{"title":"将合规性转化为机会:FERC第2023号命令如何重新定义电网","authors":"Martin Shalhoub,&nbsp;Michael Lavillotti","doi":"10.1002/gas.22459","DOIUrl":null,"url":null,"abstract":"<p>Federal Energy Regulatory Commission (FERC) Order No. 2023, issued in July 2023, represents a transformative shift in how new electricity projects interconnect with the power grid. By replacing the historical and outdated “first come, first served” approach with a “first ready, first served” model, the order prioritizes make-ready projects and mandates cluster studies to streamline interconnection processes. It also requires transmission operators to adopt more dynamic evaluation methods and models to improve transparency and help developers identify optimal points of interconnection while avoiding highly congested areas. FERC's changes aim to reduce delays, improve efficiency, and address the growing backlog of over 2,000 GW of stalled projects. This is also expected to prioritize projects and lower costs.</p>","PeriodicalId":100259,"journal":{"name":"Climate and Energy","volume":"41 10","pages":"19-22"},"PeriodicalIF":0.0000,"publicationDate":"2025-04-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Turning Compliance into Opportunity: How FERC Order No. 2023 Redefines the Grid\",\"authors\":\"Martin Shalhoub,&nbsp;Michael Lavillotti\",\"doi\":\"10.1002/gas.22459\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>Federal Energy Regulatory Commission (FERC) Order No. 2023, issued in July 2023, represents a transformative shift in how new electricity projects interconnect with the power grid. By replacing the historical and outdated “first come, first served” approach with a “first ready, first served” model, the order prioritizes make-ready projects and mandates cluster studies to streamline interconnection processes. It also requires transmission operators to adopt more dynamic evaluation methods and models to improve transparency and help developers identify optimal points of interconnection while avoiding highly congested areas. FERC's changes aim to reduce delays, improve efficiency, and address the growing backlog of over 2,000 GW of stalled projects. This is also expected to prioritize projects and lower costs.</p>\",\"PeriodicalId\":100259,\"journal\":{\"name\":\"Climate and Energy\",\"volume\":\"41 10\",\"pages\":\"19-22\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2025-04-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Climate and Energy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1002/gas.22459\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Climate and Energy","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/gas.22459","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

联邦能源监管委员会(FERC)于2023年7月发布的第2023号命令代表了新电力项目如何与电网互连的革命性转变。通过以“先到先得”的模式取代历史上过时的“先到先得”的方法,该命令优先考虑准备就绪的项目,并要求进行集群研究,以简化互连过程。它还要求输电运营商采用更动态的评估方法和模型,以提高透明度,帮助开发商确定最佳的互联点,同时避免高度拥堵的区域。联邦能源管理委员会的改革旨在减少延误,提高效率,并解决积压的超过2000吉瓦的停滞项目。这也有望优先考虑项目并降低成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Turning Compliance into Opportunity: How FERC Order No. 2023 Redefines the Grid

Federal Energy Regulatory Commission (FERC) Order No. 2023, issued in July 2023, represents a transformative shift in how new electricity projects interconnect with the power grid. By replacing the historical and outdated “first come, first served” approach with a “first ready, first served” model, the order prioritizes make-ready projects and mandates cluster studies to streamline interconnection processes. It also requires transmission operators to adopt more dynamic evaluation methods and models to improve transparency and help developers identify optimal points of interconnection while avoiding highly congested areas. FERC's changes aim to reduce delays, improve efficiency, and address the growing backlog of over 2,000 GW of stalled projects. This is also expected to prioritize projects and lower costs.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信