城郊城市化地区公共交通服务优化:以宁波市为例——从快速公交到城市轨道交通的演变

IF 5.4 2区 经济学 Q1 ECONOMICS
Erzhuo Zhang , Feng Lian , Zhongzhen Yang
{"title":"城郊城市化地区公共交通服务优化:以宁波市为例——从快速公交到城市轨道交通的演变","authors":"Erzhuo Zhang ,&nbsp;Feng Lian ,&nbsp;Zhongzhen Yang","doi":"10.1016/j.seps.2025.102258","DOIUrl":null,"url":null,"abstract":"<div><div>To optimize public transit (PT) service in suburban urbanized areas according to the dynamic changes in demand during suburban urbanization, and to enhance the input-output efficiency of the PT in post-urbanized areas while promoting suburban urbanization, a new mode of bus rapid transit (BRT) is proposed. The mode emphasizes multiple, high-frequency connections to urban rail transit (URT), based on the principle of long-term optimization. The planning horizon is divided into multiple successive decision sub-periods, and a bi-level model for suburban PT service is developed. The upper model determines the PT service (BRT or the URT) for each segment on the transport corridor during each sub-period with the objective of maximizing social welfare over the entire planning horizon. It also calculates the accessibility of traffic analysis zones (TAZs) and the benefits of the PT within each decision sub-period. The lower model determines the housing locations of the newly added urban population, zonal travel generation and modal splits, as well as passenger flows and travel times for the PT in decision sub-periods. Based on the determined PT service for a sub-period, decision-making shifts to the next sub-period. Through successive multi-period decision, a PT service scheme for post-urbanized areas is derived. A numerical analysis with Beilun District in Ningbo as an example demonstrates that adopting a scheme gradually upgrading from BRT to URT (namely BRT&amp;URT scheme) can achieve social welfare totaling 14.136 billion CNY, a 16.95 % increase compared to constructing URT from the initial stage. This validates that the BRT&amp;URT scheme for post-urbanized suburbs can enhance PT service during suburban urbanization while avoiding the high initial costs and poor input-output ratios of early URT investments.</div></div>","PeriodicalId":22033,"journal":{"name":"Socio-economic Planning Sciences","volume":"101 ","pages":"Article 102258"},"PeriodicalIF":5.4000,"publicationDate":"2025-06-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimizing public transit service in suburban urbanized areas: A case study of Ningbo, China - Evolution from bus rapid transit to urban rail transit\",\"authors\":\"Erzhuo Zhang ,&nbsp;Feng Lian ,&nbsp;Zhongzhen Yang\",\"doi\":\"10.1016/j.seps.2025.102258\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>To optimize public transit (PT) service in suburban urbanized areas according to the dynamic changes in demand during suburban urbanization, and to enhance the input-output efficiency of the PT in post-urbanized areas while promoting suburban urbanization, a new mode of bus rapid transit (BRT) is proposed. The mode emphasizes multiple, high-frequency connections to urban rail transit (URT), based on the principle of long-term optimization. The planning horizon is divided into multiple successive decision sub-periods, and a bi-level model for suburban PT service is developed. The upper model determines the PT service (BRT or the URT) for each segment on the transport corridor during each sub-period with the objective of maximizing social welfare over the entire planning horizon. It also calculates the accessibility of traffic analysis zones (TAZs) and the benefits of the PT within each decision sub-period. The lower model determines the housing locations of the newly added urban population, zonal travel generation and modal splits, as well as passenger flows and travel times for the PT in decision sub-periods. Based on the determined PT service for a sub-period, decision-making shifts to the next sub-period. Through successive multi-period decision, a PT service scheme for post-urbanized areas is derived. A numerical analysis with Beilun District in Ningbo as an example demonstrates that adopting a scheme gradually upgrading from BRT to URT (namely BRT&amp;URT scheme) can achieve social welfare totaling 14.136 billion CNY, a 16.95 % increase compared to constructing URT from the initial stage. This validates that the BRT&amp;URT scheme for post-urbanized suburbs can enhance PT service during suburban urbanization while avoiding the high initial costs and poor input-output ratios of early URT investments.</div></div>\",\"PeriodicalId\":22033,\"journal\":{\"name\":\"Socio-economic Planning Sciences\",\"volume\":\"101 \",\"pages\":\"Article 102258\"},\"PeriodicalIF\":5.4000,\"publicationDate\":\"2025-06-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Socio-economic Planning Sciences\",\"FirstCategoryId\":\"96\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0038012125001077\",\"RegionNum\":2,\"RegionCategory\":\"经济学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"ECONOMICS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Socio-economic Planning Sciences","FirstCategoryId":"96","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0038012125001077","RegionNum":2,"RegionCategory":"经济学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ECONOMICS","Score":null,"Total":0}
引用次数: 0

