{"title":"电网规模电池储能系统的集成与控制:挑战与机遇","authors":"Kumars Rouzbehi,&nbsp;Fazel Mohammadi,&nbsp;Juan Manuel Escaño,&nbsp;Vijay K. Sood,&nbsp;Carlos Bordons,&nbsp;Josep M. Guerrero,&nbsp;Mohammad J. Sanjari,&nbsp;Gevork. B. Gharehpetian,&nbsp;Takeshi Hatanaka,&nbsp;Raúl S. Muñoz Aguilar,&nbsp;Jahangir Hossain,&nbsp;José María Maestre","doi":"10.1049/rpg2.13136","DOIUrl":null,"url":null,"abstract":"<p>The current energy storage system technologies are undergoing a historic transformation to become more sustainable and dynamic. Beyond the traditional applications of battery energy storage systems (BESSs), they have also emerged as a promising solution for some major operational and planning challenges of modern power systems and microgrids, for example, enabling the integration of renewable energy sources by reducing their intermittency and improving the voltage, frequency, and reliability profiles of power grids. In other words, energy arbitrage, increased capacity of renewable energy resources, deferred investment in power grid components, reduced congestions, reduced carbon footprint, reduced losses, and stability stress the importance of conducting extensive and ground-breaking research and experimentation in the area of BESSs. This effort will maximize the benefits of using existing and novel BESS technologies in power systems. However, the success in the use of BESSs is driven by many technological developments and cost reductions. The current special issue enables a unique, dedicated opportunity to disseminate state-of-the-art research works in innovative aspects of BESSs from the technology and system points of view.</p><p>In this special issue, twenty-two articles have been received, all of which underwent peer review. Of the twenty-two originally submitted articles, seven have been accepted and the rest have been “rejected,” that is, they did not meet the IET Renewable Power Generation journal criteria for publication. Thus, the overall submissions were of high quality, which marks the success of this special issue. A brief presentation of each of the articles in this special issue follows:</p><p>In [<span>1</span>], the use of a multi-port DC/DC power converter-based BESS as a multi-functional device in improving the transient stability and enhancing the power transmission capacity of high voltage direct current (HVDC) grids is analyzed. The presented control structure is an effective control framework that deals with multi-port DC/DC power converters to achieve DC voltage control and eliminate voltage and power oscillations. Also, the control scheme of the DC/DC converter can control the power flow in the intended transmission line. Analysis and time-domain simulations of the system demonstrate that the presented method gives the system an appropriate and acceptable damping improvement. The presented method simultaneously improves the transient stability of DC voltage and controls power oscillation damping within HVDC grids using BESS.</p><p>In [<span>2</span>], a construction method of lithium-ion batteries' thermoelectric coupling model based on digital twin for the problems of long simulation time and low accuracy in existing models is presented. In this regard, the digital twin structure system of lithium-ion batteries is analyzed, and then the thermoelectric coupling model of the batteries is constructed on the digital twin platform ANSYS TwinBuilder by considering the coupling effects of the thermodynamic model and the equivalent circuit model. Based on ANSYS TwinBuilder, the order of the thermodynamic model is reduced, and then the simulation time is reduced to the second level, which improves the simulation efficiency and meets the real-time simulation requirements of the digital twin. Furthermore, considering that the operating parameters of lithium-ion batteries are variable, the parameters of the equivalent circuit model are identified online based on the variable forgetting factor recursive least squares algorithm, which updates the parameters of the model and improves the simulation accuracy. Finally, the efficiency and accuracy of the model are verified through simulation analysis.