wang ,&nbsp;Naoko Iida ,&nbsp;Yoshihiro Funakoshi ,&nbsp;Hiroshi Kaji ,&nbsp;Yukiyoshi Ohnishi ,&nbsp;Taichiro Koga ,&nbsp;Jie Gao ,&nbsp;Urbschat Bela ,&nbsp;Hiroyuki Nakayama ,&nbsp;Andrii Natochii ,&nbsp;Haruyo Koiso ,&nbsp;Kazuhito Ohmi ,&nbsp;Kenta Uno ,&nbsp;Qingyuan Liu","doi":"10.1016/j.nima.2026.171362","DOIUrl":null,"url":null,"abstract":"<div><div>At SuperKEKB, the maximum achievable beam currents and the luminosity are projected to be constrained by beam injection in the near future. Recent attempts to squeeze the vertical beta function at the IP or increase beam currents have not yielded the expected improvements in luminosity, with poor injection performance in both rings being a major factor. The injection efficiencies are lower than half of the required value and large background signals are observed in the Belle II detector and other beam loss monitors. To avoid a sudden increase in background caused by injection, the Belle II trigger system is vetoed for several tens of milliseconds just after beam injection, leading to significant dead time. These injection issues are expected to become even more severe as luminosity increases, making beam injection one of the major bottleneck to achieving the target luminosity. To investigate and address these issues, detailed injection simulations for the high-energy ring (HER) were performed and compared with dedicated experimental measurements, providing valuable insights into injection-related beam loss mechanisms and offering practical strategies to improve injection efficiency while mitigating injection-induced backgrounds. This paper presents these findings together with their experimental validation.</div></div>","PeriodicalId":19359,"journal":{"name":"Nuclear Instruments & Methods in Physics Research Section A-accelerators Spectrometers Detectors and Associated Equipment","volume":"1086 ","pages":"Article 171362"},"PeriodicalIF":1.5000,"publicationDate":"2026-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Injection-related beam loss in the high-energy ring of SuperKEKB\",\"authors\":\"Meng Li ,&nbsp;Philip Bambade ,&nbsp;Dou Wang ,&nbsp;Naoko Iida ,&nbsp;Yoshihiro Funakoshi ,&nbsp;Hiroshi Kaji ,&nbsp;Yukiyoshi Ohnishi ,&nbsp;Taichiro Koga ,&nbsp;Jie Gao ,&nbsp;Urbschat Bela ,&nbsp;Hiroyuki Nakayama ,&nbsp;Andrii Natochii ,&nbsp;Haruyo Koiso ,&nbsp;Kazuhito Ohmi ,&nbsp;Kenta Uno ,&nbsp;Qingyuan Liu\",\"doi\":\"10.1016/j.nima.2026.171362\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>At SuperKEKB, the maximum achievable beam currents and the luminosity are projected to be constrained by beam injection in the near future. Recent attempts to squeeze the vertical beta function at the IP or increase beam currents have not yielded the expected improvements in luminosity, with poor injection performance in both rings being a major factor. The injection efficiencies are lower than half of the required value and large background signals are observed in the Belle II detector and other beam loss monitors. To avoid a sudden increase in background caused by injection, the Belle II trigger system is vetoed for several tens of milliseconds just after beam injection, leading to significant dead time. These injection issues are expected to become even more severe as luminosity increases, making beam injection one of the major bottleneck to achieving the target luminosity. To investigate and address these issues, detailed injection simulations for the high-energy ring (HER) were performed and compared with dedicated experimental measurements, providing valuable insights into injection-related beam loss mechanisms and offering practical strategies to improve injection efficiency while mitigating injection-induced backgrounds. This paper presents these findings together with their experimental validation.</div></div>\",\"PeriodicalId\":19359,\"journal\":{\"name\":\"Nuclear Instruments & Methods in Physics Research Section A-accelerators Spectrometers Detectors and Associated Equipment\",\"volume\":\"1086 \",\"pages\":\"Article 171362\"},\"PeriodicalIF\":1.5000,\"publicationDate\":\"2026-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Nuclear Instruments & Methods in Physics Research Section A-accelerators Spectrometers Detectors and Associated Equipment\",\"FirstCategoryId\":\"101\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0168900226000884\",\"RegionNum\":3,\"RegionCategory\":\"物理与天体物理\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"2026/2/3 0:00:00\",\"PubModel\":\"Epub\",\"JCR\":\"Q3\",\"JCRName\":\"INSTRUMENTS & INSTRUMENTATION\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nuclear Instruments & Methods in Physics Research Section A-accelerators Spectrometers Detectors and Associated Equipment","FirstCategoryId":"101","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0168900226000884","RegionNum":3,"RegionCategory":"物理与天体物理","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2026/2/3 0:00:00","PubModel":"Epub","JCR":"Q3","JCRName":"INSTRUMENTS & INSTRUMENTATION","Score":null,"Total":0}
引用次数: 0

摘要

在SuperKEKB,预计在不久的将来,可实现的最大光束电流和光度将受到光束注入的限制。最近尝试挤压IP处的垂直beta函数或增加光束电流并没有产生预期的亮度改善,两个环的注入性能都不佳是主要因素。注入效率低于所需值的一半,并且在Belle II探测器和其他光束损耗监测仪中观察到大的背景信号。为了避免因注入引起的背景突然增加,Belle II触发系统在光束注入后的几十毫秒内被否决,导致大量的死区时间。随着亮度的增加,这些注入问题预计会变得更加严重,使光束注入成为实现目标亮度的主要瓶颈之一。为了研究和解决这些问题,对高能环(HER)进行了详细的注入模拟,并与专门的实验测量结果进行了比较,为注入相关的光束损失机制提供了有价值的见解,并提供了提高注入效率的实用策略,同时减轻了注入引起的背景。本文介绍了这些发现及其实验验证。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Injection-related beam loss in the high-energy ring of SuperKEKB
At SuperKEKB, the maximum achievable beam currents and the luminosity are projected to be constrained by beam injection in the near future. Recent attempts to squeeze the vertical beta function at the IP or increase beam currents have not yielded the expected improvements in luminosity, with poor injection performance in both rings being a major factor. The injection efficiencies are lower than half of the required value and large background signals are observed in the Belle II detector and other beam loss monitors. To avoid a sudden increase in background caused by injection, the Belle II trigger system is vetoed for several tens of milliseconds just after beam injection, leading to significant dead time. These injection issues are expected to become even more severe as luminosity increases, making beam injection one of the major bottleneck to achieving the target luminosity. To investigate and address these issues, detailed injection simulations for the high-energy ring (HER) were performed and compared with dedicated experimental measurements, providing valuable insights into injection-related beam loss mechanisms and offering practical strategies to improve injection efficiency while mitigating injection-induced backgrounds. This paper presents these findings together with their experimental validation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.20
自引率
21.40%
发文量
787
审稿时长
1 months
期刊介绍: Section A of Nuclear Instruments and Methods in Physics Research publishes papers on design, manufacturing and performance of scientific instruments with an emphasis on large scale facilities. This includes the development of particle accelerators, ion sources, beam transport systems and target arrangements as well as the use of secondary phenomena such as synchrotron radiation and free electron lasers. It also includes all types of instrumentation for the detection and spectrometry of radiations from high energy processes and nuclear decays, as well as instrumentation for experiments at nuclear reactors. Specialized electronics for nuclear and other types of spectrometry as well as computerization of measurements and control systems in this area also find their place in the A section. Theoretical as well as experimental papers are accepted.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书