考虑输电系统灵活性问题的灵活性合同对人工频率恢复储备市场的影响

IF 5 2区 工程技术 Q1 ENGINEERING, ELECTRICAL & ELECTRONIC
Milad Mousavi , Manuel Alvarez , Jin Zhong , Sarah Rönnberg
{"title":"考虑输电系统灵活性问题的灵活性合同对人工频率恢复储备市场的影响","authors":"Milad Mousavi ,&nbsp;Manuel Alvarez ,&nbsp;Jin Zhong ,&nbsp;Sarah Rönnberg","doi":"10.1016/j.ijepes.2025.110576","DOIUrl":null,"url":null,"abstract":"<div><div>One of the solutions to cope with the increased need for flexibility in power systems is contract-based trading of power flexibility (FlexCon). Such contracts aim to overcome the uncertainties of renewable generation and variation of consumption. The effects of FlexCons on the existing market environment—especially on balancing markets (BLMs)—need to be explored further. Accordingly, this paper presents a methodology to optimize FlexCons and manual frequency restoration reserve–energy activation market (mFRR-EAM) considering the transmission system flexibility issues. FlexCons are between variable renewable energy producers (VREPs) and electricity retailers (RETs), and through this instrument, participants can exchange their deviation of production and consumption from their day-ahead market (DAM) schedule as a source of power flexibility to cope with the volatile market prices and assist with solving flexibility needs. In the proposed methodology, introduced entities as FlexCon operators clear FlexCons in different locations of the system and send the results to FlexCon participants and the transmission system operator (TSO). Subsequently, the TSO clears the mFRR-EAM close to the real-time power delivery to address the remaining flexibility requirements. The impacts of considering FlexCons along with the mFRR-EAM on operational and economic aspects of the social welfare maximization problem of mFRR-EAM and optimal power flow outcomes are assessed. A three-bus illustrative example and a modified IEEE 30-bus system are used as case studies. The results indicate that when considering FlexCons in the system, a lower flexibility price and lower operation cost in the mFRR-EAM can be achieved. Moreover, the presence of FlexCons along with the mFRR-EAM contributes to lower congestion in transmission lines.</div></div>","PeriodicalId":50326,"journal":{"name":"International Journal of Electrical Power & Energy Systems","volume":"166 ","pages":"Article 110576"},"PeriodicalIF":5.0000,"publicationDate":"2025-03-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Effects of flexibility contracts on manual frequency restoration reserve market considering transmission system flexibility issues\",\"authors\":\"Milad Mousavi ,&nbsp;Manuel Alvarez ,&nbsp;Jin Zhong ,&nbsp;Sarah Rönnberg\",\"doi\":\"10.1016/j.ijepes.2025.110576\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>One of the solutions to cope with the increased need for flexibility in power systems is contract-based trading of power flexibility (FlexCon). Such contracts aim to overcome the uncertainties of renewable generation and variation of consumption. The effects of FlexCons on the existing market environment—especially on balancing markets (BLMs)—need to be explored further. Accordingly, this paper presents a methodology to optimize FlexCons and manual frequency restoration reserve–energy activation market (mFRR-EAM) considering the transmission system flexibility issues. FlexCons are between variable renewable energy producers (VREPs) and electricity retailers (RETs), and through this instrument, participants can exchange their deviation of production and consumption from their day-ahead market (DAM) schedule as a source of power flexibility to cope with the volatile market prices and assist with solving flexibility needs. In the proposed methodology, introduced entities as FlexCon operators clear FlexCons in different locations of the system and send the results to FlexCon participants and the transmission system operator (TSO). Subsequently, the TSO clears the mFRR-EAM close to the real-time power delivery to address the remaining flexibility requirements. The impacts of considering FlexCons along with the mFRR-EAM on operational and economic aspects of the social welfare maximization problem of mFRR-EAM and optimal power flow outcomes are assessed. A three-bus illustrative example and a modified IEEE 30-bus system are used as case studies. The results indicate that when considering FlexCons in the system, a lower flexibility price and lower operation cost in the mFRR-EAM can be achieved. Moreover, the presence of FlexCons along with the mFRR-EAM contributes to lower congestion in transmission lines.</div></div>\",\"PeriodicalId\":50326,\"journal\":{\"name\":\"International Journal of Electrical Power & Energy Systems\",\"volume\":\"166 \",\"pages\":\"Article 110576\"},\"PeriodicalIF\":5.0000,\"publicationDate\":\"2025-03-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Electrical Power & Energy Systems\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0142061525001279\",\"RegionNum\":2,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"ENGINEERING, ELECTRICAL & ELECTRONIC\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Electrical Power & Energy Systems","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0142061525001279","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