</p><p>In [<span>3</span>], a bi-level model of the energy storage system (ESS) planning for renewable energy consumption by considering the boundarization of power flow constraint is presented. To solve the non-convex problem in the power flow equations, a boundarization method with the integration of power flow constraint is incorporated into the bi-level optimization model, which can reflect the influence of power flow constraint on the operation state and charging-discharging power of ESS. Based on the model's solving results, the operational risk index of ESS is presented to achieve the optimal installation location of ESS. Through the analysis of the case study, it is concluded that the upper and lower bound curves of ESS charging and discharging power for different scenarios subject to constraints, such as power flow limit and voltage range, can be obtained by using the presented boundarization method. In addition, the operation risk evaluation index of ESS at different potential nodes can be calculated after the operation simulation. It can be used to evaluate different siting schemes and provide suggestions for the reasonable layout of ESS. Furthermore, the comparison between the presented bi-level model and the single-level model indicates that the presented method, which considers the interaction between ESS planning and operation, can decrease load shedding and improve the consumption proportion of renewable energy.</p><p>In [<span>4</span>], a planned hybrid system's ideal configuration and component sizing are put into practice over a 25-year period. The presented hybrid system includes an inverter that makes it easier to transfer electrically generated energy to users, as well as PV, wind turbine (WT), fuel cell (FC), a water electrolyzer, and a tank of hydrogen gas. The complex optimization problem posed by the presented system is addressed and the best optimal values for the subsystems that make up the entire system are discovered using a novel artificial rabbits optimization (ARO) technique. To assess and confirm the presented ARO's efficacy and applicability in resolving the considered optimization problem, statistical tests are conducted. In comparison to existing optimization algorithms, the presented ARO algorithm demonstrated its adequacy for solving the optimization problem under consideration. Future complex and non-linear engineering issues can be resolved by the presented ARO.</p><p>In [<span>5</span>], the investment strategy for photovoltaic (PV) panels and battery storage to attain the net-zero energy house (ZEH) status within a regional power system comprising a manager and multiple users is explored. It is demonstrated through a case study in Jono, Kitakyushu, that incorporating battery storage into the power system effectively reduces power imbalances and enhances energy utilization efficiency, which is crucial for attaining ZEH objectives. Furthermore, the analysis of the two presented scenarios reveals their potential to decrease annual electricity costs significantly. Additionally, the importance of implementing a proper sharing policy to incentivize individual users to share electricity while preventing the excessive exploitation of communal resources is highlighted.</p><p>In [<span>6</span>], an optimal frequency response coordinated control strategy for hybrid wind-storage power plants, grounded in state reconstruction, is presented to enhance the frequency support capabilities and power generation efficiency of wind power and ESSs. This strategy delves deeply into the nuances of virtual inertia and primary frequency regulation. It is noted that the rapid frequency regulation capacity of a hybrid wind-storage power plant is contingent upon the operational statuses of both wind turbines and energy storage systems. The strategy presented harmonizes the grid's active power reserve requirements with the state reconstruction of the wind-storage system, employing adaptive control parameters in response to increases or decreases in system frequency. The distinct methodologies for virtual inertia and primary frequency regulation are advocated. Specifically, an adaptive virtual inertia control strategy is crafted distinctly for wind turbines and ESSs, hinging on state reconstruction to bolster the speed of frequency response. Moreover, primary frequency regulation is orchestrated through the coordinated control of wind turbines and energy storage, ensuring economical operation and sustained active power support. The efficacy and applicability of the presented frequency response coordinated control strategy are well-established. Overall, this article aims to (1) address practical challenges by applying the presented frequency response coordinated control strategy in engineering contexts where wind turbines and energy storage operate in unison, and (2) explore a plethora of innovative control algorithms for wind turbines and ESSs, specifically tailored for frequency response control.</p><p>In [<span>7</span>], the stability of both frequency and voltage is improved by optimal sitting, sizing, and setting of control parameters of BESS in a low-inertia grid with different penetration levels of renewable energy. A network based on Kundur's four-machine system is modeled for the first study, and two of the four synchronous generators are replaced with wind farms. Then, the production of the third synchronous generator is decreased by 13%. According to the results, the addition of wind farms causes the frequency drop below 49.6 Hz for more than 5 min, indicating instability. It is also demonstrated that with optimal control parameters and placement, a 60 MW BESS can alleviate the voltage and frequency fluctuations, leading to enhanced stability. This method is tested on the IEEE 39-bus network, where the installation of a BESS with a capacity of 9 MVA could restore the frequency stability.