{"title":"ITA-AITES -隧道工程中的BIM -机械隧道和常规隧道指南","authors":"Wolfgang Angerer , Vojtěch Ernst Gall , Jurij Karlovšek , Wojciech Mleczko , Florent Robert , Jyrki Salmi , Wolfgang Aldrian , Philipp Dohmen , Jacob Grasmick , Anne Jacobs , Jelena Ninic , Michel Rives , Zehao Ye","doi":"10.1016/j.tust.2025.106714","DOIUrl":null,"url":null,"abstract":"<div><div>This guideline has been initiated by the International Tunnelling Association (ITA) Working Group (WG) 22 to support BIM implementation in the tunnelling industry. It provides recommendations which are to be adapted according to the availability of corresponding best practice experiences for all Project parties in order to support the adoption of BIM within a tunnelling Project.</div><div>This guideline is intended to be used by all engineers and owners to provide a reference framework for the implementation of BIM for tunnel Projects. It focuses on the implementation of BIM for segmentally lined mechanically bored tunnels and conventional tunnels. This guideline primarily covers the implementation of heavy civil elements for a tunnel Project. For more general information concerning BIM and its use in underground construction, the reader is referred to more general guidelines such as The German Tunnelling Committee’s (DAUB’s) “Building and Operation of Underground Structures – BIM in Tunnelling” or similar documents as provided in Section 16.</div><div>Specific recommendations concerning the modelling of non-civil works, e.g., mechanical, electrical, automation, or control systems, or Project-specific internal structures, e.g., concrete infills, plenum walls, duct-banks, smoke ducts, etc. are not provided.</div><div>This guideline is not intended to contest Employer’s Information Requirements or local best practise. It is only intended to alleviate ambiguity that may exist due to general definitions in the Employer’s Information Requirements or provide reference to owners for the development of their Requirements.</div><div>It is expected that the BIM’s capabilities will continue to expand as new BIM technology is developed. This version of this guideline is, however, based on a review of current international practise of BIM in tunnelling. As such, this document is subject to updates in consequent versions.</div></div>","PeriodicalId":49414,"journal":{"name":"Tunnelling and Underground Space Technology","volume":"168 ","pages":"Article 106714"},"PeriodicalIF":7.4000,"publicationDate":"2025-10-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ITA-AITES − BIM in tunnelling – Guideline for mechanised and conventional tunnels\",\"authors\":\"Wolfgang Angerer , Vojtěch Ernst Gall , Jurij Karlovšek , Wojciech Mleczko , Florent Robert , Jyrki Salmi , Wolfgang Aldrian , Philipp Dohmen , Jacob Grasmick , Anne Jacobs , Jelena Ninic , Michel Rives , Zehao Ye\",\"doi\":\"10.1016/j.tust.2025.106714\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>This guideline has been initiated by the International Tunnelling Association (ITA) Working Group (WG) 22 to support BIM implementation in the tunnelling industry. It provides recommendations which are to be adapted according to the availability of corresponding best practice experiences for all Project parties in order to support the adoption of BIM within a tunnelling Project.</div><div>This guideline is intended to be used by all engineers and owners to provide a reference framework for the implementation of BIM for tunnel Projects. It focuses on the implementation of BIM for segmentally lined mechanically bored tunnels and conventional tunnels. This guideline primarily covers the implementation of heavy civil elements for a tunnel Project. For more general information concerning BIM and its use in underground construction, the reader is referred to more general guidelines such as The German Tunnelling Committee’s (DAUB’s) “Building and Operation of Underground Structures – BIM in Tunnelling” or similar documents as provided in Section 16.</div><div>Specific recommendations concerning the modelling of non-civil works, e.g., mechanical, electrical, automation, or control systems, or Project-specific internal structures, e.g., concrete infills, plenum walls, duct-banks, smoke ducts, etc. are not provided.</div><div>This guideline is not intended to contest Employer’s Information Requirements or local best practise. It is only intended to alleviate ambiguity that may exist due to general definitions in the Employer’s Information Requirements or provide reference to owners for the development of their Requirements.</div><div>It is expected that the BIM’s capabilities will continue to expand as new BIM technology is developed. This version of this guideline is, however, based on a review of current international practise of BIM in tunnelling. As such, this document is subject to updates in consequent versions.</div></div>\",\"PeriodicalId\":49414,\"journal\":{\"name\":\"Tunnelling and Underground Space Technology\",\"volume\":\"168 \",\"pages\":\"Article 106714\"},\"PeriodicalIF\":7.4000,\"publicationDate\":\"2025-10-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Tunnelling and Underground Space Technology\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0886779825003529\",\"RegionNum\":1,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Tunnelling and Underground Space Technology","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0886779825003529","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
ITA-AITES − BIM in tunnelling – Guideline for mechanised and conventional tunnels
This guideline has been initiated by the International Tunnelling Association (ITA) Working Group (WG) 22 to support BIM implementation in the tunnelling industry. It provides recommendations which are to be adapted according to the availability of corresponding best practice experiences for all Project parties in order to support the adoption of BIM within a tunnelling Project.
This guideline is intended to be used by all engineers and owners to provide a reference framework for the implementation of BIM for tunnel Projects. It focuses on the implementation of BIM for segmentally lined mechanically bored tunnels and conventional tunnels. This guideline primarily covers the implementation of heavy civil elements for a tunnel Project. For more general information concerning BIM and its use in underground construction, the reader is referred to more general guidelines such as The German Tunnelling Committee’s (DAUB’s) “Building and Operation of Underground Structures – BIM in Tunnelling” or similar documents as provided in Section 16.
Specific recommendations concerning the modelling of non-civil works, e.g., mechanical, electrical, automation, or control systems, or Project-specific internal structures, e.g., concrete infills, plenum walls, duct-banks, smoke ducts, etc. are not provided.
This guideline is not intended to contest Employer’s Information Requirements or local best practise. It is only intended to alleviate ambiguity that may exist due to general definitions in the Employer’s Information Requirements or provide reference to owners for the development of their Requirements.
It is expected that the BIM’s capabilities will continue to expand as new BIM technology is developed. This version of this guideline is, however, based on a review of current international practise of BIM in tunnelling. As such, this document is subject to updates in consequent versions.
期刊介绍:
Tunnelling and Underground Space Technology is an international journal which publishes authoritative articles encompassing the development of innovative uses of underground space and the results of high quality research into improved, more cost-effective techniques for the planning, geo-investigation, design, construction, operation and maintenance of underground and earth-sheltered structures. The journal provides an effective vehicle for the improved worldwide exchange of information on developments in underground technology - and the experience gained from its use - and is strongly committed to publishing papers on the interdisciplinary aspects of creating, planning, and regulating underground space.