{"title":"为NEC4工程及建筑合约拟备GBR的ITA指引-工程量清单选项B及D","authors":"Alexandre Gomes ,&nbsp;Hannes Ertl ,&nbsp;Andres Marulanda ,&nbsp;Matthias Neuenschwander ,&nbsp;Bill Newns","doi":"10.1016/j.tust.2025.106656","DOIUrl":null,"url":null,"abstract":"<div><div>This guideline outlines the recommendations of the International Tunnelling and Underground Space Association (ITA) for preparing a Geotechnical Baseline Report (GBR) for the NEC4 Engineering and Construction Contract (ECC), specifically for Options B or D, with use of a Bill of Quantities. This document complements and should be read alongside the “Guidance on NEC and Underground Works (2025)” (hereafter referred to as “NEC-ITA Guidance (2025)”), which provides a model clause and guidance for implementing an alternative risk allocation approach using a GBR within the NEC4 ECC.</div></div>","PeriodicalId":49414,"journal":{"name":"Tunnelling and Underground Space Technology","volume":"163 ","pages":"Article 106656"},"PeriodicalIF":6.7000,"publicationDate":"2025-05-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ITA guidelines for the preparation of the GBR for the NEC4 engineering and construction contracts – Options B and D with bill of quantities\",\"authors\":\"Alexandre Gomes ,&nbsp;Hannes Ertl ,&nbsp;Andres Marulanda ,&nbsp;Matthias Neuenschwander ,&nbsp;Bill Newns\",\"doi\":\"10.1016/j.tust.2025.106656\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>This guideline outlines the recommendations of the International Tunnelling and Underground Space Association (ITA) for preparing a Geotechnical Baseline Report (GBR) for the NEC4 Engineering and Construction Contract (ECC), specifically for Options B or D, with use of a Bill of Quantities. This document complements and should be read alongside the “Guidance on NEC and Underground Works (2025)” (hereafter referred to as “NEC-ITA Guidance (2025)”), which provides a model clause and guidance for implementing an alternative risk allocation approach using a GBR within the NEC4 ECC.</div></div>\",\"PeriodicalId\":49414,\"journal\":{\"name\":\"Tunnelling and Underground Space Technology\",\"volume\":\"163 \",\"pages\":\"Article 106656\"},\"PeriodicalIF\":6.7000,\"publicationDate\":\"2025-05-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Tunnelling and Underground Space Technology\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0886779825002949\",\"RegionNum\":1,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Tunnelling and Underground Space Technology","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0886779825002949","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

本指引概述了国际隧道与地下空间协会(ITA)为NEC4工程与建筑合同(ECC)准备岩土基线报告(GBR)的建议,特别是方案B或D,并使用工程量清单。本文件是对“NEC和地下工程指南(2025)”(以下简称“NEC- ita指南(2025)”)的补充,应与“NEC- ita指南(2025)”一起阅读,该指南为在NEC4 ECC内使用GBR实施替代风险分配方法提供了示范条款和指导。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ITA guidelines for the preparation of the GBR for the NEC4 engineering and construction contracts – Options B and D with bill of quantities
This guideline outlines the recommendations of the International Tunnelling and Underground Space Association (ITA) for preparing a Geotechnical Baseline Report (GBR) for the NEC4 Engineering and Construction Contract (ECC), specifically for Options B or D, with use of a Bill of Quantities. This document complements and should be read alongside the “Guidance on NEC and Underground Works (2025)” (hereafter referred to as “NEC-ITA Guidance (2025)”), which provides a model clause and guidance for implementing an alternative risk allocation approach using a GBR within the NEC4 ECC.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Tunnelling and Underground Space Technology
Tunnelling and Underground Space Technology 工程技术-工程:土木
CiteScore
11.90
自引率
18.80%
发文量
454
审稿时长
10.8 months
期刊介绍: Tunnelling and Underground Space Technology is an international journal which publishes authoritative articles encompassing the development of innovative uses of underground space and the results of high quality research into improved, more cost-effective techniques for the planning, geo-investigation, design, construction, operation and maintenance of underground and earth-sheltered structures. The journal provides an effective vehicle for the improved worldwide exchange of information on developments in underground technology - and the experience gained from its use - and is strongly committed to publishing papers on the interdisciplinary aspects of creating, planning, and regulating underground space.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信