</p><p>This special issue reports state-of-the-art research studies of interest to an audience with a background in grid-scale BESS.</p>","PeriodicalId":55000,"journal":{"name":"IET Renewable Power Generation","volume":"18 15","pages":"2835-2837"},"PeriodicalIF":2.6000,"publicationDate":"2024-10-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1049/rpg2.13136","citationCount":"0","resultStr":"{\"title\":\"Integration and control of grid-scale battery energy storage systems: challenges and opportunities\",\"authors\":\"Kumars Rouzbehi,&nbsp;Fazel Mohammadi,&nbsp;Juan Manuel Escaño,&nbsp;Vijay K. Sood,&nbsp;Carlos Bordons,&nbsp;Josep M. Guerrero,&nbsp;Mohammad J. Sanjari,&nbsp;Gevork. B. Gharehpetian,&nbsp;Takeshi Hatanaka,&nbsp;Raúl S. Muñoz Aguilar,&nbsp;Jahangir Hossain,&nbsp;José María Maestre\",\"doi\":\"10.1049/rpg2.13136\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>The current energy storage system technologies are undergoing a historic transformation to become more sustainable and dynamic. Beyond the traditional applications of battery energy storage systems (BESSs), they have also emerged as a promising solution for some major operational and planning challenges of modern power systems and microgrids, for example, enabling the integration of renewable energy sources by reducing their intermittency and improving the voltage, frequency, and reliability profiles of power grids. In other words, energy arbitrage, increased capacity of renewable energy resources, deferred investment in power grid components, reduced congestions, reduced carbon footprint, reduced losses, and stability stress the importance of conducting extensive and ground-breaking research and experimentation in the area of BESSs. This effort will maximize the benefits of using existing and novel BESS technologies in power systems. However, the success in the use of BESSs is driven by many technological developments and cost reductions. The current special issue enables a unique, dedicated opportunity to disseminate state-of-the-art research works in innovative aspects of BESSs from the technology and system points of view.</p><p>In this special issue, twenty-two articles have been received, all of which underwent peer review. Of the twenty-two originally submitted articles, seven have been accepted and the rest have been “rejected,” that is, they did not meet the IET Renewable Power Generation journal criteria for publication. Thus, the overall submissions were of high quality, which marks the success of this special issue. A brief presentation of each of the articles in this special issue follows:</p><p>In [<span>1</span>], the use of a multi-port DC/DC power converter-based BESS as a multi-functional device in improving the transient stability and enhancing the power transmission capacity of high voltage direct current (HVDC) grids is analyzed. The presented control structure is an effective control framework that deals with multi-port DC/DC power converters to achieve DC voltage control and eliminate voltage and power oscillations. Also, the control scheme of the DC/DC converter can control the power flow in the intended transmission line. Analysis and time-domain simulations of the system demonstrate that the presented method gives the system an appropriate and acceptable damping improvement. The presented method simultaneously improves the transient stability of DC voltage and controls power oscillation damping within HVDC grids using BESS.</p><p>In [<span>2</span>], a construction method of lithium-ion batteries' thermoelectric coupling model based on digital twin for the problems of long simulation time and low accuracy in existing models is presented. In this regard, the digital twin structure system of lithium-ion batteries is analyzed, and then the thermoelectric coupling model of the batteries is constructed on the digital twin platform ANSYS TwinBuilder by considering the coupling effects of the thermodynamic model and the equivalent circuit model. Based on ANSYS TwinBuilder, the order of the thermodynamic model is reduced, and then the simulation time is reduced to the second level, which improves the simulation efficiency and meets the real-time simulation requirements of the digital twin. Furthermore, considering that the operating parameters of lithium-ion batteries are variable, the parameters of the equivalent circuit model are identified online based on the variable forgetting factor recursive least squares algorithm, which updates the parameters of the model and improves the simulation accuracy. Finally, the efficiency and accuracy of the model are verified through simulation analysis.