{"title":"标准火灾中包裹PBO-FRCM和CFRP加固体系的圆形RC柱","authors":"Salem Khalaf ,&nbsp;Farid Abed ,&nbsp;Ahmed El Refai ,&nbsp;Naeim Roshan ,&nbsp;Hamzeh Hajiloo","doi":"10.1016/j.firesaf.2025.104424","DOIUrl":null,"url":null,"abstract":"<div><div>The fire performance of reinforced concrete (RC) columns strengthened with fiber-reinforced polymer (FRP) or fabric-reinforced cementitious matrix (FRCM) systems remains a concern. For an FRP strengthening system to be considered effective during a fire, its fire performance must be defined using adequate fire protection. Without proper fire protection, FRP loses effectiveness early in a fire event. Four circular columns (800 mm in length) were exposed to ASTM <span><span>E119</span><svg><path></path></svg></span> standard fire for 180 min with a sustained load equal to 13 % of their capacity. Carbon FRP wraps and FRCM with poly benzo isoxazole (PBO) grids were used for strengthening the columns. Two types of fire protection systems examined including spray applied fire-resistant material (SFRM) and intumescent paint (IP) coatings. Results showed significantly lower temperatures in columns wrapped with FRCM compared to the one wrapped with CFRP sheets. The SFRM-insulated column demonstrated superior performance, maintaining concrete core temperatures below 130 °C throughout the entire fire exposure period. A key observation was the quick ignition of the CFRP beneath the IP coating, which caused a rapid temperature increase, localized concrete spalling due to the mismatch in thermal expansion between the CFRP sheets and concrete, and early exposure of the steel reinforcement. It is recommended to apply the IP coating carefully over combustible materials like FRP, as its fire protection capability may diminish within the first 30 min of the fire test. While SFRM performed well, combining FRCM with SFRM offers a more effective approach to enhancing the fire resistance of RC columns.</div></div>","PeriodicalId":50445,"journal":{"name":"Fire Safety Journal","volume":"155 ","pages":"Article 104424"},"PeriodicalIF":3.4000,"publicationDate":"2025-05-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Circular RC columns wrapped with PBO-FRCM and CFRP strengthening systems in a standard fire\",\"authors\":\"Salem Khalaf ,&nbsp;Farid Abed ,&nbsp;Ahmed El Refai ,&nbsp;Naeim Roshan ,&nbsp;Hamzeh Hajiloo\",\"doi\":\"10.1016/j.firesaf.2025.104424\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>The fire performance of reinforced concrete (RC) columns strengthened with fiber-reinforced polymer (FRP) or fabric-reinforced cementitious matrix (FRCM) systems remains a concern. For an FRP strengthening system to be considered effective during a fire, its fire performance must be defined using adequate fire protection. Without proper fire protection, FRP loses effectiveness early in a fire event. Four circular columns (800 mm in length) were exposed to ASTM <span><span>E119</span><svg><path></path></svg></span> standard fire for 180 min with a sustained load equal to 13 % of their capacity. Carbon FRP wraps and FRCM with poly benzo isoxazole (PBO) grids were used for strengthening the columns. Two types of fire protection systems examined including spray applied fire-resistant material (SFRM) and intumescent paint (IP) coatings. Results showed significantly lower temperatures in columns wrapped with FRCM compared to the one wrapped with CFRP sheets. The SFRM-insulated column demonstrated superior performance, maintaining concrete core temperatures below 130 °C throughout the entire fire exposure period. A key observation was the quick ignition of the CFRP beneath the IP coating, which caused a rapid temperature increase, localized concrete spalling due to the mismatch in thermal expansion between the CFRP sheets and concrete, and early exposure of the steel reinforcement. It is recommended to apply the IP coating carefully over combustible materials like FRP, as its fire protection capability may diminish within the first 30 min of the fire test. While SFRM performed well, combining FRCM with SFRM offers a more effective approach to enhancing the fire resistance of RC columns.</div></div>\",\"PeriodicalId\":50445,\"journal\":{\"name\":\"Fire Safety Journal\",\"volume\":\"155 \",\"pages\":\"Article 104424\"},\"PeriodicalIF\":3.4000,\"publicationDate\":\"2025-05-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Fire Safety Journal\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0379711225000888\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Fire Safety Journal","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0379711225000888","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

纤维增强聚合物(FRP)或纤维增强胶凝基质(FRCM)加固的钢筋混凝土柱的防火性能一直是人们关注的问题。对于在火灾中被认为有效的FRP加固系统,其防火性能必须通过充分的防火来定义。如果没有适当的防火措施,FRP在火灾发生时就会早期失效。四根圆形柱(长度为800毫米)暴露在ASTM E119标准火中180分钟,持续载荷等于其容量的13%。采用碳纤维复合材料包层和含聚苯并异恶唑(PBO)网格的FRCM对柱进行加固。检查了两种类型的防火系统,包括喷涂防火材料(SFRM)和膨胀涂料(IP)涂层。结果表明,与CFRP片材包裹的柱相比,FRCM包裹的柱温度显著降低。sfrm绝缘柱表现出优异的性能,在整个火灾暴露期间将混凝土核心温度保持在130°C以下。一个关键的观察结果是,在IP涂层下的CFRP迅速着火,导致温度迅速升高,由于CFRP片材和混凝土之间热膨胀不匹配导致局部混凝土剥落,以及钢筋的早期暴露。建议将IP涂层涂在FRP等可燃材料上,因为其防火能力可能在防火试验的前30分钟内下降。预应力混凝土加固性能良好,但将预应力混凝土加固与预应力混凝土加固相结合是提高钢筋混凝土柱耐火性能的更有效方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Circular RC columns wrapped with PBO-FRCM and CFRP strengthening systems in a standard fire
The fire performance of reinforced concrete (RC) columns strengthened with fiber-reinforced polymer (FRP) or fabric-reinforced cementitious matrix (FRCM) systems remains a concern. For an FRP strengthening system to be considered effective during a fire, its fire performance must be defined using adequate fire protection. Without proper fire protection, FRP loses effectiveness early in a fire event. Four circular columns (800 mm in length) were exposed to ASTM E119 standard fire for 180 min with a sustained load equal to 13 % of their capacity. Carbon FRP wraps and FRCM with poly benzo isoxazole (PBO) grids were used for strengthening the columns. Two types of fire protection systems examined including spray applied fire-resistant material (SFRM) and intumescent paint (IP) coatings. Results showed significantly lower temperatures in columns wrapped with FRCM compared to the one wrapped with CFRP sheets. The SFRM-insulated column demonstrated superior performance, maintaining concrete core temperatures below 130 °C throughout the entire fire exposure period. A key observation was the quick ignition of the CFRP beneath the IP coating, which caused a rapid temperature increase, localized concrete spalling due to the mismatch in thermal expansion between the CFRP sheets and concrete, and early exposure of the steel reinforcement. It is recommended to apply the IP coating carefully over combustible materials like FRP, as its fire protection capability may diminish within the first 30 min of the fire test. While SFRM performed well, combining FRCM with SFRM offers a more effective approach to enhancing the fire resistance of RC columns.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Fire Safety Journal
Fire Safety Journal 工程技术-材料科学:综合
CiteScore
5.70
自引率
9.70%
发文量
153
审稿时长
60 days
期刊介绍: Fire Safety Journal is the leading publication dealing with all aspects of fire safety engineering. Its scope is purposefully wide, as it is deemed important to encourage papers from all sources within this multidisciplinary subject, thus providing a forum for its further development as a distinct engineering discipline. This is an essential step towards gaining a status equal to that enjoyed by the other engineering disciplines.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信