{"title":"参数不确定条件下EPB盾构系统随机应变测量——以德黑兰地铁6号线为例。","authors":"Vahid Amini ,&nbsp;Jafar Khademi Hamidi ,&nbsp;Masoud Monjezi ,&nbsp;Esmaeil Fasihi","doi":"10.1016/j.isatra.2025.01.038","DOIUrl":null,"url":null,"abstract":"<div><div>Tunnels have a crucial role in preventing traffic jams in cities' transportation systems. Therefore, their timely design and construction are fundamental. The past decade has seen the rapid development of Earth Pressure Balance (EPB) machines as the most efficient and safest boring machines in urban areas with the lowest surface subsidence. Nevertheless, despite their numerous benefits, using these machines has disadvantages, such as long-term downtimes and heavy maintenance costs that the projects suffer from. Recently, there has been a surge of interest among researchers in troubleshooting and reducing the downtime of this complex machine. This paper mainly aims to trace and estimate executive elements' impact on machine reliability. To this end, all stops related to 16 subsystems over 12 months were collected and divided into two scenarios, direct (technical) and indirect (technical and executive) factors. According to the results obtained from the preliminary analysis of the raw data: (1) no substantial executive elements were recorded for the navigation subsystem; (2) the trend and serial correlation tests indicated that all Time Between Failures (TBFs) and Time To Repairs (TTRs) from subsystems followed the renewal processes, except for the navigation subsystem's TTR data that followed the non-homogenous poison process (NHPP); (3) the conveyor and segment subsystems were jointly introduced as the most critical subsystem with indirect factors; (4) in contrast, the conveyor subsystem with direct factors was found as the most critical one from the reliability point of view; and (5) the most striking result obtained from the data was that the executive elements could reduce the overall reliability of the EPB machine by about 40 % compared to the contrary scenario.</div></div>","PeriodicalId":14660,"journal":{"name":"ISA transactions","volume":"159 ","pages":"Pages 387-398"},"PeriodicalIF":6.3000,"publicationDate":"2025-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"RAM measure of EPB shield tunneling system under uncertain parameters – A case study in Tehran metro line 6\",\"authors\":\"Vahid Amini ,&nbsp;Jafar Khademi Hamidi ,&nbsp;Masoud Monjezi ,&nbsp;Esmaeil Fasihi\",\"doi\":\"10.1016/j.isatra.2025.01.038\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>Tunnels have a crucial role in preventing traffic jams in cities' transportation systems. Therefore, their timely design and construction are fundamental. The past decade has seen the rapid development of Earth Pressure Balance (EPB) machines as the most efficient and safest boring machines in urban areas with the lowest surface subsidence. Nevertheless, despite their numerous benefits, using these machines has disadvantages, such as long-term downtimes and heavy maintenance costs that the projects suffer from. Recently, there has been a surge of interest among researchers in troubleshooting and reducing the downtime of this complex machine. This paper mainly aims to trace and estimate executive elements' impact on machine reliability. To this end, all stops related to 16 subsystems over 12 months were collected and divided into two scenarios, direct (technical) and indirect (technical and executive) factors. According to the results obtained from the preliminary analysis of the raw data: (1) no substantial executive elements were recorded for the navigation subsystem; (2) the trend and serial correlation tests indicated that all Time Between Failures (TBFs) and Time To Repairs (TTRs) from subsystems followed the renewal processes, except for the navigation subsystem's TTR data that followed the non-homogenous poison process (NHPP); (3) the conveyor and segment subsystems were jointly introduced as the most critical subsystem with indirect factors; (4) in contrast, the conveyor subsystem with direct factors was found as the most critical one from the reliability point of view; and (5) the most striking result obtained from the data was that the executive elements could reduce the overall reliability of the EPB machine by about 40 % compared to the contrary scenario.