德黑兰-绍马勒高速公路第三段建设的比较生命周期评估(LCA):伊朗最大的道路建设项目

IF 3.7 Q2 ENVIRONMENTAL SCIENCES
Saeed Aghel, Mehdi Gholamalifard, Nader Bahramifar, Bonyad Ahmadi, Bita Roshanravan
{"title":"德黑兰-绍马勒高速公路第三段建设的比较生命周期评估(LCA):伊朗最大的道路建设项目","authors":"Saeed Aghel,&nbsp;Mehdi Gholamalifard,&nbsp;Nader Bahramifar,&nbsp;Bonyad Ahmadi,&nbsp;Bita Roshanravan","doi":"10.1016/j.clrc.2025.100294","DOIUrl":null,"url":null,"abstract":"<div><div>The construction of the Tehran-Shomal Freeway is a major infrastructural project in Iran aimed at enhancing connectivity between Tehran and northern regions. This study evaluates the environmental impacts associated with the construction of the third section of this freeway. Using Life Cycle Assessment (LCA), this study evaluates the construction of four distinct spatial pathways of varying lengths, focusing on key environmental impact categories at both the midpoint and endpoint levels. The research emphasizes the construction phase and contributes a method that can be used to develop and analyze construction phase life-cycle inventories. The normalized results indicate that Human Carcinogenic Toxicity is the most significant contributor to environmental impacts across all scenarios, with the Tunnel subproject identified as the dominant source, followed by bridge construction. Machine operation, Portland cement, and electricity emerge as the primary contributors to environmental impact within the tunnel construction process. Among the evaluated scenarios, the S3 scenario stands out as the most sustainable option, exhibiting the lowest overall environmental impact. It achieves a global warming potential of 1,062,439 tons of CO<sub>2</sub> equivalent and a final score of 35.5 MPt. These results emphasize the critical importance of adopting optimized construction strategies to reduce the environmental footprint of transportation infrastructure projects. However, selecting the most appropriate scenario should extend beyond LCA outcomes to include economic, social, and ecological considerations. This integrated approach is essential to achieving a balanced and holistic decision-making process that supports sustainable development objectives.</div></div>","PeriodicalId":34617,"journal":{"name":"Cleaner and Responsible Consumption","volume":"18 ","pages":"Article 100294"},"PeriodicalIF":3.7000,"publicationDate":"2025-06-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A comparative life cycle assessment (LCA) of the construction of the third section of the Tehran-Shomal freeway: Largest road construction project in Iran\",\"authors\":\"Saeed Aghel,&nbsp;Mehdi Gholamalifard,&nbsp;Nader Bahramifar,&nbsp;Bonyad Ahmadi,&nbsp;Bita Roshanravan\",\"doi\":\"10.1016/j.clrc.2025.100294\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>The construction of the Tehran-Shomal Freeway is a major infrastructural project in Iran aimed at enhancing connectivity between Tehran and northern regions. This study evaluates the environmental impacts associated with the construction of the third section of this freeway. Using Life Cycle Assessment (LCA), this study evaluates the construction of four distinct spatial pathways of varying lengths, focusing on key environmental impact categories at both the midpoint and endpoint levels. The research emphasizes the construction phase and contributes a method that can be used to develop and analyze construction phase life-cycle inventories. The normalized results indicate that Human Carcinogenic Toxicity is the most significant contributor to environmental impacts across all scenarios, with the Tunnel subproject identified as the dominant source, followed by bridge construction. Machine operation, Portland cement, and electricity emerge as the primary contributors to environmental impact within the tunnel construction process. Among the evaluated scenarios, the S3 scenario stands out as the most sustainable option, exhibiting the lowest overall environmental impact. It achieves a global warming potential of 1,062,439 tons of CO<sub>2</sub> equivalent and a final score of 35.5 MPt. These results emphasize the critical importance of adopting optimized construction strategies to reduce the environmental footprint of transportation infrastructure projects. However, selecting the most appropriate scenario should extend beyond LCA outcomes to include economic, social, and ecological considerations. This integrated approach is essential to achieving a balanced and holistic decision-making process that supports sustainable development objectives.</div></div>\",\"PeriodicalId\":34617,\"journal\":{\"name\":\"Cleaner and Responsible Consumption\",\"volume\":\"18 \",\"pages\":\"Article 100294\"},\"PeriodicalIF\":3.7000,\"publicationDate\":\"2025-06-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Cleaner and Responsible Consumption\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S2666784325000452\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENVIRONMENTAL SCIENCES\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Cleaner and Responsible Consumption","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2666784325000452","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENVIRONMENTAL SCIENCES","Score":null,"Total":0}
引用次数: 0

摘要

德黑兰-绍马勒高速公路建设是伊朗重大基础设施项目,旨在加强德黑兰与北部地区的互联互通。本研究评估了这条高速公路第三段建设对环境的影响。利用生命周期评价(LCA)方法,对四种不同长度空间路径的构建进行了评价,重点关注了中点和端点水平上的关键环境影响类别。该研究强调了施工阶段,并提供了一种可用于开发和分析施工阶段生命周期清单的方法。归一化结果表明,在所有情景中,人类致癌毒性是造成环境影响的最重要因素,隧道子项目被确定为主要来源,其次是桥梁建设。在隧道施工过程中,机器操作、波特兰水泥和电力成为对环境影响的主要贡献者。在评估的方案中,S3方案是最具可持续性的方案,显示出最低的总体环境影响。它实现了1062439吨二氧化碳当量的全球变暖潜能值和3550万吨当量的最终得分。这些结果强调了采用优化的建设策略以减少交通基础设施项目的环境足迹的重要性。然而,选择最合适的情景应超越LCA结果,包括经济、社会和生态方面的考虑。这种综合办法对于实现支持可持续发展目标的平衡和全面的决策进程至关重要。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A comparative life cycle assessment (LCA) of the construction of the third section of the Tehran-Shomal freeway: Largest road construction project in Iran
The construction of the Tehran-Shomal Freeway is a major infrastructural project in Iran aimed at enhancing connectivity between Tehran and northern regions. This study evaluates the environmental impacts associated with the construction of the third section of this freeway. Using Life Cycle Assessment (LCA), this study evaluates the construction of four distinct spatial pathways of varying lengths, focusing on key environmental impact categories at both the midpoint and endpoint levels. The research emphasizes the construction phase and contributes a method that can be used to develop and analyze construction phase life-cycle inventories. The normalized results indicate that Human Carcinogenic Toxicity is the most significant contributor to environmental impacts across all scenarios, with the Tunnel subproject identified as the dominant source, followed by bridge construction. Machine operation, Portland cement, and electricity emerge as the primary contributors to environmental impact within the tunnel construction process. Among the evaluated scenarios, the S3 scenario stands out as the most sustainable option, exhibiting the lowest overall environmental impact. It achieves a global warming potential of 1,062,439 tons of CO2 equivalent and a final score of 35.5 MPt. These results emphasize the critical importance of adopting optimized construction strategies to reduce the environmental footprint of transportation infrastructure projects. However, selecting the most appropriate scenario should extend beyond LCA outcomes to include economic, social, and ecological considerations. This integrated approach is essential to achieving a balanced and holistic decision-making process that supports sustainable development objectives.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Cleaner and Responsible Consumption
Cleaner and Responsible Consumption Social Sciences-Social Sciences (miscellaneous)
CiteScore
4.70
自引率
0.00%
发文量
40
审稿时长
99 days
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信