Meng Li , Philip Bambade , Dou Wang , Naoko Iida , Yoshihiro Funakoshi , Hiroshi Kaji , Yukiyoshi Ohnishi , Taichiro Koga , Jie Gao , Urbschat Bela , Hiroyuki Nakayama , Andrii Natochii , Haruyo Koiso , Kazuhito Ohmi , Kenta Uno , Qingyuan Liu
{"title":"SuperKEKB高能环中与注入相关的光束损耗","authors":"Meng Li , Philip Bambade , Dou Wang , Naoko Iida , Yoshihiro Funakoshi , Hiroshi Kaji , Yukiyoshi Ohnishi , Taichiro Koga , Jie Gao , Urbschat Bela , Hiroyuki Nakayama , Andrii Natochii , Haruyo Koiso , Kazuhito Ohmi , Kenta Uno , Qingyuan Liu","doi":"10.1016/j.nima.2026.171362","DOIUrl":null,"url":null,"abstract":"<div><div>At SuperKEKB, the maximum achievable beam currents and the luminosity are projected to be constrained by beam injection in the near future. Recent attempts to squeeze the vertical beta function at the IP or increase beam currents have not yielded the expected improvements in luminosity, with poor injection performance in both rings being a major factor. The injection efficiencies are lower than half of the required value and large background signals are observed in the Belle II detector and other beam loss monitors. To avoid a sudden increase in background caused by injection, the Belle II trigger system is vetoed for several tens of milliseconds just after beam injection, leading to significant dead time. These injection issues are expected to become even more severe as luminosity increases, making beam injection one of the major bottleneck to achieving the target luminosity. To investigate and address these issues, detailed injection simulations for the high-energy ring (HER) were performed and compared with dedicated experimental measurements, providing valuable insights into injection-related beam loss mechanisms and offering practical strategies to improve injection efficiency while mitigating injection-induced backgrounds. This paper presents these findings together with their experimental validation.</div></div>","PeriodicalId":19359,"journal":{"name":"Nuclear Instruments & Methods in Physics Research Section A-accelerators Spectrometers Detectors and Associated Equipment","volume":"1086 ","pages":"Article 171362"},"PeriodicalIF":1.5000,"publicationDate":"2026-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Injection-related beam loss in the high-energy ring of SuperKEKB\",\"authors\":\"Meng Li , Philip Bambade , Dou Wang , Naoko Iida , Yoshihiro Funakoshi , Hiroshi Kaji , Yukiyoshi Ohnishi , Taichiro Koga , Jie Gao , Urbschat Bela , Hiroyuki Nakayama , Andrii Natochii , Haruyo Koiso , Kazuhito Ohmi , Kenta Uno , Qingyuan Liu\",\"doi\":\"10.1016/j.nima.2026.171362\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>At SuperKEKB, the maximum achievable beam currents and the luminosity are projected to be constrained by beam injection in the near future. Recent attempts to squeeze the vertical beta function at the IP or increase beam currents have not yielded the expected improvements in luminosity, with poor injection performance in both rings being a major factor. The injection efficiencies are lower than half of the required value and large background signals are observed in the Belle II detector and other beam loss monitors. To avoid a sudden increase in background caused by injection, the Belle II trigger system is vetoed for several tens of milliseconds just after beam injection, leading to significant dead time. These injection issues are expected to become even more severe as luminosity increases, making beam injection one of the major bottleneck to achieving the target luminosity. To investigate and address these issues, detailed injection simulations for the high-energy ring (HER) were performed and compared with dedicated experimental measurements, providing valuable insights into injection-related beam loss mechanisms and offering practical strategies to improve injection efficiency while mitigating injection-induced backgrounds. This paper presents these findings together with their experimental validation.</div></div>\",\"PeriodicalId\":19359,\"journal\":{\"name\":\"Nuclear Instruments & Methods in Physics Research Section A-accelerators Spectrometers Detectors and Associated Equipment\",\"volume\":\"1086 \",\"pages\":\"Article 171362\"},\"PeriodicalIF\":1.5000,\"publicationDate\":\"2026-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Nuclear Instruments & Methods in Physics Research Section A-accelerators Spectrometers Detectors and Associated Equipment\",\"FirstCategoryId\":\"101\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0168900226000884\",\"RegionNum\":3,\"RegionCategory\":\"物理与天体物理\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"2026/2/3 0:00:00\",\"PubModel\":\"Epub\",\"JCR\":\"Q3\",\"JCRName\":\"INSTRUMENTS & INSTRUMENTATION\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nuclear Instruments & Methods in Physics Research Section A-accelerators Spectrometers Detectors and Associated Equipment","FirstCategoryId":"101","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0168900226000884","RegionNum":3,"RegionCategory":"物理与天体物理","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2026/2/3 0:00:00","PubModel":"Epub","JCR":"Q3","JCRName":"INSTRUMENTS & INSTRUMENTATION","Score":null,"Total":0}
Injection-related beam loss in the high-energy ring of SuperKEKB
At SuperKEKB, the maximum achievable beam currents and the luminosity are projected to be constrained by beam injection in the near future. Recent attempts to squeeze the vertical beta function at the IP or increase beam currents have not yielded the expected improvements in luminosity, with poor injection performance in both rings being a major factor. The injection efficiencies are lower than half of the required value and large background signals are observed in the Belle II detector and other beam loss monitors. To avoid a sudden increase in background caused by injection, the Belle II trigger system is vetoed for several tens of milliseconds just after beam injection, leading to significant dead time. These injection issues are expected to become even more severe as luminosity increases, making beam injection one of the major bottleneck to achieving the target luminosity. To investigate and address these issues, detailed injection simulations for the high-energy ring (HER) were performed and compared with dedicated experimental measurements, providing valuable insights into injection-related beam loss mechanisms and offering practical strategies to improve injection efficiency while mitigating injection-induced backgrounds. This paper presents these findings together with their experimental validation.
期刊介绍:
Section A of Nuclear Instruments and Methods in Physics Research publishes papers on design, manufacturing and performance of scientific instruments with an emphasis on large scale facilities. This includes the development of particle accelerators, ion sources, beam transport systems and target arrangements as well as the use of secondary phenomena such as synchrotron radiation and free electron lasers. It also includes all types of instrumentation for the detection and spectrometry of radiations from high energy processes and nuclear decays, as well as instrumentation for experiments at nuclear reactors. Specialized electronics for nuclear and other types of spectrometry as well as computerization of measurements and control systems in this area also find their place in the A section.
Theoretical as well as experimental papers are accepted.