{"title":"考虑上级电网随机停电的园区综合能源系统多目标、多阶段低碳规划","authors":"Xunpu Jiang, Zhejing Bao, Jianwei Chen, Miao Yu","doi":"10.1049/gtd2.13303","DOIUrl":null,"url":null,"abstract":"<p>This article proposes a multi-objective and multi-stage low-carbon planning approach for park integrated energy systems (PIES) considering the impacts of random outages from the superior electrical grid. This approach incorporates optimal multi-stage construction sequencing and stepped carbon emission trading to leverage the economic and low-carbon benefits of long-term planning. First, the islanding modes of PIES are described using four random variables: island type, duration, start time, and typical day of occurrence, from which islanding scenarios are generated based on scenario tree. Next, a multi-objective planning model that considers both economics and reliability is constructed, with the objectives of minimizing the total lifecycle planning cost and the expected economic loss during islanding. The improved Normalized Normal Constraint (NNC) method is proposed to solve the multi-objective planning problem. Then, the fuzzy membership function is used to determine the optimal compromise solution, resulting in a planning scheme that balances economic efficiency and supply reliability. Finally, simulations indicate that, at the cost of a slight increase in planning expenses, the proposed model significantly reduces the loss costs under islanding modes compared with single-objective economic-focused planning. Additionally, the improved NNC method can achieve a more uniform Pareto frontier compared with the conventional NNC method.</p>","PeriodicalId":13261,"journal":{"name":"Iet Generation Transmission & Distribution","volume":"18 22","pages":"3592-3607"},"PeriodicalIF":2.0000,"publicationDate":"2024-10-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1049/gtd2.13303","citationCount":"0","resultStr":"{\"title\":\"Multi-objective and multi-stage low-carbon planning of park integrated energy system considering random outages from superior power grid\",\"authors\":\"Xunpu Jiang, Zhejing Bao, Jianwei Chen, Miao Yu\",\"doi\":\"10.1049/gtd2.13303\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>This article proposes a multi-objective and multi-stage low-carbon planning approach for park integrated energy systems (PIES) considering the impacts of random outages from the superior electrical grid. This approach incorporates optimal multi-stage construction sequencing and stepped carbon emission trading to leverage the economic and low-carbon benefits of long-term planning. First, the islanding modes of PIES are described using four random variables: island type, duration, start time, and typical day of occurrence, from which islanding scenarios are generated based on scenario tree. Next, a multi-objective planning model that considers both economics and reliability is constructed, with the objectives of minimizing the total lifecycle planning cost and the expected economic loss during islanding. The improved Normalized Normal Constraint (NNC) method is proposed to solve the multi-objective planning problem. Then, the fuzzy membership function is used to determine the optimal compromise solution, resulting in a planning scheme that balances economic efficiency and supply reliability. Finally, simulations indicate that, at the cost of a slight increase in planning expenses, the proposed model significantly reduces the loss costs under islanding modes compared with single-objective economic-focused planning. Additionally, the improved NNC method can achieve a more uniform Pareto frontier compared with the conventional NNC method.</p>\",\"PeriodicalId\":13261,\"journal\":{\"name\":\"Iet Generation Transmission & Distribution\",\"volume\":\"18 22\",\"pages\":\"3592-3607\"},\"PeriodicalIF\":2.0000,\"publicationDate\":\"2024-10-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://onlinelibrary.wiley.com/doi/epdf/10.1049/gtd2.13303\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Iet Generation Transmission & Distribution\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1049/gtd2.13303\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, ELECTRICAL & ELECTRONIC\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Iet Generation Transmission & Distribution","FirstCategoryId":"5","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1049/gtd2.13303","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
Multi-objective and multi-stage low-carbon planning of park integrated energy system considering random outages from superior power grid
This article proposes a multi-objective and multi-stage low-carbon planning approach for park integrated energy systems (PIES) considering the impacts of random outages from the superior electrical grid. This approach incorporates optimal multi-stage construction sequencing and stepped carbon emission trading to leverage the economic and low-carbon benefits of long-term planning. First, the islanding modes of PIES are described using four random variables: island type, duration, start time, and typical day of occurrence, from which islanding scenarios are generated based on scenario tree. Next, a multi-objective planning model that considers both economics and reliability is constructed, with the objectives of minimizing the total lifecycle planning cost and the expected economic loss during islanding. The improved Normalized Normal Constraint (NNC) method is proposed to solve the multi-objective planning problem. Then, the fuzzy membership function is used to determine the optimal compromise solution, resulting in a planning scheme that balances economic efficiency and supply reliability. Finally, simulations indicate that, at the cost of a slight increase in planning expenses, the proposed model significantly reduces the loss costs under islanding modes compared with single-objective economic-focused planning. Additionally, the improved NNC method can achieve a more uniform Pareto frontier compared with the conventional NNC method.
期刊介绍:
IET Generation, Transmission & Distribution is intended as a forum for the publication and discussion of current practice and future developments in electric power generation, transmission and distribution. Practical papers in which examples of good present practice can be described and disseminated are particularly sought. Papers of high technical merit relying on mathematical arguments and computation will be considered, but authors are asked to relegate, as far as possible, the details of analysis to an appendix.
The scope of IET Generation, Transmission & Distribution includes the following:
Design of transmission and distribution systems
Operation and control of power generation
Power system management, planning and economics
Power system operation, protection and control
Power system measurement and modelling
Computer applications and computational intelligence in power flexible AC or DC transmission systems
Special Issues. Current Call for papers:
Next Generation of Synchrophasor-based Power System Monitoring, Operation and Control - https://digital-library.theiet.org/files/IET_GTD_CFP_NGSPSMOC.pdf