{"title":"新特罗伊茨克铬化合物厂球磨机传动的改造","authors":"A. V. Nefedov,&nbsp;R. E. Ishmukhametov,&nbsp;N. A. Chichenev,&nbsp;I. I. Basyrov,&nbsp;Y. O. Lyubchenko,&nbsp;E. E. Balakhnina","doi":"10.1007/s11015-025-01976-7","DOIUrl":null,"url":null,"abstract":"<div><p>The Novotroitsk Plant of Chromium Compounds specializes in the processing of chromite and dolomite ores, which are delivered to the first workshop of the grinding department, where they are crushed and ground in a ball mill. Operational experience has shown that the failure of the ball mill installed in this workshop leads to unplanned downtime due to failure of drive components, which accounts for 11.3% of the nominal operating time of the workshop. In order to increase the reliability of the technological equipment, it is proposed to replace the existing electric drive, which includes an obsolete 4A series electric motor and a special reducer, with a modern R167DV280V4/BVG122 motor-reducer, which transmits the rotation to the mill drum through a gear coupling. The development of the new drive has simplified its design and reduced the labor intensity of maintenance and repair. This technical solution increases the operating time between repairs, thus reducing operating costs. Calculations show that the implementation of the project solutions will lead to a 0.02% reduction in the cost of processing 1 ton of ore, a 1.37% increase in production profitability, and a 1.29% increase in sales profit. The additional investment does not exceed 3.4 million rubles and will be recovered in less than 3 months.</p></div>","PeriodicalId":702,"journal":{"name":"Metallurgist","volume":"69 4","pages":"586 - 591"},"PeriodicalIF":0.8000,"publicationDate":"2025-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Reengineering of the ball mill drive at the Novotroitsk Plant of Chromium Compounds\",\"authors\":\"A. V. Nefedov,&nbsp;R. E. Ishmukhametov,&nbsp;N. A. Chichenev,&nbsp;I. I. Basyrov,&nbsp;Y. O. Lyubchenko,&nbsp;E. E. Balakhnina\",\"doi\":\"10.1007/s11015-025-01976-7\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>The Novotroitsk Plant of Chromium Compounds specializes in the processing of chromite and dolomite ores, which are delivered to the first workshop of the grinding department, where they are crushed and ground in a ball mill. Operational experience has shown that the failure of the ball mill installed in this workshop leads to unplanned downtime due to failure of drive components, which accounts for 11.3% of the nominal operating time of the workshop. In order to increase the reliability of the technological equipment, it is proposed to replace the existing electric drive, which includes an obsolete 4A series electric motor and a special reducer, with a modern R167DV280V4/BVG122 motor-reducer, which transmits the rotation to the mill drum through a gear coupling. The development of the new drive has simplified its design and reduced the labor intensity of maintenance and repair. This technical solution increases the operating time between repairs, thus reducing operating costs. Calculations show that the implementation of the project solutions will lead to a 0.02% reduction in the cost of processing 1 ton of ore, a 1.37% increase in production profitability, and a 1.29% increase in sales profit. The additional investment does not exceed 3.4 million rubles and will be recovered in less than 3 months.</p></div>\",\"PeriodicalId\":702,\"journal\":{\"name\":\"Metallurgist\",\"volume\":\"69 4\",\"pages\":\"586 - 591\"},\"PeriodicalIF\":0.8000,\"publicationDate\":\"2025-07-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Metallurgist\",\"FirstCategoryId\":\"88\",\"ListUrlMain\":\"https://link.springer.com/article/10.1007/s11015-025-01976-7\",\"RegionNum\":4,\"RegionCategory\":\"材料科学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"METALLURGY & METALLURGICAL ENGINEERING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Metallurgist","FirstCategoryId":"88","ListUrlMain":"https://link.springer.com/article/10.1007/s11015-025-01976-7","RegionNum":4,"RegionCategory":"材料科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"METALLURGY & METALLURGICAL ENGINEERING","Score":null,"Total":0}
引用次数: 0

摘要

新特罗伊茨克铬化合物厂专门从事铬铁矿和白云石矿石的加工,这些矿石被运送到研磨部门的第一车间,在那里它们被粉碎并在球磨机中研磨。运行经验表明,本车间安装的球磨机出现故障后,由于驱动部件出现故障而导致计划外停机,占车间标称运行时间的11.3%。为了提高工艺设备的可靠性,建议将现有的由过时的4A系列电动机和专用减速器组成的电传动替换为现代化的R167DV280V4/BVG122电机减速器,通过齿轮联轴器将旋转传递给磨筒。新驱动器的开发简化了其设计,减少了维护和维修的劳动强度。该技术方案增加了维修之间的操作时间,从而降低了操作成本。计算表明,项目解决方案的实施将使1 吨矿石的加工成本降低0.02%,生产盈利能力提高1.37%,销售利润提高1.29%。额外投资不超过340万卢布,将在不到3个月的时间内收回。
本文章由计算机程序翻译,如有差异,请以英文原文为准。

Reengineering of the ball mill drive at the Novotroitsk Plant of Chromium Compounds

Reengineering of the ball mill drive at the Novotroitsk Plant of Chromium Compounds

The Novotroitsk Plant of Chromium Compounds specializes in the processing of chromite and dolomite ores, which are delivered to the first workshop of the grinding department, where they are crushed and ground in a ball mill. Operational experience has shown that the failure of the ball mill installed in this workshop leads to unplanned downtime due to failure of drive components, which accounts for 11.3% of the nominal operating time of the workshop. In order to increase the reliability of the technological equipment, it is proposed to replace the existing electric drive, which includes an obsolete 4A series electric motor and a special reducer, with a modern R167DV280V4/BVG122 motor-reducer, which transmits the rotation to the mill drum through a gear coupling. The development of the new drive has simplified its design and reduced the labor intensity of maintenance and repair. This technical solution increases the operating time between repairs, thus reducing operating costs. Calculations show that the implementation of the project solutions will lead to a 0.02% reduction in the cost of processing 1 ton of ore, a 1.37% increase in production profitability, and a 1.29% increase in sales profit. The additional investment does not exceed 3.4 million rubles and will be recovered in less than 3 months.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Metallurgist
Metallurgist 工程技术-冶金工程
CiteScore
1.50
自引率
44.40%
发文量
151
审稿时长
4-8 weeks
期刊介绍: Metallurgist is the leading Russian journal in metallurgy. Publication started in 1956. Basic topics covered include: State of the art and development of enterprises in ferrous and nonferrous metallurgy and mining; Metallurgy of ferrous, nonferrous, rare, and precious metals; Metallurgical equipment; Automation and control; Protection of labor; Protection of the environment; Resources and energy saving; Quality and certification; History of metallurgy; Inventions (patents).
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信