考虑时滞效应的级联水风光伏混合发电系统日前规划优化框架

IF 5 2区 工程技术 Q1 ENGINEERING, ELECTRICAL & ELECTRONIC
Zhiyuan Wu , Haizheng Wang , Guohua Fang , Jian Ye , David Z. Zhu , Xianfeng Huang
{"title":"考虑时滞效应的级联水风光伏混合发电系统日前规划优化框架","authors":"Zhiyuan Wu ,&nbsp;Haizheng Wang ,&nbsp;Guohua Fang ,&nbsp;Jian Ye ,&nbsp;David Z. Zhu ,&nbsp;Xianfeng Huang","doi":"10.1016/j.ijepes.2025.110800","DOIUrl":null,"url":null,"abstract":"<div><div>The time delay in cascade hydropower stations refers to the time required for water to travel from the upstream reservoir to the downstream reservoir. Although some studies consider time delays in hydro-wind-photovoltaic hybrid system models, comprehensive research on their impacts and mitigation strategies remains limited. These delays hinder the joint optimization of hydropower, wind, and photovoltaic resources, reducing system benefits and increasing operational risks. This phenomenon is referred to as the time delay effect. This study proposes a day-ahead planning optimization framework to mitigate the time delay effect and improve system benefits and reliability under multiple uncertainties. This framework incorporates joint and updated optimizations to address challenges posed by the time delay effect. A case study on the Yalong River Basin hydro-wind-photovoltaic system shows that the proposed framework enhances generation benefits by 2.79% over traditional methods and reduces the power shortage rate by 43.19%. Additional multi-objective scheduling experiments assess the framework’s risk control capabilities and the variations in scheduling across different schemes. Based on these analyses, an improvement strategy for this system is developed and validated to significantly reduce power shortage rates while minimizing revenue losses.</div></div>","PeriodicalId":50326,"journal":{"name":"International Journal of Electrical Power & Energy Systems","volume":"169 ","pages":"Article 110800"},"PeriodicalIF":5.0000,"publicationDate":"2025-06-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Day-ahead planning optimization framework for cascaded hydro-wind-photovoltaic hybrid systems considering time delay effects\",\"authors\":\"Zhiyuan Wu ,&nbsp;Haizheng Wang ,&nbsp;Guohua Fang ,&nbsp;Jian Ye ,&nbsp;David Z. Zhu ,&nbsp;Xianfeng Huang\",\"doi\":\"10.1016/j.ijepes.2025.110800\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>The time delay in cascade hydropower stations refers to the time required for water to travel from the upstream reservoir to the downstream reservoir. Although some studies consider time delays in hydro-wind-photovoltaic hybrid system models, comprehensive research on their impacts and mitigation strategies remains limited. These delays hinder the joint optimization of hydropower, wind, and photovoltaic resources, reducing system benefits and increasing operational risks. This phenomenon is referred to as the time delay effect. This study proposes a day-ahead planning optimization framework to mitigate the time delay effect and improve system benefits and reliability under multiple uncertainties. This framework incorporates joint and updated optimizations to address challenges posed by the time delay effect. A case study on the Yalong River Basin hydro-wind-photovoltaic system shows that the proposed framework enhances generation benefits by 2.79% over traditional methods and reduces the power shortage rate by 43.19%. Additional multi-objective scheduling experiments assess the framework’s risk control capabilities and the variations in scheduling across different schemes. Based on these analyses, an improvement strategy for this system is developed and validated to significantly reduce power shortage rates while minimizing revenue losses.</div></div>\",\"PeriodicalId\":50326,\"journal\":{\"name\":\"International Journal of Electrical Power & Energy Systems\",\"volume\":\"169 \",\"pages\":\"Article 110800\"},\"PeriodicalIF\":5.0000,\"publicationDate\":\"2025-06-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Electrical Power & Energy Systems\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0142061525003485\",\"RegionNum\":2,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"ENGINEERING, ELECTRICAL & ELECTRONIC\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Electrical Power & Energy Systems","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0142061525003485","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

摘要

梯级水电站的时滞是指水从上游水库流向下游水库所需的时间。尽管一些研究考虑了水气-风-光伏混合系统模型的时间延迟,但对其影响和缓解策略的全面研究仍然有限。这些延迟阻碍了水电、风电和光伏资源的联合优化,降低了系统效益,增加了运行风险。这种现象被称为时间延迟效应。本研究提出一种日前规划优化框架,以减轻多不确定因素下的时滞效应,提高系统效益和可靠性。该框架结合了联合优化和更新优化,以解决时间延迟效应带来的挑战。以雅砻江流域水风光伏发电系统为例研究表明,该框架比传统方式提高发电效益2.79%,降低缺电率43.19%。额外的多目标调度实验评估了框架的风险控制能力和不同方案之间调度的变化。基于这些分析,开发并验证了该系统的改进策略,以显着降低电力短缺率,同时最大限度地减少收入损失。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Day-ahead planning optimization framework for cascaded hydro-wind-photovoltaic hybrid systems considering time delay effects
The time delay in cascade hydropower stations refers to the time required for water to travel from the upstream reservoir to the downstream reservoir. Although some studies consider time delays in hydro-wind-photovoltaic hybrid system models, comprehensive research on their impacts and mitigation strategies remains limited. These delays hinder the joint optimization of hydropower, wind, and photovoltaic resources, reducing system benefits and increasing operational risks. This phenomenon is referred to as the time delay effect. This study proposes a day-ahead planning optimization framework to mitigate the time delay effect and improve system benefits and reliability under multiple uncertainties. This framework incorporates joint and updated optimizations to address challenges posed by the time delay effect. A case study on the Yalong River Basin hydro-wind-photovoltaic system shows that the proposed framework enhances generation benefits by 2.79% over traditional methods and reduces the power shortage rate by 43.19%. Additional multi-objective scheduling experiments assess the framework’s risk control capabilities and the variations in scheduling across different schemes. Based on these analyses, an improvement strategy for this system is developed and validated to significantly reduce power shortage rates while minimizing revenue losses.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
International Journal of Electrical Power & Energy Systems
International Journal of Electrical Power & Energy Systems 工程技术-工程:电子与电气
CiteScore
12.10
自引率
17.30%
发文量
1022
审稿时长
51 days
期刊介绍: The journal covers theoretical developments in electrical power and energy systems and their applications. The coverage embraces: generation and network planning; reliability; long and short term operation; expert systems; neural networks; object oriented systems; system control centres; database and information systems; stock and parameter estimation; system security and adequacy; network theory, modelling and computation; small and large system dynamics; dynamic model identification; on-line control including load and switching control; protection; distribution systems; energy economics; impact of non-conventional systems; and man-machine interfaces. As well as original research papers, the journal publishes short contributions, book reviews and conference reports. All papers are peer-reviewed by at least two referees.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信