</p><p>In [<span>3</span>], a bi-level model of the energy storage system (ESS) planning for renewable energy consumption by considering the boundarization of power flow constraint is presented. To solve the non-convex problem in the power flow equations, a boundarization method with the integration of power flow constraint is incorporated into the bi-level optimization model, which can reflect the influence of power flow constraint on the operation state and charging-discharging power of ESS. Based on the model's solving results, the operational risk index of ESS is presented to achieve the optimal installation location of ESS. Through the analysis of the case study, it is concluded that the upper and lower bound curves of ESS charging and discharging power for different scenarios subject to constraints, such as power flow limit and voltage range, can be obtained by using the presented boundarization method. In addition, the operation risk evaluation index of ESS at different potential nodes can be calculated after the operation simulation. It can be used to evaluate different siting schemes and provide suggestions for the reasonable layout of ESS. Furthermore, the comparison between the presented bi-level model and the single-level model indicates that the presented method, which considers the interaction between ESS planning and operation, can decrease load shedding and improve the consumption proportion of renewable energy.</p><p>In [<span>4</span>], a planned hybrid system's ideal configuration and component sizing are put into practice over a 25-year period. The presented hybrid system includes an inverter that makes it easier to transfer electrically generated energy to users, as well as PV, wind turbine (WT), fuel cell (FC), a water electrolyzer, and a tank of hydrogen gas. The complex optimization problem posed by the presented system is addressed and the best optimal values for the subsystems that make up the entire system are discovered using a novel artificial rabbits optimization (ARO) technique. To assess and confirm the presented ARO's efficacy and applicability in resolving the considered optimization problem, statistical tests are conducted. In comparison to existing optimization algorithms, the presented ARO algorithm demonstrated its adequacy for solving the optimization problem under consideration. Future complex and non-linear engineering issues can be resolved by the presented ARO.</p><p>In [<span>5</span>], the investment strategy for photovoltaic (PV) panels and battery storage to attain the net-zero energy house (ZEH) status within a regional power system comprising a manager and multiple users is explored. It is demonstrated through a case study in Jono, Kitakyushu, that incorporating battery storage into the power system effectively reduces power imbalances and enhances energy utilization efficiency, which is crucial for attaining ZEH objectives. Furthermore, the analysis of the two presented scenarios reveals their potential to decrease annual electricity costs significantly. Additionally, the importance of implementing a proper sharing policy to incentivize individual users to share electricity while preventing the excessive exploitation of communal resources is highlighted.</p><p>In [<span>6</span>], an optimal frequency response coordinated control strategy for hybrid wind-storage power plants, grounded in state reconstruction, is presented to enhance the frequency support capabilities and power generation efficiency of wind power and ESSs. This strategy delves deeply into the nuances of virtual inertia and primary frequency regulation. It is noted that the rapid frequency regulation capacity of a hybrid wind-storage power plant is contingent upon the operational statuses of both wind turbines and energy storage systems. The strategy presented harmonizes the grid's active power reserve requirements with the state reconstruction of the wind-storage system, employing adaptive control parameters in response to increases or decreases in system frequency. The distinct methodologies for virtual inertia and primary frequency regulation are advocated. Specifically, an adaptive virtual inertia control strategy is crafted distinctly for wind turbines and ESSs, hinging on state reconstruction to bolster the speed of frequency response. Moreover, primary frequency regulation is orchestrated through the coordinated control of wind turbines and energy storage, ensuring economical operation and sustained active power support. The efficacy and applicability of the presented frequency response coordinated control strategy are well-established. Overall, this article aims to (1) address practical challenges by applying the presented frequency response coordinated control strategy in engineering contexts where wind turbines and energy storage operate in unison, and (2) explore a plethora of innovative control algorithms for wind turbines and ESSs, specifically tailored for frequency response control.