摘要

为了根据近郊城市化过程中需求的动态变化优化近郊城市化地区的公共交通服务,在推进近郊城市化的同时提高后城市化地区公共交通的投入产出效率,提出了一种新的快速公交(BRT)模式。该模式基于长期优化原则,强调与城市轨道交通(URT)的多个高频连接。将规划视域划分为多个连续决策子期,建立了城郊公共交通服务的双层模型。上层模型在每个子阶段确定交通走廊上每个路段的公共交通服务(BRT或URT),目标是在整个规划范围内最大化社会福利。计算了每个决策子周期内流量分析区域的可达性和PT的效益。下层模型在决策子周期中确定新增城市人口的住房位置、区域出行产生和模式划分,以及PT的客流量和出行时间。根据确定的一个子周期的PT服务,决策转移到下一个子周期。通过连续多期决策,推导出后城市化地区PT服务方案。以宁波市北仑区为例进行的数值分析表明,采用BRT向URT逐步升级的方案(即BRT&;URT方案)可实现社会福利总额141.36亿元,比初始阶段建设URT增加16.95%。这验证了后城市化郊区brt & &;URT方案可以提高郊区城市化过程中的PT服务,同时避免了早期URT投资的高初始成本和低投入产出比。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimizing public transit service in suburban urbanized areas: A case study of Ningbo, China - Evolution from bus rapid transit to urban rail transit
To optimize public transit (PT) service in suburban urbanized areas according to the dynamic changes in demand during suburban urbanization, and to enhance the input-output efficiency of the PT in post-urbanized areas while promoting suburban urbanization, a new mode of bus rapid transit (BRT) is proposed. The mode emphasizes multiple, high-frequency connections to urban rail transit (URT), based on the principle of long-term optimization. The planning horizon is divided into multiple successive decision sub-periods, and a bi-level model for suburban PT service is developed. The upper model determines the PT service (BRT or the URT) for each segment on the transport corridor during each sub-period with the objective of maximizing social welfare over the entire planning horizon. It also calculates the accessibility of traffic analysis zones (TAZs) and the benefits of the PT within each decision sub-period. The lower model determines the housing locations of the newly added urban population, zonal travel generation and modal splits, as well as passenger flows and travel times for the PT in decision sub-periods. Based on the determined PT service for a sub-period, decision-making shifts to the next sub-period. Through successive multi-period decision, a PT service scheme for post-urbanized areas is derived. A numerical analysis with Beilun District in Ningbo as an example demonstrates that adopting a scheme gradually upgrading from BRT to URT (namely BRT&URT scheme) can achieve social welfare totaling 14.136 billion CNY, a 16.95 % increase compared to constructing URT from the initial stage. This validates that the BRT&URT scheme for post-urbanized suburbs can enhance PT service during suburban urbanization while avoiding the high initial costs and poor input-output ratios of early URT investments.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Socio-economic Planning Sciences
Socio-economic Planning Sciences OPERATIONS RESEARCH & MANAGEMENT SCIENCE-
CiteScore
9.40
自引率
13.10%
发文量
294
审稿时长
58 days
期刊介绍: Studies directed toward the more effective utilization of existing resources, e.g. mathematical programming models of health care delivery systems with relevance to more effective program design; systems analysis of fire outbreaks and its relevance to the location of fire stations; statistical analysis of the efficiency of a developing country economy or industry. Studies relating to the interaction of various segments of society and technology, e.g. the effects of government health policies on the utilization and design of hospital facilities; the relationship between housing density and the demands on public transportation or other service facilities: patterns and implications of urban development and air or water pollution. Studies devoted to the anticipations of and response to future needs for social, health and other human services, e.g. the relationship between industrial growth and the development of educational resources in affected areas; investigation of future demands for material and child health resources in a developing country; design of effective recycling in an urban setting.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信