利用优化的 BIM 和项目进度表集成,实现基于增强现实技术的施工现场管理

IF 9.6 1区 工程技术 Q1 CONSTRUCTION & BUILDING TECHNOLOGY
Sanyukta Arvikar , Pa Pa Win Aung , Gichun Cha , Seunghee Park
{"title":"利用优化的 BIM 和项目进度表集成,实现基于增强现实技术的施工现场管理","authors":"Sanyukta Arvikar ,&nbsp;Pa Pa Win Aung ,&nbsp;Gichun Cha ,&nbsp;Seunghee Park","doi":"10.1016/j.autcon.2025.106204","DOIUrl":null,"url":null,"abstract":"<div><div>The construction industry has experienced significant transformation with the adoption of Building Information Modeling (BIM) technology, which provides a virtual representation of both the physical and functional components of construction projects. In this context, project scheduling becomes a vital tool for site managers to assess construction progress. This paper introduces an augmented reality (AR) system for construction site management that integrates optimized BIM models with project schedules to enhance real-time progress tracking. Optimized models are crucial for accurate overlaying at full scale in the real world, allowing for real-time monitoring of site progress based on evolving project timelines. This is achieved through a method of splitting the BIM model according to user-selected timeframes within the AR application. The system was tested on five bridge construction sites, and its effectiveness was evaluated through a structured survey of 30 on-site professionals, including engineers and project managers. The findings offer valuable insights for the construction industry, enabling efficient management and tracking of project progress by comparing planned schedules with actual performance. Additionally, this paper addresses a gap in the limited research on the integration of BIM and AR for site progress monitoring, while minimizing the loss of Revit metadata.</div></div>","PeriodicalId":8660,"journal":{"name":"Automation in Construction","volume":"175 ","pages":"Article 106204"},"PeriodicalIF":9.6000,"publicationDate":"2025-04-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Augmented Reality-based construction site management using optimized BIM and project schedule integration\",\"authors\":\"Sanyukta Arvikar ,&nbsp;Pa Pa Win Aung ,&nbsp;Gichun Cha ,&nbsp;Seunghee Park\",\"doi\":\"10.1016/j.autcon.2025.106204\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>The construction industry has experienced significant transformation with the adoption of Building Information Modeling (BIM) technology, which provides a virtual representation of both the physical and functional components of construction projects. In this context, project scheduling becomes a vital tool for site managers to assess construction progress. This paper introduces an augmented reality (AR) system for construction site management that integrates optimized BIM models with project schedules to enhance real-time progress tracking. Optimized models are crucial for accurate overlaying at full scale in the real world, allowing for real-time monitoring of site progress based on evolving project timelines. This is achieved through a method of splitting the BIM model according to user-selected timeframes within the AR application. The system was tested on five bridge construction sites, and its effectiveness was evaluated through a structured survey of 30 on-site professionals, including engineers and project managers. The findings offer valuable insights for the construction industry, enabling efficient management and tracking of project progress by comparing planned schedules with actual performance. Additionally, this paper addresses a gap in the limited research on the integration of BIM and AR for site progress monitoring, while minimizing the loss of Revit metadata.</div></div>\",\"PeriodicalId\":8660,\"journal\":{\"name\":\"Automation in Construction\",\"volume\":\"175 \",\"pages\":\"Article 106204\"},\"PeriodicalIF\":9.6000,\"publicationDate\":\"2025-04-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Automation in Construction\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0926580525002444\",\"RegionNum\":1,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Automation in Construction","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0926580525002444","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

随着建筑信息模型(BIM)技术的采用,建筑行业经历了重大变革,该技术为建筑项目的物理和功能组件提供了虚拟表示。在这种情况下,项目进度计划成为现场管理人员评估施工进度的重要工具。本文介绍了一种用于施工现场管理的增强现实(AR)系统,该系统将优化的BIM模型与项目进度相结合,增强了对进度的实时跟踪。优化的模型对于在现实世界中准确覆盖全尺寸至关重要,允许根据不断变化的项目时间表实时监控站点进度。这是通过在AR应用程序中根据用户选择的时间框架拆分BIM模型的方法实现的。该系统在五个桥梁施工现场进行了测试,并通过对30名现场专业人员(包括工程师和项目经理)的结构化调查来评估其有效性。研究结果为建筑行业提供了有价值的见解,通过将计划的时间表与实际表现进行比较,实现了项目进度的有效管理和跟踪。此外,本文还解决了BIM和AR集成用于现场进度监控的有限研究中的一个空白,同时最大限度地减少了Revit元数据的损失。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Augmented Reality-based construction site management using optimized BIM and project schedule integration
The construction industry has experienced significant transformation with the adoption of Building Information Modeling (BIM) technology, which provides a virtual representation of both the physical and functional components of construction projects. In this context, project scheduling becomes a vital tool for site managers to assess construction progress. This paper introduces an augmented reality (AR) system for construction site management that integrates optimized BIM models with project schedules to enhance real-time progress tracking. Optimized models are crucial for accurate overlaying at full scale in the real world, allowing for real-time monitoring of site progress based on evolving project timelines. This is achieved through a method of splitting the BIM model according to user-selected timeframes within the AR application. The system was tested on five bridge construction sites, and its effectiveness was evaluated through a structured survey of 30 on-site professionals, including engineers and project managers. The findings offer valuable insights for the construction industry, enabling efficient management and tracking of project progress by comparing planned schedules with actual performance. Additionally, this paper addresses a gap in the limited research on the integration of BIM and AR for site progress monitoring, while minimizing the loss of Revit metadata.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Automation in Construction
Automation in Construction 工程技术-工程:土木
CiteScore
19.20
自引率
16.50%
发文量
563
审稿时长
8.5 months
期刊介绍: Automation in Construction is an international journal that focuses on publishing original research papers related to the use of Information Technologies in various aspects of the construction industry. The journal covers topics such as design, engineering, construction technologies, and the maintenance and management of constructed facilities. The scope of Automation in Construction is extensive and covers all stages of the construction life cycle. This includes initial planning and design, construction of the facility, operation and maintenance, as well as the eventual dismantling and recycling of buildings and engineering structures.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信