</p><p>In [<span>7</span>], the stability of both frequency and voltage is improved by optimal sitting, sizing, and setting of control parameters of BESS in a low-inertia grid with different penetration levels of renewable energy. A network based on Kundur's four-machine system is modeled for the first study, and two of the four synchronous generators are replaced with wind farms. Then, the production of the third synchronous generator is decreased by 13%. According to the results, the addition of wind farms causes the frequency drop below 49.6 Hz for more than 5 min, indicating instability. It is also demonstrated that with optimal control parameters and placement, a 60 MW BESS can alleviate the voltage and frequency fluctuations, leading to enhanced stability. This method is tested on the IEEE 39-bus network, where the installation of a BESS with a capacity of 9 MVA could restore the frequency stability.</p><p>This special issue reports state-of-the-art research studies of interest to an audience with a background in grid-scale BESS.</p>\",\"PeriodicalId\":55000,\"journal\":{\"name\":\"IET Renewable Power Generation\",\"volume\":\"18 15\",\"pages\":\"2835-2837\"},\"PeriodicalIF\":2.6000,\"publicationDate\":\"2024-10-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://onlinelibrary.wiley.com/doi/epdf/10.1049/rpg2.13136\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IET Renewable Power Generation\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1049/rpg2.13136\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENERGY & FUELS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IET Renewable Power Generation","FirstCategoryId":"5","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1049/rpg2.13136","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

摘要

此外,所提出的双电平模型与单电平模型之间的比较表明,所提出的方法考虑了 ESS 规划与运行之间的相互作用,可以减少甩负荷并提高可再生能源的消耗比例。所介绍的混合动力系统包括一个逆变器,它可以更方便地将发电能源传输给用户,还包括光伏发电、风力涡轮机(WT)、燃料电池(FC)、水电解槽和氢气罐。该系统提出了复杂的优化问题,并利用新型的人工兔子优化(ARO)技术为构成整个系统的各子系统找到了最佳值。为了评估和确认所提出的 ARO 在解决所考虑的优化问题方面的有效性和适用性,进行了统计测试。与现有的优化算法相比,所提出的 ARO 算法证明了它足以解决所考虑的优化问题。在[5]中,探讨了在一个由管理者和多个用户组成的区域电力系统中,为实现净零能耗住宅(ZEH)状态而对光伏板和电池储能进行投资的策略。通过在北九州城野市进行的案例研究证明,将电池储能纳入电力系统可有效减少电力不平衡并提高能源利用效率,这对实现净零能耗目标至关重要。此外,对两种方案的分析表明,它们都具有显著降低年度电力成本的潜力。此外,还强调了实施适当共享政策的重要性,以激励个人用户共享电力,同时防止过度开发公共资源。[6]中提出了一种基于状态重构的风光储混合发电厂最优频率响应协调控制策略,以提高风电和 ESS 的频率支持能力和发电效率。该策略深入探讨了虚拟惯性和一次频率调节的细微差别。据指出,风光储混合发电厂的快速频率调节能力取决于风力涡轮机和储能系统的运行状态。所提出的策略将电网的有功功率储备要求与风能存储系统的状态重建相协调,采用自适应控制参数来应对系统频率的增减。虚拟惯性和主频率调节的不同方法得到了提倡。具体而言,针对风力涡轮机和 ESS 的不同情况制定了自适应虚拟惯性控制策略,以状态重构为基础,提高频率响应速度。此外,通过对风力涡轮机和储能系统的协调控制,可实现一次频率调节,从而确保经济运行和持续的有功功率支持。本文提出的频率响应协调控制策略的有效性和适用性已得到证实。总之,本文旨在:(1)通过将提出的频率响应协调控制策略应用于风力涡轮机和储能协同运行的工程环境中,解决实际挑战;(2)探索大量专门针对频率响应控制的风力涡轮机和 ESS 创新控制算法。首次研究以 Kundur 的四机系统为模型,用风力发电场取代四台同步发电机中的两台。然后,第三台同步发电机的产量减少 13%。研究结果表明,风力发电场的加入会导致频率下降到 49.6 Hz 以下,持续时间超过 5 分钟,表明系统不稳定。结果还表明,如果采用最佳控制参数和位置,60 兆瓦 BESS 可以缓解电压和频率波动,从而增强稳定性。该方法在 IEEE 39 总线网络上进行了测试,安装容量为 9 MVA 的 BESS 可恢复频率稳定。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Integration and control of grid-scale battery energy storage systems: challenges and opportunities

The current energy storage system technologies are undergoing a historic transformation to become more sustainable and dynamic. Beyond the traditional applications of battery energy storage systems (BESSs), they have also emerged as a promising solution for some major operational and planning challenges of modern power systems and microgrids, for example, enabling the integration of renewable energy sources by reducing their intermittency and improving the voltage, frequency, and reliability profiles of power grids. In other words, energy arbitrage, increased capacity of renewable energy resources, deferred investment in power grid components, reduced congestions, reduced carbon footprint, reduced losses, and stability stress the importance of conducting extensive and ground-breaking research and experimentation in the area of BESSs. This effort will maximize the benefits of using existing and novel BESS technologies in power systems. However, the success in the use of BESSs is driven by many technological developments and cost reductions. The current special issue enables a unique, dedicated opportunity to disseminate state-of-the-art research works in innovative aspects of BESSs from the technology and system points of view.