</div></div>\",\"PeriodicalId\":14660,\"journal\":{\"name\":\"ISA transactions\",\"volume\":\"159 \",\"pages\":\"Pages 387-398\"},\"PeriodicalIF\":6.3000,\"publicationDate\":\"2025-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ISA transactions\",\"FirstCategoryId\":\"94\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0019057825000631\",\"RegionNum\":2,\"RegionCategory\":\"计算机科学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"AUTOMATION & CONTROL SYSTEMS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ISA transactions","FirstCategoryId":"94","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0019057825000631","RegionNum":2,"RegionCategory":"计算机科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"AUTOMATION & CONTROL SYSTEMS","Score":null,"Total":0}
引用次数: 0

摘要

在城市交通系统中,隧道在防止交通堵塞方面起着至关重要的作用。因此,及时的设计和施工是至关重要的。在过去的十年中,土压平衡掘进机(EPB)作为城市地区最高效、最安全、地表沉降最小的掘进机得到了迅速发展。然而,尽管这些机器有很多好处,使用它们也有缺点,比如长期停机时间和项目承受的高昂维护成本。最近,研究人员对故障排除和减少这种复杂机器的停机时间产生了浓厚的兴趣。本文的主要目的是跟踪和估计执行元件对机器可靠性的影响。为此,收集了12个月内涉及16个子系统的所有停止,并将其分为直接(技术)因素和间接(技术和执行)因素两种情况。根据对原始数据的初步分析得出的结果:(1)导航子系统没有记录到实质性的执行要素;(2)趋势检验和序列相关检验表明,除导航子系统的TTR数据遵循非同质中毒过程(NHPP)外,所有子系统的故障间隔时间(tfs)和修复时间(TTRs)数据都遵循更新过程;(3)结合间接因素,将输送机和分段子系统作为最关键子系统联合引入;(4)相比之下,从可靠性的角度来看,具有直接影响因素的输送机子系统是最关键的;(5)从数据中得到的最显著的结果是,与相反的情况相比,执行因素会使EPB机器的整体可靠性降低约40% %。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
RAM measure of EPB shield tunneling system under uncertain parameters – A case study in Tehran metro line 6
Tunnels have a crucial role in preventing traffic jams in cities' transportation systems. Therefore, their timely design and construction are fundamental. The past decade has seen the rapid development of Earth Pressure Balance (EPB) machines as the most efficient and safest boring machines in urban areas with the lowest surface subsidence. Nevertheless, despite their numerous benefits, using these machines has disadvantages, such as long-term downtimes and heavy maintenance costs that the projects suffer from. Recently, there has been a surge of interest among researchers in troubleshooting and reducing the downtime of this complex machine. This paper mainly aims to trace and estimate executive elements' impact on machine reliability. To this end, all stops related to 16 subsystems over 12 months were collected and divided into two scenarios, direct (technical) and indirect (technical and executive) factors. According to the results obtained from the preliminary analysis of the raw data: (1) no substantial executive elements were recorded for the navigation subsystem; (2) the trend and serial correlation tests indicated that all Time Between Failures (TBFs) and Time To Repairs (TTRs) from subsystems followed the renewal processes, except for the navigation subsystem's TTR data that followed the non-homogenous poison process (NHPP); (3) the conveyor and segment subsystems were jointly introduced as the most critical subsystem with indirect factors; (4) in contrast, the conveyor subsystem with direct factors was found as the most critical one from the reliability point of view; and (5) the most striking result obtained from the data was that the executive elements could reduce the overall reliability of the EPB machine by about 40 % compared to the contrary scenario.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
ISA transactions
ISA transactions 工程技术-工程:综合
CiteScore
11.70
自引率
12.30%
发文量
824
审稿时长
4.4 months
期刊介绍: ISA Transactions serves as a platform for showcasing advancements in measurement and automation, catering to both industrial practitioners and applied researchers. It covers a wide array of topics within measurement, including sensors, signal processing, data analysis, and fault detection, supported by techniques such as artificial intelligence and communication systems. Automation topics encompass control strategies, modelling, system reliability, and maintenance, alongside optimization and human-machine interaction. The journal targets research and development professionals in control systems, process instrumentation, and automation from academia and industry.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信