摘要

应对电力系统灵活性需求增加的解决方案之一是基于合同的电力灵活性交易(FlexCon)。这种合同旨在克服可再生能源发电和消费变化的不确定性。FlexCons 对现有市场环境--尤其是平衡市场(BLMs)--的影响需要进一步探讨。因此,考虑到输电系统的灵活性问题,本文提出了一种优化 FlexCons 和手动频率恢复储备-能量激活市场(mFRR-EAM)的方法。FlexCons 是可变可再生能源生产商(VREPs)和电力零售商(RETs)之间的交易,通过这一工具,参与者可以交换其生产和消费偏离其日前市场(DAM)计划的情况,作为电力灵活性的来源,以应对波动的市场价格,并协助解决灵活性需求。在建议的方法中,引入的实体作为 FlexCon 运营商对系统不同位置的 FlexCon 进行清算,并将结果发送给 FlexCon 参与者和输电系统运营商(TSO)。随后,输电系统运营商在接近实时电力输送时清除 mFRR-EAM,以满足剩余的灵活性需求。我们评估了将 FlexCons 与 mFRR-EAM 一并考虑对 mFRR-EAM 社会福利最大化问题的运营和经济方面以及最佳电力流结果的影响。案例研究使用了一个三总线示例和一个改进的 IEEE 30 总线系统。结果表明,在系统中考虑 FlexCons 时,mFRR-EAM 可以实现较低的灵活性价格和运营成本。此外,FlexCons 和 mFRR-EAM 的存在还有助于降低输电线路的拥堵程度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Effects of flexibility contracts on manual frequency restoration reserve market considering transmission system flexibility issues
One of the solutions to cope with the increased need for flexibility in power systems is contract-based trading of power flexibility (FlexCon). Such contracts aim to overcome the uncertainties of renewable generation and variation of consumption. The effects of FlexCons on the existing market environment—especially on balancing markets (BLMs)—need to be explored further. Accordingly, this paper presents a methodology to optimize FlexCons and manual frequency restoration reserve–energy activation market (mFRR-EAM) considering the transmission system flexibility issues. FlexCons are between variable renewable energy producers (VREPs) and electricity retailers (RETs), and through this instrument, participants can exchange their deviation of production and consumption from their day-ahead market (DAM) schedule as a source of power flexibility to cope with the volatile market prices and assist with solving flexibility needs. In the proposed methodology, introduced entities as FlexCon operators clear FlexCons in different locations of the system and send the results to FlexCon participants and the transmission system operator (TSO). Subsequently, the TSO clears the mFRR-EAM close to the real-time power delivery to address the remaining flexibility requirements. The impacts of considering FlexCons along with the mFRR-EAM on operational and economic aspects of the social welfare maximization problem of mFRR-EAM and optimal power flow outcomes are assessed. A three-bus illustrative example and a modified IEEE 30-bus system are used as case studies. The results indicate that when considering FlexCons in the system, a lower flexibility price and lower operation cost in the mFRR-EAM can be achieved. Moreover, the presence of FlexCons along with the mFRR-EAM contributes to lower congestion in transmission lines.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
International Journal of Electrical Power & Energy Systems
International Journal of Electrical Power & Energy Systems 工程技术-工程:电子与电气
CiteScore
12.10
自引率
17.30%
发文量
1022
审稿时长
51 days
期刊介绍: The journal covers theoretical developments in electrical power and energy systems and their applications. The coverage embraces: generation and network planning; reliability; long and short term operation; expert systems; neural networks; object oriented systems; system control centres; database and information systems; stock and parameter estimation; system security and adequacy; network theory, modelling and computation; small and large system dynamics; dynamic model identification; on-line control including load and switching control; protection; distribution systems; energy economics; impact of non-conventional systems; and man-machine interfaces. As well as original research papers, the journal publishes short contributions, book reviews and conference reports. All papers are peer-reviewed by at least two referees.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信