基于暖通空调的海上风电输电网连接方案评估

IF 2 4区 工程技术 Q3 ENGINEERING, ELECTRICAL & ELECTRONIC
Mattia Deriu, Michela Migliori, Corrado Gadaleta, Marco Cortese, Enrico Maria Carlini, Maria Dicorato, Giuseppe Forte, Gioacchino Tricarico
{"title":"基于暖通空调的海上风电输电网连接方案评估","authors":"Mattia Deriu,&nbsp;Michela Migliori,&nbsp;Corrado Gadaleta,&nbsp;Marco Cortese,&nbsp;Enrico Maria Carlini,&nbsp;Maria Dicorato,&nbsp;Giuseppe Forte,&nbsp;Gioacchino Tricarico","doi":"10.1049/gtd2.13252","DOIUrl":null,"url":null,"abstract":"<p>The diffusion of offshore wind power plants (OWPPs), useful to fulfil renewable diffusion policy targets, implies several technological challenges for integration in power transmission network. The definition of the OWPP connection to the transmission network affects possible exploitation of the assets, involves an evaluation of active power losses and loadability and points out the need for compensation devices, in order to comply with connection rules fixed by the grid operator. This paper proposes a methodology to determine the most suitable electric connection for an OWPP based on high-voltage alternating current (HVAC) cables, for providing indications for transmission system operators. In particular, different HVAC connection schemes for OWPPs are analysed, focusing on new 66 kV standard voltage and high-voltage levels, providing technical insight on transmission cable optimal operation conditions. An economic analysis is carried out by proper estimation of construction costs and production forecast, accounting for active power losses and reliability impact. The most suitable connection solution depending on OWPP size and distance in Italian framework is evaluated by means of synthetic techno-economic indicators, further analysing possible sensitivities of energy price and capacity factor.</p>","PeriodicalId":13261,"journal":{"name":"Iet Generation Transmission & Distribution","volume":"18 24","pages":"4209-4220"},"PeriodicalIF":2.0000,"publicationDate":"2024-12-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1049/gtd2.13252","citationCount":"0","resultStr":"{\"title\":\"Assessment of transmission network connection solutions based on HVAC for offshore wind\",\"authors\":\"Mattia Deriu,&nbsp;Michela Migliori,&nbsp;Corrado Gadaleta,&nbsp;Marco Cortese,&nbsp;Enrico Maria Carlini,&nbsp;Maria Dicorato,&nbsp;Giuseppe Forte,&nbsp;Gioacchino Tricarico\",\"doi\":\"10.1049/gtd2.13252\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>The diffusion of offshore wind power plants (OWPPs), useful to fulfil renewable diffusion policy targets, implies several technological challenges for integration in power transmission network. The definition of the OWPP connection to the transmission network affects possible exploitation of the assets, involves an evaluation of active power losses and loadability and points out the need for compensation devices, in order to comply with connection rules fixed by the grid operator. This paper proposes a methodology to determine the most suitable electric connection for an OWPP based on high-voltage alternating current (HVAC) cables, for providing indications for transmission system operators. In particular, different HVAC connection schemes for OWPPs are analysed, focusing on new 66 kV standard voltage and high-voltage levels, providing technical insight on transmission cable optimal operation conditions. An economic analysis is carried out by proper estimation of construction costs and production forecast, accounting for active power losses and reliability impact. The most suitable connection solution depending on OWPP size and distance in Italian framework is evaluated by means of synthetic techno-economic indicators, further analysing possible sensitivities of energy price and capacity factor.</p>\",\"PeriodicalId\":13261,\"journal\":{\"name\":\"Iet Generation Transmission & Distribution\",\"volume\":\"18 24\",\"pages\":\"4209-4220\"},\"PeriodicalIF\":2.0000,\"publicationDate\":\"2024-12-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://onlinelibrary.wiley.com/doi/epdf/10.1049/gtd2.13252\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Iet Generation Transmission & Distribution\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1049/gtd2.13252\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, ELECTRICAL & ELECTRONIC\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Iet Generation Transmission & Distribution","FirstCategoryId":"5","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1049/gtd2.13252","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

摘要

海上风力发电厂(OWPPs)的扩散有助于实现可再生能源扩散政策目标,但也意味着输电网整合的一些技术挑战。OWPP与输电网连接的定义影响到资产的可能开发,涉及有功功率损耗和负载性的评估,并指出需要补偿装置,以符合电网运营商制定的连接规则。本文提出了一种基于高压交流电(HVAC)电缆确定OWPP最合适的电气连接的方法,为输电系统操作员提供指示。重点分析了不同的电网连接方案,重点分析了新的66千伏标准电压和高压水平,为输电电缆的最佳运行条件提供了技术见解。在考虑有功损耗和可靠性影响的情况下,通过合理估算建设成本和生产预测进行经济分析。根据意大利框架中OWPP的大小和距离,通过综合技术经济指标来评估最合适的连接解决方案,进一步分析能源价格和容量因素的可能敏感性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。

Assessment of transmission network connection solutions based on HVAC for offshore wind

Assessment of transmission network connection solutions based on HVAC for offshore wind

The diffusion of offshore wind power plants (OWPPs), useful to fulfil renewable diffusion policy targets, implies several technological challenges for integration in power transmission network. The definition of the OWPP connection to the transmission network affects possible exploitation of the assets, involves an evaluation of active power losses and loadability and points out the need for compensation devices, in order to comply with connection rules fixed by the grid operator. This paper proposes a methodology to determine the most suitable electric connection for an OWPP based on high-voltage alternating current (HVAC) cables, for providing indications for transmission system operators. In particular, different HVAC connection schemes for OWPPs are analysed, focusing on new 66 kV standard voltage and high-voltage levels, providing technical insight on transmission cable optimal operation conditions. An economic analysis is carried out by proper estimation of construction costs and production forecast, accounting for active power losses and reliability impact. The most suitable connection solution depending on OWPP size and distance in Italian framework is evaluated by means of synthetic techno-economic indicators, further analysing possible sensitivities of energy price and capacity factor.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Iet Generation Transmission & Distribution
Iet Generation Transmission & Distribution 工程技术-工程:电子与电气
CiteScore
6.10
自引率
12.00%
发文量
301
审稿时长
5.4 months
期刊介绍: IET Generation, Transmission & Distribution is intended as a forum for the publication and discussion of current practice and future developments in electric power generation, transmission and distribution. Practical papers in which examples of good present practice can be described and disseminated are particularly sought. Papers of high technical merit relying on mathematical arguments and computation will be considered, but authors are asked to relegate, as far as possible, the details of analysis to an appendix. The scope of IET Generation, Transmission & Distribution includes the following: Design of transmission and distribution systems Operation and control of power generation Power system management, planning and economics Power system operation, protection and control Power system measurement and modelling Computer applications and computational intelligence in power flexible AC or DC transmission systems Special Issues. Current Call for papers: Next Generation of Synchrophasor-based Power System Monitoring, Operation and Control - https://digital-library.theiet.org/files/IET_GTD_CFP_NGSPSMOC.pdf
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信