具有快速爬坡单元的多阶段鲁棒单元承诺的部分仿射策略

IF 6.9 2区 工程技术 Q2 ENERGY & FUELS
Zhongjie Guo;Jiayu Bai;Wei Wei;Shengwei Mei;Weihao Hu
{"title":"具有快速爬坡单元的多阶段鲁棒单元承诺的部分仿射策略","authors":"Zhongjie Guo;Jiayu Bai;Wei Wei;Shengwei Mei;Weihao Hu","doi":"10.17775/CSEEJPES.2023.08300","DOIUrl":null,"url":null,"abstract":"Multistage robust unit commitment (MRUC) is an important decision-making problem in power system operations. The affine policy facilitates problem-solving, but it compromises flexibility. This letter proposes a partially affine policy for MRU C problem with fast-ramping units; this policy imposes affine relations to coupling variables only and leaves the remaining variables to be optimized in the real-time dispatch. As a result, the real-time flexibility of fast-ramping units is retained. By adopting this approach, MRU C with a partially affine policy becomes a special two-stage adaptive robust optimization problem. Numerical tests verify that the proposed partially affine policy significantly reduces the conservativeness compared with affine policy, improving the dispatch economy and flexibility.","PeriodicalId":10729,"journal":{"name":"CSEE Journal of Power and Energy Systems","volume":"11 1","pages":"477-480"},"PeriodicalIF":6.9000,"publicationDate":"2024-09-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=10684519","citationCount":"0","resultStr":"{\"title\":\"Partially Affine Policy for Multistage Robust Unit Commitment with Fast-Ramping Units\",\"authors\":\"Zhongjie Guo;Jiayu Bai;Wei Wei;Shengwei Mei;Weihao Hu\",\"doi\":\"10.17775/CSEEJPES.2023.08300\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Multistage robust unit commitment (MRUC) is an important decision-making problem in power system operations. The affine policy facilitates problem-solving, but it compromises flexibility. This letter proposes a partially affine policy for MRU C problem with fast-ramping units; this policy imposes affine relations to coupling variables only and leaves the remaining variables to be optimized in the real-time dispatch. As a result, the real-time flexibility of fast-ramping units is retained. By adopting this approach, MRU C with a partially affine policy becomes a special two-stage adaptive robust optimization problem. Numerical tests verify that the proposed partially affine policy significantly reduces the conservativeness compared with affine policy, improving the dispatch economy and flexibility.\",\"PeriodicalId\":10729,\"journal\":{\"name\":\"CSEE Journal of Power and Energy Systems\",\"volume\":\"11 1\",\"pages\":\"477-480\"},\"PeriodicalIF\":6.9000,\"publicationDate\":\"2024-09-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=10684519\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"CSEE Journal of Power and Energy Systems\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://ieeexplore.ieee.org/document/10684519/\",\"RegionNum\":2,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENERGY & FUELS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"CSEE Journal of Power and Energy Systems","FirstCategoryId":"5","ListUrlMain":"https://ieeexplore.ieee.org/document/10684519/","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

摘要

多阶段鲁棒机组承诺是电力系统运行中的重要决策问题。仿射策略有助于解决问题,但它牺牲了灵活性。这封信提出了一个部分仿射策略的MRU C问题与快速斜坡单元;该策略仅对耦合变量施加仿射关系,其余变量在实时调度中进行优化。因此,快速斜坡单元的实时灵活性得以保留。采用该方法,具有部分仿射策略的MRU C问题成为一个特殊的两阶段自适应鲁棒优化问题。数值试验表明,与仿射策略相比,所提出的部分仿射策略显著降低了调度的保守性,提高了调度的经济性和灵活性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Partially Affine Policy for Multistage Robust Unit Commitment with Fast-Ramping Units
Multistage robust unit commitment (MRUC) is an important decision-making problem in power system operations. The affine policy facilitates problem-solving, but it compromises flexibility. This letter proposes a partially affine policy for MRU C problem with fast-ramping units; this policy imposes affine relations to coupling variables only and leaves the remaining variables to be optimized in the real-time dispatch. As a result, the real-time flexibility of fast-ramping units is retained. By adopting this approach, MRU C with a partially affine policy becomes a special two-stage adaptive robust optimization problem. Numerical tests verify that the proposed partially affine policy significantly reduces the conservativeness compared with affine policy, improving the dispatch economy and flexibility.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
11.80
自引率
12.70%
发文量
389
审稿时长
26 weeks
期刊介绍: The CSEE Journal of Power and Energy Systems (JPES) is an international bimonthly journal published by the Chinese Society for Electrical Engineering (CSEE) in collaboration with CEPRI (China Electric Power Research Institute) and IEEE (The Institute of Electrical and Electronics Engineers) Inc. Indexed by SCI, Scopus, INSPEC, CSAD (Chinese Science Abstracts Database), DOAJ, and ProQuest, it serves as a platform for reporting cutting-edge theories, methods, technologies, and applications shaping the development of power systems in energy transition. The journal offers authors an international platform to enhance the reach and impact of their contributions.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信