In this special issue, twenty-two articles have been received, all of which underwent peer review. Of the twenty-two originally submitted articles, seven have been accepted and the rest have been “rejected,” that is, they did not meet the IET Renewable Power Generation journal criteria for publication. Thus, the overall submissions were of high quality, which marks the success of this special issue. A brief presentation of each of the articles in this special issue follows:

In [1], the use of a multi-port DC/DC power converter-based BESS as a multi-functional device in improving the transient stability and enhancing the power transmission capacity of high voltage direct current (HVDC) grids is analyzed. The presented control structure is an effective control framework that deals with multi-port DC/DC power converters to achieve DC voltage control and eliminate voltage and power oscillations. Also, the control scheme of the DC/DC converter can control the power flow in the intended transmission line. Analysis and time-domain simulations of the system demonstrate that the presented method gives the system an appropriate and acceptable damping improvement. The presented method simultaneously improves the transient stability of DC voltage and controls power oscillation damping within HVDC grids using BESS.

In [2], a construction method of lithium-ion batteries' thermoelectric coupling model based on digital twin for the problems of long simulation time and low accuracy in existing models is presented. In this regard, the digital twin structure system of lithium-ion batteries is analyzed, and then the thermoelectric coupling model of the batteries is constructed on the digital twin platform ANSYS TwinBuilder by considering the coupling effects of the thermodynamic model and the equivalent circuit model. Based on ANSYS TwinBuilder, the order of the thermodynamic model is reduced, and then the simulation time is reduced to the second level, which improves the simulation efficiency and meets the real-time simulation requirements of the digital twin. Furthermore, considering that the operating parameters of lithium-ion batteries are variable, the parameters of the equivalent circuit model are identified online based on the variable forgetting factor recursive least squares algorithm, which updates the parameters of the model and improves the simulation accuracy. Finally, the efficiency and accuracy of the model are verified through simulation analysis.

In [3], a bi-level model of the energy storage system (ESS) planning for renewable energy consumption by considering the boundarization of power flow constraint is presented. To solve the non-convex problem in the power flow equations, a boundarization method with the integration of power flow constraint is incorporated into the bi-level optimization model, which can reflect the influence of power flow constraint on the operation state and charging-discharging power of ESS. Based on the model's solving results, the operational risk index of ESS is presented to achieve the optimal installation location of ESS. Through the analysis of the case study, it is concluded that the upper and lower bound curves of ESS charging and discharging power for different scenarios subject to constraints, such as power flow limit and voltage range, can be obtained by using the presented boundarization method. In addition, the operation risk evaluation index of ESS at different potential nodes can be calculated after the operation simulation. It can be used to evaluate different siting schemes and provide suggestions for the reasonable layout of ESS. Furthermore, the comparison between the presented bi-level model and the single-level model indicates that the presented method, which considers the interaction between ESS planning and operation, can decrease load shedding and improve the consumption proportion of renewable energy.

In [4], a planned hybrid system's ideal configuration and component sizing are put into practice over a 25-year period. The presented hybrid system includes an inverter that makes it easier to transfer electrically generated energy to users, as well as PV, wind turbine (WT), fuel cell (FC), a water electrolyzer, and a tank of hydrogen gas. The complex optimization problem posed by the presented system is addressed and the best optimal values for the subsystems that make up the entire system are discovered using a novel artificial rabbits optimization (ARO) technique. To assess and confirm the presented ARO's efficacy and applicability in resolving the considered optimization problem, statistical tests are conducted. In comparison to existing optimization algorithms, the presented ARO algorithm demonstrated its adequacy for solving the optimization problem under consideration. Future complex and non-linear engineering issues can be resolved by the presented ARO.

In [5], the investment strategy for photovoltaic (PV) panels and battery storage to attain the net-zero energy house (ZEH) status within a regional power system comprising a manager and multiple users is explored. It is demonstrated through a case study in Jono, Kitakyushu, that incorporating battery storage into the power system effectively reduces power imbalances and enhances energy utilization efficiency, which is crucial for attaining ZEH objectives. Furthermore, the analysis of the two presented scenarios reveals their potential to decrease annual electricity costs significantly. Additionally, the importance of implementing a proper sharing policy to incentivize individual users to share electricity while preventing the excessive exploitation of communal resources is highlighted.

