埃塞俄比亚中部Aluto-Langano和Tulu-Moye地热能评价

IF 1.4 4区 地球科学 Q3 GEOSCIENCES, MULTIDISCIPLINARY
Geological Journal Pub Date : 2024-11-24 DOI:10.1002/gj.5073
Mamaru Genetu
{"title":"埃塞俄比亚中部Aluto-Langano和Tulu-Moye地热能评价","authors":"Mamaru Genetu","doi":"10.1002/gj.5073","DOIUrl":null,"url":null,"abstract":"<div>\n \n <p>This study aims to identify the primary issues leading to the pause in geothermal energy development at Aluto-Langano and Tulu-Moye sites, while also exploring opportunities in new drilling wells and assessing compliance with occupational safety, health and environmental standards. The geothermal energy development status was evaluated through focus group discussions, site visits and field data collection. The Tulu-Moye Geothermal Operation (TMGO) project is underway to establish a power plant, with a phased development spanning 6 years targeting a total capacity of 150 MW, comprising 50 MW for Phase 1 and 100 MW for Phase 2, though with some constraints. The Aluto-I Geothermal Pilot Plant marked the initial efforts to produce electricity from geothermal sources but faced shutdown due to declining thermal energy in some wells, turbine corrosion, pentane leakage, frequent in efficiency of fans and instability of foundations. Consequently, Phase 2 of the project aims to integrate with Phase 1 wells to mitigate potential thermal energy losses. Geothermal energy development demands substantial initial investment but entails minimal ongoing costs and workforce requirements. Its eco-friendliness benefits communities, offering higher efficiency and lower maintenance compared to hydroelectricity. Leveraging Ethiopia's geothermal potential is crucial for electricity generation, mineral extraction, and water supply, with plans involving nationwide field expansion to enhance renewable energy capacity.</p>\n </div>","PeriodicalId":12784,"journal":{"name":"Geological Journal","volume":"60 1","pages":"64-72"},"PeriodicalIF":1.4000,"publicationDate":"2024-11-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Assessment of Geothermal Energy in Aluto-Langano and Tulu-Moye, Central Ethiopia\",\"authors\":\"Mamaru Genetu\",\"doi\":\"10.1002/gj.5073\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div>\\n \\n <p>This study aims to identify the primary issues leading to the pause in geothermal energy development at Aluto-Langano and Tulu-Moye sites, while also exploring opportunities in new drilling wells and assessing compliance with occupational safety, health and environmental standards. The geothermal energy development status was evaluated through focus group discussions, site visits and field data collection. The Tulu-Moye Geothermal Operation (TMGO) project is underway to establish a power plant, with a phased development spanning 6 years targeting a total capacity of 150 MW, comprising 50 MW for Phase 1 and 100 MW for Phase 2, though with some constraints. The Aluto-I Geothermal Pilot Plant marked the initial efforts to produce electricity from geothermal sources but faced shutdown due to declining thermal energy in some wells, turbine corrosion, pentane leakage, frequent in efficiency of fans and instability of foundations. Consequently, Phase 2 of the project aims to integrate with Phase 1 wells to mitigate potential thermal energy losses. Geothermal energy development demands substantial initial investment but entails minimal ongoing costs and workforce requirements. Its eco-friendliness benefits communities, offering higher efficiency and lower maintenance compared to hydroelectricity. Leveraging Ethiopia's geothermal potential is crucial for electricity generation, mineral extraction, and water supply, with plans involving nationwide field expansion to enhance renewable energy capacity.</p>\\n </div>\",\"PeriodicalId\":12784,\"journal\":{\"name\":\"Geological Journal\",\"volume\":\"60 1\",\"pages\":\"64-72\"},\"PeriodicalIF\":1.4000,\"publicationDate\":\"2024-11-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Geological Journal\",\"FirstCategoryId\":\"89\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1002/gj.5073\",\"RegionNum\":4,\"RegionCategory\":\"地球科学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"GEOSCIENCES, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Geological Journal","FirstCategoryId":"89","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/gj.5073","RegionNum":4,"RegionCategory":"地球科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"GEOSCIENCES, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

摘要

本研究旨在确定导致Aluto-Langano和Tulu-Moye地区地热能源开发暂停的主要问题,同时探索新钻井的机会,并评估其是否符合职业安全、健康和环境标准。通过焦点小组讨论、实地考察和实地数据收集,对地热能开发现状进行了评价。Tulu-Moye地热运营(TMGO)项目正在建设一个发电厂,该项目分阶段开发,历时6年,总容量为150兆瓦,包括第一期50兆瓦和第二期100兆瓦,尽管存在一些限制。Aluto-I地热试验工厂标志着利用地热发电的初步努力,但由于一些井的热能下降、涡轮机腐蚀、戊烷泄漏、风机效率频繁下降和基础不稳定,该工厂面临关闭。因此,该项目的第二阶段旨在与第一阶段的井整合,以减少潜在的热能损失。地热能开发需要大量的初期投资,但需要的持续成本和劳动力需求很少。与水力发电相比,它的生态友好性使社区受益,效率更高,维护成本更低。利用埃塞俄比亚的地热潜力对发电、矿产开采和供水至关重要,其计划包括在全国范围内扩大地热领域,以提高可再生能源的产能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Assessment of Geothermal Energy in Aluto-Langano and Tulu-Moye, Central Ethiopia

This study aims to identify the primary issues leading to the pause in geothermal energy development at Aluto-Langano and Tulu-Moye sites, while also exploring opportunities in new drilling wells and assessing compliance with occupational safety, health and environmental standards. The geothermal energy development status was evaluated through focus group discussions, site visits and field data collection. The Tulu-Moye Geothermal Operation (TMGO) project is underway to establish a power plant, with a phased development spanning 6 years targeting a total capacity of 150 MW, comprising 50 MW for Phase 1 and 100 MW for Phase 2, though with some constraints. The Aluto-I Geothermal Pilot Plant marked the initial efforts to produce electricity from geothermal sources but faced shutdown due to declining thermal energy in some wells, turbine corrosion, pentane leakage, frequent in efficiency of fans and instability of foundations. Consequently, Phase 2 of the project aims to integrate with Phase 1 wells to mitigate potential thermal energy losses. Geothermal energy development demands substantial initial investment but entails minimal ongoing costs and workforce requirements. Its eco-friendliness benefits communities, offering higher efficiency and lower maintenance compared to hydroelectricity. Leveraging Ethiopia's geothermal potential is crucial for electricity generation, mineral extraction, and water supply, with plans involving nationwide field expansion to enhance renewable energy capacity.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Geological Journal
Geological Journal 地学-地球科学综合
CiteScore
4.20
自引率
11.10%
发文量
269
审稿时长
3 months
期刊介绍: In recent years there has been a growth of specialist journals within geological sciences. Nevertheless, there is an important role for a journal of an interdisciplinary kind. Traditionally, GEOLOGICAL JOURNAL has been such a journal and continues in its aim of promoting interest in all branches of the Geological Sciences, through publication of original research papers and review articles. The journal publishes Special Issues with a common theme or regional coverage e.g. Chinese Dinosaurs; Tectonics of the Eastern Mediterranean, Triassic basins of the Central and North Atlantic Borderlands). These are extensively cited. The Journal has a particular interest in publishing papers on regional case studies from any global locality which have conclusions of general interest. Such papers may emphasize aspects across the full spectrum of geological sciences.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信