In [6], an optimal frequency response coordinated control strategy for hybrid wind-storage power plants, grounded in state reconstruction, is presented to enhance the frequency support capabilities and power generation efficiency of wind power and ESSs. This strategy delves deeply into the nuances of virtual inertia and primary frequency regulation. It is noted that the rapid frequency regulation capacity of a hybrid wind-storage power plant is contingent upon the operational statuses of both wind turbines and energy storage systems. The strategy presented harmonizes the grid's active power reserve requirements with the state reconstruction of the wind-storage system, employing adaptive control parameters in response to increases or decreases in system frequency. The distinct methodologies for virtual inertia and primary frequency regulation are advocated. Specifically, an adaptive virtual inertia control strategy is crafted distinctly for wind turbines and ESSs, hinging on state reconstruction to bolster the speed of frequency response. Moreover, primary frequency regulation is orchestrated through the coordinated control of wind turbines and energy storage, ensuring economical operation and sustained active power support. The efficacy and applicability of the presented frequency response coordinated control strategy are well-established. Overall, this article aims to (1) address practical challenges by applying the presented frequency response coordinated control strategy in engineering contexts where wind turbines and energy storage operate in unison, and (2) explore a plethora of innovative control algorithms for wind turbines and ESSs, specifically tailored for frequency response control.

In [7], the stability of both frequency and voltage is improved by optimal sitting, sizing, and setting of control parameters of BESS in a low-inertia grid with different penetration levels of renewable energy. A network based on Kundur's four-machine system is modeled for the first study, and two of the four synchronous generators are replaced with wind farms. Then, the production of the third synchronous generator is decreased by 13%. According to the results, the addition of wind farms causes the frequency drop below 49.6 Hz for more than 5 min, indicating instability. It is also demonstrated that with optimal control parameters and placement, a 60 MW BESS can alleviate the voltage and frequency fluctuations, leading to enhanced stability. This method is tested on the IEEE 39-bus network, where the installation of a BESS with a capacity of 9 MVA could restore the frequency stability.

This special issue reports state-of-the-art research studies of interest to an audience with a background in grid-scale BESS.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
IET Renewable Power Generation
IET Renewable Power Generation 工程技术-工程:电子与电气
CiteScore
6.80
自引率
11.50%
发文量
268
审稿时长
6.6 months
期刊介绍: IET Renewable Power Generation (RPG) brings together the topics of renewable energy technology, power generation and systems integration, with techno-economic issues. All renewable energy generation technologies are within the scope of the journal. Specific technology areas covered by the journal include: Wind power technology and systems Photovoltaics Solar thermal power generation Geothermal energy Fuel cells Wave power Marine current energy Biomass conversion and power generation What differentiates RPG from technology specific journals is a concern with power generation and how the characteristics of the different renewable sources affect electrical power conversion, including power electronic design, integration in to power systems, and techno-economic issues. Other technologies that have a direct role in sustainable power generation such as fuel cells and energy storage are also covered, as are system control approaches such as demand side management, which facilitate the integration of renewable sources into power systems, both large and small. The journal provides a forum for the presentation of new research, development and applications of renewable power generation. Demonstrations and experimentally based research are particularly valued, and modelling studies should as far as possible be validated so as to give confidence that the models are representative of real-world behavior. Research that explores issues where the characteristics of the renewable energy source and their control impact on the power conversion is welcome. Papers covering the wider areas of power system control and operation, including scheduling and protection that are central to the challenge of renewable power integration are particularly encouraged. The journal is technology focused covering design, demonstration, modelling and analysis, but papers covering techno-economic issues are also of interest. Papers presenting new modelling and theory are welcome but this must be relevant to real power systems and power generation. Most papers are expected to include significant novelty of approach or application that has general applicability, and where appropriate include experimental results. Critical reviews of relevant topics are also invited and these would be expected to be comprehensive and fully referenced. Current Special Issue. Call for papers: Power Quality and Protection in Renewable Energy Systems and Microgrids - https://digital-library.theiet.org/files/IET_RPG_CFP_PQPRESM.pdf Energy and Rail/Road Transportation Integrated Development - https://digital-library.theiet.org/files/IET_RPG_CFP_ERTID.pdf
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信